Professional Documents
Culture Documents
UNIVERSITY OF GONDER
INSTITUTE OF TECHNOLOGY
DEPARTEMENT OF ARCHITECTURE
PRESENTED BY:
FREHIWOT NIGUSSIE
Project title: Academic Inernship
Company: Virtual Consulting plc.
Internship period: from march 18th to june 18th 2019
Student: Frehiwot Nigussie
Email: nigussiefrhiwot06@gmail.com
Id no: 4475/08
Adivoser: Mr.Demise Daniel
Programe: BSC-ARC,University of Gonder
.
Content
List figures……………………………………………………………….....v
List of tables……………………………………………………………......v
Declaration………………………………………………...............................vi
Acknowledgement……………………………………………......................vii
Executive summery………………………………………………………..ix
1.1:General Introduction..........................................................................................1
1.2:Back ground of the company............................................................................1
1.2.1:Vision...................................................................................................................1
1.2.2:Mission................................................................................................................1
1.3:Quality objective...................................................................................................1
1.4:Product and service.............................................................................................2
1.5:Customer and end users.....................................................................................3
1.6:Over all structure and work flow.....................................................................3
1.7:Companies previous work and accomplishment...........................................4
Chapter 2-Internship Experience
3.1: Introduction.......................................................................................................67
3.2: practical skills....................................................................................................67
3.3: Theoretical knowledge....................................................................................67
3.4: communication skills .......................................................................................67
3.5: Team playing skill.............................................................................................68
3.6: leadership skill...................................................................................................68
3.7: work ethics..........................................................................................................68
3.9: entrepreneurship skill......................................................................................68
Chapter 4-coclusion and recommendation
4.1:Conclusion...........................................................................................................69
4.2:Recommendation................................................................................................69
4.2.1: For the inter student.....................................................................................69
4.2.2: For Gonder University.................................................................................69
4.2.3: For hosting company....................................................................................70
4.3: reference..............................................................................................................71
List of figures
v/ page
Figure 019:Front view Rendering 2 .....................................................................9
Figure 020:Conference and dormitory Rendering...........................................10
.Figure 021:Top view Training Center Rendering ........................................10
Figure 022:Conference and dormitory Rendering ..........................................11
Figure 023:Top view Training Center Rendering..........................................11
Figure 024:Existing road network map..............................................................12
Figure 025:Existing land use map........................................................................12
Figure 026: 3D Structural plan of Alamata town............................................12
Figure 027:Ground floor plan...............................................................................17
Figure 028:Mezzanine floor plan.........................................................................17
Figure 029: 4th-8th..................................................................................................18
Figure 030: 2nd basement floor plan...................................................................20
Figure 031:1st basement floor plan.....................................................................20
Figure 032:Semi basement floor plan..................................................................21
Figure 033: Ground floor plan..............................................................................21
.Figure 034:Mizzaine floor plan............................................................................22
Figure 035:First floor plan.....................................................................................22
Figure 036:Second floor plan.................................................................................23
Figure 037:Thrid floor plan...................................................................................23
Figure 038:4TH floor plan.....................................................................................24
Figure 039:5TH floor plan.....................................................................................24
Figure 040:6TH floor plan.....................................................................................25
Figure 041:7TH floor plan.....................................................................................25
Figure 042:pyramid..................................................................................................27
Figure 043:weggagen bank logo...........................................................................27
Figure 044:sketching’s.............................................................................................27
Figure 045:Testing Center TopView Rendering.............................................29
Figure 046:Testing Center Rear View Rendering...........................................29
Figure 047:Testing Center Front View Rendering.........................................29
Figure 048:Basement Floor Plan.........................................................................30
Figure 049:Lower Ground Level..........................................................................31
Figure 050:Ground Floor Plan.............................................................................32
Figure 051:1ST Floor Level..................................................................................33
Figure 052:2ND Floor Level.................................................................................34
Figure 053:6TH Floor Level.................................................................................35
