DATE Man
S.N. Major planned job Observation
START ENDING power
1.00 Turbine and Generator
proper
MOT internal inspection & Man hole opened & bottom settled dirty oil was removed with cloth and thoroughly cleaned with
1.01
cleaning wheat flour. After cleaning, inspection was done by TSPL. man holes closed.
MSP, TOP, DC LOP All 3 pumps decoupled and motors were taken out for testing . after receiving motors alignment
1.02 inspection and checking, was checked & coupled. All 3 pumps strainers were physically inspected & found OK. No loose
BOP, EXHUST FAN fittings found in pipe lines.
DATE Man
S.N. Major planned job Observation
START ENDING power
All 3 pumps were decoupled. Pump (B) motor was tested. Alignment of all # pumps were choked &
Vacuum Pump alignment
2.02 corrected. Couplings were inspected & found OK. All the 3 pumps were coupled.
and inspection
Both CEP bearing housing CEP(B) bearing housing leakage was attended by replacing scraper ring. Pump A scraper ring yet to
2.04
leak to be attended be replaced.
Hotwell and condenser Hotwell both manholes were opened. hotwell thoroughly cleaned &inspected Man hole doors were
2.05
inspection and cleaning closed.
CST manhole was opened, floating ball was taken out & cleaned resin was taken out & cleaned
CST tank inspection and
2.06 resin was collected out. tank was thoroughly cleaned , coating was inspected and formed ok.
cleaning
Floating ball was placed back in position and man hole was boxed up.
Valve stroke checking,
2.07 All valves stroke was checked, Greasing was done and calibrated. Details enclosed.
greasing, calibration
2.9 CEP alignment inspection CEP (2B) pump decoupled, alignment checked corrected and coupled.
Suction Valve was dismantled, gland found OK. blue matching of valve seat and cone was done &
inspected by customer. Bonnet gasket was replaced and valve was assembled.
TDBFP Booster pump
3.01
suction valve passing
Dearatore inspection Deareator both side man holes were opened & entire Deareator was cleaned thoroughly & then man hole
3.02
and cleaning was closed.
Booster pump strainer Strainer were taken out. cleaned with air & reassembled back in position. Strainer were found in good
3.04
cleaning condition.
MDBFP Booster pump Both the bearing top cover opened & bearings were inspected & found ok.NDE side oil ring was found
3.05
alignment checking damaged &the same were replaced.
Pump was decoupled and pump float was checked. Both side journal bearing & thrust bearing was opened
MDBFP alignment
3.06 & bearing clearance were recorded. DPT of bearing was done and found OK. Bearing clearances and
checking
alignment values enclosed separately.
MDBFP strainer
3.07 MDBFP suction strainers was taken out cleaned and assembled back in position. Strainer was found OK.
cleaning
HP Heaters -1,2,3 man hole doors were opened HP heater 1, 2 studs 4 nos were damaged during opening of
HPH internal
3.08 manholes & the same were replaced. visual inspection was done, some metal pieces and nuts were found
inspection
inside the heates 1&2. The same was taken out. HP heaters 1,2,3 man hole doors were closed.
Tank manhole opened & sediments layer was found. The same was removed with wheat powder. Strainer
Seal oil system skid
was opened and found dirty, after cleaning strainer was assembled back. Float ball link was inspectede &
4.02 fliter cleaning and
adjusted to maintain oiul level. DC seal oil pump was decoupled for inspection of motor, After alignment
tank cleaning
Checked, it was coupled. Seal oil Vacuum pump was taken out and waiting for spare pump.
TD BFP oil tanks TDBFP A & B oil tank manholes were opened and some sediments deposits were found & same was
4.08 internal cleaning and cleaned and inspection done buy coustomer. oil tanks were cleaned with wheat powder. Manhioles of
inspection TDBFP tanks were closed.
Replacement of
4.09 oilfilters(lube oil, EH After oil flushing of filters will be replaced.
oil)
overhauling of DP
4.10 valves setting checked and found ok.
valves
DEH skid filter &
4.11 Filters cleaning done and one damaged filter replaced.
tank cleaning
HP by pass skid filter
4.12 oil drained and skid cleaning and inspection done . oil top up done.
