Project data:
Length: 3.600 m
Width: 60 m
5 Mio. m³ of earthmoving (cut and fill)
Soil stabilization of formation
Continuous compaction control on formation and subbase
Stabilization of formation level
Working depth: 400 mm
Clayey, silty sandy soil
Compaction with 26 t pad foot and polygon roller
Due to increasing long haul air traffic, the Vancouver The Solution
Airport required expansion to their runway systems.
This project included a 1,000 ft. runway extension as The Vancouver Airport Authority needed a solution that would perform under high volumes
well as a run-up pad that would be used as a bypass of traffic and heavy loads and also provide impermeable, uniform, and strong support for the
for taxing aircraft and to allow aircraft to do engine concrete pavement to be constructed over it. A minimum 4.0 MPa cement treated base (CTB)
run-ups - running their engines above idle after was chosen as the solution that could meet the demands of the project.
maintenance. Due to the noise, this pad is situated as Project Details
far away from the community as possible.
The cement treated base thickness was 300 mm on the runway and taxiway
extension and it was 200 mm on the run-up pad.
The cement treated base material was mixed in a central mixing plant that was only a
few minutes haul from the construction.
The cement treated base was placed with tandem trucks and then graded and
compacted in place.