Figure 054:Site Rendering’s...................................................................................37
Figure 055:Front Elevation...................................................................................38
Figure 056:Plan drawing........................................................................................38
Figure 057:Ground Floor Plan.............................................................................38
Figure 058:Resort restaurant night view rendering.......................................39
Figure 059:Resort restaurant rear view rendering..........................................39
Figure 060:Resort restaurant front view rendering........................................39
Figure 061:Basement Floor Plan..........................................................................41
Figure 062:Ground Floor Plan.............................................................................41
Figure 063:First Floor Plan..................................................................................42
Figure 064:2ND-8TH Floor Plan........................................................................42
Figure 065:9TH Floor Plan...................................................................................43
v/ page
Figure 066:10TH Floor Plan ........................................................................43
Figure 067:South Elevation ...........................................................................44
Figure 068:North Elevation ..........................................................................44
Figure 069:Section :aa.......................................................................................45
.Figure 070:Section :bb ....................................................................................45
Figure 071:Yohannes Apartment front view rendering 1 ......................46
Figure 072:Yohannes Apartment front view rendering 2g.....................46
Figure 073:Yohannes Apartment Side View Rendering..........................46
Figure 074:Yohannes Apartment Side View Rendering..........................47
Figure 075: Yohannes Apartment Front View Rendering......................47
Figure 076:Yohannes Apartment Front View Rendering ......................47
Figure 077:Yohannes Apartment Top View Rendering .........................48
Figure 078:Yohannes Apartment Side View Rendering .........................48
Figure 079: Yohannes Apartment Front View Rendering......................48
Figure 080:Basement Floor Plan..................................................................50
Figure 081:Ground Floor Plan......................................................................50
Figure 082:First Floor Plan...........................................................................51
Figure 083:Section : aa.....................................................................................51
Figure 084:Nourth Elevation.........................................................................52
Figure 085:South Elevation............................................................................52
Figure 086:Traditional Town House Top View Rendering...................53
Figure 087:Traditional Town House Front View Rendering ...............53
Figure 088:Traditional Town House Rear View Rendering..................53
Figure 089:3D Interior Rendering 1............................................................54
Figure 090:3D Interior Rendering 2............................................................54
Figure 091:3D Interior Rendering 3............................................................54
Figure 092: Basement floor plan....................................................................56
Figure 093: Ground floor plan.......................................................................56
.Figure 094:First floor plan.............................................................................57
Figure 095:Mizzaine floor plan......................................................................57
Figure 096:2TH-7TH floor plan...................................................................58
Figure 097:8TH floor plan..............................................................................58
Figure 098:9TH floor plan.............................................................................59
Figure 099: Office Use Building Rendering...............................................60
Figure 0100:Office Use Building Ground Floor Plan..............................63
Figure 0101: Office Use Building Mezzanine Floor Plan.......................63
Figure 0102:Office Use Building Frist Floor Plan...................................64
Figure 0103: Office Use Building 2ND-4TH Floor Plan.......................64
Figure 0104: Facade Error on yohannes apartmen..................................65
Figure 0105:Space Priority,Arrangment and Size
Error On Yohannes Apartment.....................................................................66
Figure 0106:Space Arrangment Error on yohannes apartment............66
v/ page
List of tables
v/ page
DECLARATION
This report focuses on the internship period which I have been engaged
at virtual consultant, aimed at gaining knowledge and skill practically as
well as theoretically to understand architectural industry.
Frehiwot Nigussie
1/13/2011E.C
vi/ page
Acknowledgement
vii/ page
Executive summery
ix/ page
.
CHAPTER- 1
Internship Hosting Company
.
1.1:General Introduction .They own a family of large format printing and
1.2:Back ground of the company copying machines which include HP 550 Design
Jet Color Plotter and one blue print machine which
The firm as a firm has been established allows to produce and reproduce drawings
under the Ethiopian law on March 2005 (1997EC) efficiently.
as an Anbessa & Associates consulting architects Relevant services carried out as a consultant and
and engineers and now named as Virtual consult- as a professional in the last few years.
ing plc. is consulting architects, engineers and
planners. 1.2.2 .vision
Starting from the day of inception the firm has
signed different projects. TO BE RECOGNIZED AS A LEADER IN
ARCHITECTURAL, URBAN PLANNING AND
Moreover as a professional’s architects, ENGINEERING CONSULTANCY FIRM AND
urban planners, engineers and development BECOMING AN EMPLOYEE’S CHOICE.
specialist have been highly involved in the stud-
ies, designing and implementation of various 1.2.3. Mission
projects, regional development policies, the prepa-
ration of urban plans, the preparation of local TO DELIVER SUCCESS TO THEIR CLIENT
development plans, land information systems, AND STAFF MEMBERS. ALSO ENSURING
urban infrastructure assessment and planning, THE LONG TERM STABILITY OF THE
water supply system study, water investigation, BUSINESS BY PROVIDING HIGH QUALITY
design of engineering structures (reservoirs, AND INNOVATIVE SOLUTION ON TIME.
dams) and in addition they have worked in differ-
ent socio-economic studies for the determining 1.3. Quality Objective
the land use pattern and demand of different
settlements in the region.
