Report

PRE-POUR INSPECTION REPORT Revision Page | 1


A

Project: Inspection Dates:


Pour No. Area:
Site Conditions: Location:

Item(s) to be cast:

Inspection Activity Compliance? Comments


Y N N/A
1. Form level survey - - -
2. Form preparation, debonding, dowel installation X
3. Pour dimensions and joint layout checked - - -
4. Scratch Template. X
5. Base preparation X
6. Fixing and rigidity of formwork X

Additional Inspection Notes


Note
Details
Reference
None.

Signed (subject to all relevant comments above)


Hold Point
Detail Name Company
Reference
Report
PRE-POUR INSPECTION REPORT Revision Page | 2
A
Report
PRE-POUR INSPECTION REPORT Revision Page | 3
A

Inspectors Name:
Signature:
Date: Date: