Professional Documents
Culture Documents
Client : MEIL
Station : 400/220 kV S/s.-PODILI
Designation : TRANSFORMER
Report Date : 20THAUGUST 2018
1
Laxmi Associates,
Sun Enclave, Office no: 13, 14, 15
Opposite Sun city Paradise,
Manjalpur, Vadodara-390020
Email: lxassociates@gmail.com
Http: www.laxmiassociates.in
Client : MEIL
Tested on : 20/08/2018
Tested By : DHARMENDRA
PURPOSE OF DISTRIBUTION:
2
Test Report of Transformer
Contents
1.0. Background…………………………………………………… 4
2.0. Scope of work………………………………………………………... 4
3.0. Reference………………………………………………………......... 4
4.0. Instrument used……………………………………………………... 4
5.0. Details ofTest & Analysis Report…………………………………… 7
5.1.1. Tanδ And Capacitance Measurement of Winding………7
5.1.2. Insulation Resistance Measurement………………………7
5.1.3. Magnetizing Current Test……………………………………8
5.1.4. Turn Ratio Test………………………………………….....8
5.1.5. Magnetic Balance Test……………………………………....9
5.1.6. Winding Resistance Measurement……………………9
5.1.7. Vector Group Test……………………………………..10
3
Test Report of Transformer
1. Executive Summary:
As a part of preventive maintenance activities activities 400/220 kV S/s. PODILI has decided
to carry out offline testing on their Transformer.
For the stated purpose MEIL – PODILI appointed Laxmi Associates as service provider. The
detailed test results and analysis are given in this document.
2. Scope of work:
Carry out diagnostic testing on transformers and submit a detailed test report.
3. Reference:
The condition of power transformer evaluated in reference with the following standards
and publications.
4. Instruments used:
Calibration
Sl. No Instrument Make Sr. No.
Date
1 CPC 100 Omicron SE639Y 05-08-2018
2 IR tester Fluke 3616028 09-01-2018
3 MultiMeter Fluke 40010307WS 08-01-2018
4 Leakage Meter Meco 14020362 26-11-2017
4
Test Report of Transformer
5
Test Report of Transformer
Contact person
Name Mr.
Phone No. 1 --
E-mail --
6
Test Report of Transformer
7
Test Report of Transformer
APPLY LV SIDE
VOLTAGE APPLIED IN VOLTS MEASURED CURRENT (mAMPS)
TAP NO.
2U – 2V 2V – 2W 2W –2U 2U 2V 2W
- 248.1 251.0 247.6 3.68 2.96 3.86
Voltage Ratio
TA
MEASURED RATIO % ERROR
P CALCULATED
NO. 1U–1V/ 1V–1W/ 1W–1U/ RATIO U V W
2U–2N 2V–2N 2W–2N
1 144.618 144.690 144.740 146.114 0.969 0.975 -0.941
2 141.148 141.229 141.268 141.005 -0.101 -0.159 0.186
3 137.687 137.780 137.815 137.566 -0.088 -0.155 0.181
4 134.137 134.320 134.360 134.127 -0.007 -0.144 0.174
5 130.777 130.860 130.898 130.688 -0.068 -0.132 0.161
6 127.308 127.388 127.439 127.249 -0.047 -0.109 0.149
7 123.857 123.929 123.975 123.810 -0.038 -0.096 0.134
8
Test Report of Transformer
HV Side
LV Side
9
Test Report of Transformer
END OF REPORT
10