THEY WILL ACHIEVE THIER VISION AND
MISSION BY KEEPING THEIR OBJECTIVES
,BOTH AS INDIVIDUALS AND AS THE COM-
The involvement of the professional is namely
PANY OVERALL, WHICH CAN BE SUMMA-
urban infrastructure planning, urban planning,
RIZED AS FOLLOWS:
socio-economic studies, architectural, civil engi-
neering, and development studies. The services
• PROVIDE SERVICES WHICH REPRESENT
rendered by the professional comprise mainly the
VALUE THROUGH INNOVATIVE AND
preparation of study, designing and supervision
QUALITY DELIVERY OF SERVICES AND BY
of different projects.
PROVIDING VALUE FOR MONEY.
Though the consulting firm is established recent-
•PROVIDE REWARDING WORKING ENVI-
ly it has committed itself to work with latest
RONMENT THROUGH CLEAR LEADERSHIP,
technology to enhance efficiency and produce
SUPPORT AND ENCOURAGMENT FOR THE
quality work for its clients. They have installed
STAFF WITH SUCCESSFUL PERFOR-
latest software's Auto-cad 2007-2017, GIS on all
MANCE.
their drafting workstation.
•PROVIDE THEIR CLIENTS AND THE
•They have engineers, architects, urban planners,
ORGANIZAIONS THAT THEY DO BUSINESS
socio-economists, Hydro-geologist, GIS special-
WITH, VALUED CONTRACTS AND FAIR
ists, surveyors and CAD operators who are
TREATMENT WHILE FOSTERING TEAM
working on the design and studies of different
WORK.
projects. They are also using GIS software for
their mapping of large scale planning works.
They have installed all the above mentioned
software on the workstations of the respective
professionals.
1/ page
•PROVIDE SATISFACTION TO THEIR Storm water and drainage disposal
CUSTOMERS AND THE COMMUNITY Water supply Development (Surface,
.
THROUGH DESIGNS ,THAT SUPPORT Ground water)
THEIR REQUIRMENTS ON TIME FROM Waste water disposal system
DIFFERENT PERSPECTIVES Hydraulic Structure
•CREATE A FINANCIALLY SOUND COM- Pollution Controls
PANY BY REDUCING COST AND INCRES-
ING PROFITABILITY. 2.Construction Management And Contract
Adminstraton & Supervision
1.4 :Product and service
Besides building design, Virtual Consulting
Virtual Consulting architects and engi- architects and engineer’s works on construction
neers, has conducted different consultancy tasks management and supervision projects on site,
ranging from architectural design of buildings these tasks involve a management system which
to land planning of different regions and cities. is suitable to conduct construction works on site
The involvement of the professionals is mainly with smooth flow together with the contractors.
architectural, civil engineering, urban planning
and development studies. The services rendered they have site engineers working on this aspect
by the professional comprise mainly the prepa- as construction site managers.
ration of study, designing and supervision of • Project management
different projects. • Construction Coordination
• Construction Supervision
.Thier services include the following: • Contract Administration
1.Engineering Design
2/ page
3.Urban Planning And Urban Design 1.5:Customer and end users
Urban planning and design is the transforma- In construction industry, the term ‘user’ or ‘end
tion and sustainable urban development; creating a users’ typically refers to any persons,groups of
lasting environments. organizations who use property or land as an
occupier,owner,tenant or other stake holder.
Urban design approach for an area shall be
concerned with careful integration of the resources virtual consultant firm have alot of customers
of the built environment in the creation and main- beacuse it provide services which represent
tenance of the public realm. value through innovative and quality delivery
of services . most known customers get
Virtual Consulting architects and engineers has services from virtual consulting firm are:
undertaken urban design studies for the most
historic area of Makelle town namely Mayleham •Ethio telecom
sefere. In addition to this their company has partici- •Golden Sun Trading PLC
pated in urban planning of different regions like •Ethiopian Mine Action Office
Edaga Hamus, Kelekel and Alamata Local develop- •Addis Ababa City Administration
ment plan. •May real estate
•Tigray Region Administration
fig.03 diagram 01
Alamata Local development plan conceptual illustration
fig.04 diagram 02
Alamata Rendring Quality management illustration
3/ page
1.7:Companies previous work and
accomplishment
fig.06
EIC Reandring 1
4/ page
Research and Development
project Description:
fig.08
Ethio telecom Reandring 2
5/ page
Hospitality Projects
Golden Sun plc Hotel
project Description:
fig.11
Golden Sun top view
fig.11
Golden Sun Reandring 2
6/ page
.
