CASE STUDY

‘TechAbutment®’ for elevated road at


Terminal-2, Mumbai International
Airport, India

Facia type: TerraClass®


Owner: Mumbai International
Airport Ltd.
Designer: Reinforced Earth India
Pvt. Ltd.
Contractor: Larsen & Toubro Ltd.

Construction: Dec -2012 - Nov 2013

BACKGROUND
was evaluated by its merit by L&T and
Mumbai International Airport Pvt Ltd. MIAL before it was accepted by both.
(MIAL), a joint venture between the
GVK and Airports Authority of India, SOLUTION
was awarded the mandate of
modernizing and upgrading Mumbai’s In the detailed design process, RECo
Chhatrapati Shivaji International India used the in-house technical
®
Airport (CSIA) in February 2006. know-how to design the Terre Armee
®
TechAbutment using High Adherence
MIAL appointed Larsen and Toubro Galvanized Steel Strips as soil
(L&T) for construction of this reinforcement. Design was carried out
prestigious project along with the as per BS 8006-1995. Loading
Sahar Elevated Access Road. considered were as per IRC (Indian
Road Congress) – 6 guidelines. Seismic
RECo India who has the experience of design was done based on French M.V. Road End View –A2
working with largest number of standards AFNOR NF-P 94-220.
airports in India, was entrusted by L&T
as a specialized system provider for Well graded fill material having angle
construction of Terre Armee o
of internal friction (Ф)> 32 and unit
(Reinforced Earth®) retaining walls in weight of soil (ϒ) = 21 kN/m and
3

the approaches of the elevated roads. seismic zone – III as per IS 1893 (Part-
The Ramp – 3, down ramp towards M. I) were used.
V. road was also under Reinforced
Earth India’s scope, this ramp was CHALLENGE
crossing a 2 lane road leading to GVK
project office and adjoining locality. In December 2012 the work was taken
There was no alternative route up on M.V. road end – A2 side.
available for this road. So a vehicular However, due to shifting of some
underpass structure was proposed underground city utility at this portion,
within Ramp-3. However, considering the work was delayed and this ramp
the accessibility issues the underpass was completed in June 2013. The
structure could not be constructed existing top 3.0m founding soil was M.V. Road End View-A1
with conventional cast-in-place unsuitable, which was replaced (2.0m
method. The road has to be kept open below pad level) with stone soling and
to traffic 24x7. aggregates with stone dust by L&T. It
was done as a ground improvement
Since RECo India was already present measure.
in the project, they proposed to build
the underpass using Terre Armee® as Post the monsoon, the work was
True Abutments (TechAbutment®). resumed on A1 side in Oct. 2013, like
where the slab is directly supported on A2 side ramp, ground improvement
Terre Armee abutments. The proposal
Engineering Drawings

measures were taken up on this OUTCOME PROJECT SPECIFICATIONS


ramp as well. The panel erection and
backfilling for this ramp were very  TechAbutment® is an economical ®
and time saving alternative to Structure TechAbutment
complex operations as there were
four walls forming box and conventional in-situ abutment ®
System TerraClass
movement of machinery for panel structures.
erection and backfilling was R.C.C. (1.5m x 1.5m x
extremely difficult due to limited  TechAbutment® structures offer Panel Type 0.18m)
excellent ride quality as compared
space available. Hence, it was
to conventional structures with Area 335.00m²
decided to install the panels with
rigid abutments and one end of
single crane from LHS and all the
approach slab resting on Max. Height 6.00m
compaction equipment were kept
embankment.
inside the ramp. The backfill material Design life 100 years
was delivered inside using buckets
attached to crane. The backfill  TechAbutment® structures offer
proposed on A1 side ramp was reduced foundation costs HA® Hot-dip
crushed stone which required compared to conventional Soil Reinforcement Galvanized Steel
relatively less compaction efforts. structures. Strips
The entire work was completed in
the month of November 2013.

SPECIAL FEATURES AND


ADVANTAGES

TechAbutment® allows construction


of approach ramps and the
underpass supports at the same time.
Thus, it optimizes the construction
time substantially and due to
reduction in consumption of
Concrete and Rebar quantity the
overall cost of the underpass
structure is also reduced.