CONSTRUCTION OF NEW LOAD CENTER-3 AT KING KHALED INTERNATIONAL AIRPORT


Fuel oil Piping System Checklist
Contractor: SSEM IC Ref. No.: 085-IC-M-FOS- 00
Contract No.: R-15-085-BF-0 ITP Ref. No.: 085-ITP-M-GOP- 00
Title: Mechanical Works Sec. Fuel oil system
Drawing. No. / Line No.: Area/Location:
Work / item for Inspection:
GACA/AECOM
Item Activity SSEM SSEM Corr. Remarks
Representative
Engr. QC A R N/A
Sign Off
1.0
Documents/ Material status
1.Verify the pipe material type, size and factory
test reports.
2.Check welding/brazing procedures.
3.check welder certificates

1.1
Installation
1. check Fit-up
2. weld visual inspection
3. NDE Inspection
4. Valve installation
5. Painting/Coating inspection
6. Support installation

1.2
Testing
1.Hydrotesting

GACA/AECOM Representative Remarks:

SSEM QC Representative GACA Representative AECOM Representative


Signed: Signed: Signed:
Name: Name: Name:
Date: Date: Date:

085-IC-M-PS 007

Legend: A=Acceptable; R=Rejected; N/A=Not Applicable P a g e 1 of 1


Legend: A=Acceptable; R=Rejected; N/A=Not Applicable P a g e 2 of 1