.
fig.13
Hawa Adem Hotel Reandring 2
7/ page
.
fig.14
lobby Rendering
Client: Ato Nuredien Abdulatife
Location: Addis Ababa
fig.15
Twin towers Rendering
8/ page
.
Residential Projects
Semira residential
. fig.17
Top view Rendering
.
fig.06
Golden Sun Reandring 2
fig.16 fig.18
Side view Rendering Front view Rendering1
Sara residential
fig.19
Front view Rendering 2
9/ page
Educational Projects
Conference and dormitory facility
project Description:
fig.21
Top view Training Center Rendering
. 10/ page
Housing Projects
Multi Family condominiums
project Description:
Luxury Apartments
project Description:
Client: MAY real estate
MAY real estate has
Project: Luxury Apartments
developed three B+G+10
Location: Addis Ababa, Ethiopia.
luxury apartment blocks in
Total Floor area: 3 block =
Kasanches area behind
31,248 m2
Radisson Blu hotel just a
Status: Completed and occupied
walking distance from
Economic Commission for
Africa, star hotels and
different venues of the city.
fig.23
MAY real estate
11/ page
Educational Projects
Conference and dormitory facility
project Description:
fig.25
Addis Ababa- Leghar Area Urban Development Existing land use map
fig.26
3D Structural plan of Alamata town
12/ page
CHAPTER- 2
Internship Experience
2.1: How do you get in to the company???
13/ page
.
Project title Assignment and Task performed Due
Location
Mikelle mixed use building .Mikelle town .understanding the project space arrange- 1 week
ment and naming the space on each floor
and measuring each space area.
.Consultation with my supervisor.
.adding door and window to each floor plan.
.Consultation with my supervisor.
. Project submission.
.Consultation with my supervisor.
3 week
Window and door details .wulayita region
project on tele building .Giving each door, window and curtain wall
a code name.
.Consultation with my supervisor.
.Identifying how many door, window and
curtain wall exist in each floor.
.Consultation with my supervisor.
.Drawing plan and section for doors, win-
dows and curtain walls, which found in each
floor,
.Consultation with my supervisor.
.Identifying material type for the windows,
doors and curtain walls
.Consultation with my supervisor.
. collecting all of the data together and
presented it in table format.
.Consultation with my supervisor.
. Project submission.
.Consultation with my supervisor.
1 week
Office Building Complex- .Mikelle town . Reading the competition paper properly.
wegagean bank .Consultation with my supervisor.
. Developing concept based on site and
surrounding .
.Consultation with my supervisor.
. developing form.
.Consultation with my supervisor.
.In side Addis . creating 3D interior by tracing already 1 week
Testing Center Buliding
Abeba university finished 2D PLAN .
.Consultation with my supervisor.
office layout design .Butajira .furnishing the plan 2 week
.measuring the distance between the wall and
.furnishes and giving a code name for every
furniture on the plan.
.collecting all of the data I was working on for
a week, together and presented it in table
format
.Consultation with my supervisor.
14/ page
Project title Assignment and Task performed Due
Location
.considering the surrounding context and
Resort Restaurant .wukro the client needs,on the design. 1 week
.schematic design (space,form and other
aspects are to established)
.Consultation with my supervisor.
.some technical aspects(standard dimensions
are configred)
.consultation with my supervisor.
. develop working drawing
.consultation with my supervisor.
.design submission with 3d visualization and
complete working drawing.
.consultation with my supervisor.
.working on finding about the client needs, 4 week
Yohannes apartemnt bole Rwanda researching about surrounding context and
some standards I should follow during the
design.
.consultation with my supervisor.
.schematic design (space,form and other
aspects are to established) and.developing
working drawing
.consultation with my supervisor.
.developing facade.
.consultation with my supervisor.
.design submission with 3d visualization and
complete working drawing.