& tank cleaning
Startin
Ending Man
5.00 HV&AC g Observation
date power
date
chiller condenser
5.02 chiller-A, B & C inspection & condenser chemical cleaning done.
chemical cleaning
OCCW pump A& B were decoupled, top casing were opened, rotor were taken out and sleeves were
found damaged on both the rotors. casing & rotor were cleaned, coating was done inside of casing. Pump
OCCW pump
7.04 –A NDE side bearing was replaced as there was some sound in the ball bearing. 4 shaft sleeves were
overhauling
replaced with new sleeves. Gland rope was replaced for the pumps both the pumps were assembled in
position. Pump-A alignment checked and coupled. Pump-B alignment kept pending for motor
7.05 OCCW strainer cleaning OCCW strainer doors were opened & cleaned with water jet & air.
CW hydraulic skid skid oil drained, man hole opened, internal cleaning & inspection done, For external purification
7.06
checking modification done and oil top up done.
Replacement of low
8.01 /HIGH pressure Annexure Enclosed.
passing drain valve
Gland packing repl.
8.02
of MOVs
Valve stroke
8.03 checking, gerasing,
calibration
FCNRV stroke
8.04 Stroke checking done by C&I person
checking
HP Bypass spray
8.05 Cancelled by customer.
nozzle inspection
Underperforming
9.02
cooler up gradation
CCCW pump B
9.03 Pump decoupled after motor inspection alignment done & coupled.
alignment check
Insulation repair
9.04 MSSV insulation works completed.
jobs
HP LP bypass valve
Work done before shut down.
11.02 bonnet bolts
replacement
LP Bypass valve
11.03
A&B passing
Vent line mod. to
11.04
avoid online leaks
Pressure vessel
12.01 Third party inspection
internal insp.
Startin
Major planned Ending Man
SI.NO g Observation
jobs date power
date
Pedestal top covers of Bearing no.3,4,5,6,7,8 ,9 were Taken out. and interference and Stroke clearances
between bearing shell top half and bearing housing were checked with lead wire.
For all bearings 3,4,5,6,7,8,9.Bearing Top halves were opened and Top oil clearance and side oil clearances
were checked .by tightening the Bearing top and bottom halves .Both Top and bottom halves taken out and
Turbine & generator
inspected scoring marks were Observed on Bearings as well as Journals.
1.0 bearings inspection ,
Journals were polished and Bearings were scraped, DPT and UT tests were conducted for Bearings are
DPT, UT, TOC, seal.
found to be good, after assembly of all bearings oil Guards were assembled clearances 0f top and side oil
clearances were noted. Readings noted. enclosed. All the pedestal top covers were reassembled one by one.
Generator rotor
2.0 Not taken Up the Job.
threaded out.
MSV strainer MSV strainers top cover cap nuts were opened by induction heating.3 dowel pins were found in
3.0
inspection In strainer A, strainers cleaned with compressed air,and reassembled A&B .
LP-A bypass valve 1 assembly send to w/s. it was not secting properly. build up material & machined in the
w/s, graphite gasket replaced as the gasket were damaged.
LP by-pass valve A& LP-B by pass valve stem assemble replaced with new one as this not applicable to repair with W/S. LP
4.0
B passing bypass valves opened and inspected it was found that sealing surfaces were damaged.one of the valves seat
and cone was replaced , other one valve seat machined and refitted. Both the valves blue matching checked
between cone and seat, after inspection contact area found good both the valves were assembled.
Servicing of high
5.0
pressure drain valve
TDBFP turbine
6.0
bearing inspection
7.0 BFP bearing 2A,2B Bearing cover removed , cleaning done, DPT carried out, no cracks found, reassembled.
BFP thrust bearing BFP thrust bearing dismantled, inspected, thrust pads cleaned DPT done. Found OK
8.0
inspection re-assembled
BFP alingment
10.0 BFP alignment checked.
checking
TDBFP alignment
TDBFP-2A . coupling dismantled, alignment checked reading found OK. alignment found OK
11.0 checking &
correction.
TDBFP-A lOP A
12.0 Pump dismantelled , blue matching done b/w motor and pump flang Over hauling done
pump overhauling.
TDBFP spring
13.0 Spring inspection done, spring height was recorded (95 mm). found OK.
inspection.
TDBFP rupture disc Rupture discs 2A &2B opened, inspected & found that disc gaskets in damaged condition. new gasket was
14.0
inspection replaced & reassembled the units.
CW pump thrust
15.0 Oil drained and inspection carried out, bearing found ok. oil refilled.
bearing inspecting
LP blades- last stages A,B DPT done, no cracks found. bottom area cleaned & manhole closed.
16.0 LP blade DPT.
LP turbine rupture
18.0 Turbine rupture disks 8 nos were inspected found ok. 1 disk was rectified and reassembled.
Disc inspection
Turning gear
19.0 Top cover plate opened, gears were visually inspected found in gppd condition cover plate reassembled.
inspection.