Checklist

Welding Fumes Extraction System


Protocol for a DFO80 Installation
Supplier Name: Middle East Development Company Ltd Customer PO#
TINS-PO-045-2018
Customer: Al Mabani General Contractors Co. Date: 1st Mar, 2020
Project Location: Welding Annexe (TINS Studies Project Dammam)
Equipment Brand Name: Nederman (Sweden / EU)

S.No. Items to Check Inspection Remarks


1 Nederman DFO 80 Filter Installation
2 Filter cleaning equipment
3 Installation of compressed air and electricity
4 The function of the safety switch installation
5 The rotation direction of the motor by test start of unit.
6 Fan Inverter Installation
7 Fan NCF 80/20 380V 7,5kW 60Hz Installation
8 Fume Extractor L=3m Original Arm
9 Wall bracket for extraction arm installation
10 G.I round duct installation.