.Consultation with my supervisor.
.working on final presentation by using the 1 week
company format and Photoshop software.
Atakilti hotel .Addis abeba my exact work is rendering the walls,
columns, windows and furniture’s on the
plan and writing space name and area.
.Consultation with my supervisor.
Tradtional town house .wukro .working on finding about the client needs, 2 week
researching about surrounding context and
some standards I should follow during the
design.
.consultation with my supervisor.
.schematic design (space,form and other
aspects are to established) and.developing
working drawing and material.
.consultation with my supervisor.
.design submission with 3d visualization and
complete working drawing.
.Consultation with my supervisor.
15/ page
2.4:Which work piece or work task you have 2.4.1.5: methodology
been executing 2.4.1.5.1 Methods and. techniques
during my internship period in virtual In this project Auto cad is the main software tool,
consulting plc i have got an opportunity to partici- used to increase the productivity of the design,with
pate on nine different projects and every each one addition of AutoCAD templates.
of them needs their own perspective considration
and working techiques.which are: The Procedure I follow to accomplish the project
was, following instruction of my supervisor on the
project.The instruction is the main guideline for me
2.4.1 Project title:Mikelle mixed use building
in this project.
2.4.1.1 Project description
2.4.1.6 literature review
The building located at Mikelle region, with
floor of G+9. Most part of the project planning
The information derived from relevant source such
was allready finished.
as internet website but most of information
obtained from my supervisor instructions and my
The building contain both residential and commer-
own consideration on the issue.
cial functional spaces on the floors of the building.
2.4.1.7 Conclusion
2.4.1.2Project tasks
The aim of the project is to undrstanding space
.understanding the project space arrangement, arrangemnt and knowing particular position and
then dividing some space on the plan for the shop dimension on the wall,which is suitable position for
purpose.naming space on each floors and measur- door and window , based on function and the size
ing each space area. of space.
.naming space on each floors and measuring each
space area. This kind project particulary created by auto cad
software. so being participated on this project can
. and finally adding door and window to each floor help us to improve our software skill such as accu-
plan based on my supervisor instruction. racey and speed.
2.4.1.3Problem statement and justification I have been challanged not having direct aware
. Problem statement on the project ness with this project background information.be-
Ideal: cause there was lack of explansion on my supervi-
Ideally during working on the project my supervi- sor side.
sor expect me to work based on the consideration
of the form of the building.
Reality:
The form of the building reflect complexity, so it
hard to divide space by considering space function.
fig.27
Ground floor plan
Mezzanine Floor
.
.the floor accomedate
shops,toilet and circulation
spaces
.
fig.28
Mezzanine floor plan
17/ page
4TH-8TH
fig.29
4th-8th
2.4.2 Project title:Window and door details
project .Finally collecting all of the data together and
2.4.1.1 Project description presented it in table format.
.
Window and door details project on tele 2.4.2.3 Problem statement and justification
building ,which found in wulayita region. The . Problem statement on the project
building contain 3B+GF+MF+G+7 floors. The
project was finished before I arrived at the company, Ideal:
but because change of orientation of the site,the Ideally the project expected to be finished soon
building project have to revised again. because the project already completed couple month
ago ,so it just need small readjustment
2.4.2.2Project task Reality:
The floor of the building is many ,at the same time
.Giving each door, window and curtain wall a code i wasnt familiar with this kind of project before ,so
name. it take time to finish all of the detail that have been
asked, without any occurrence of complication.
.Identifying how many door, window and curtain
wall exist in each floor. .Justification on the project
.Drawing plan and section for doors, windows and every project must have its due date based on the
curtain walls, which found in each floor. project capacity.
2.4.2.5: methodology
2.4.2.5.1 Methods and techniques
19/ page
WINDOW AND DOOR DETAIL
130+&$5/".&"/%
"%%3&44-#4&.*#(.'
0''*$--*%*/(
08&/&3-&5)*05&-&$0.8"-":
*5"#3"/$)0''*$&
table 01
door detail
fig.30
2nd basement floor plan VIRTUAL CONSULTING PLC.
130+&$5/".&"/%
"%%3&44-#4&.*#(.'
0''*$--*%*/(
08&/&3-&5)*05&-&$0.8"-":
*5"#3"/$)0''*$&
table 02
door detail
fig.31
1st basement floor plan
VIRTUAL CONSULTING PLC.
20/ page