Enclosure of our letter no. Ganjam/2019-20/436 dated 16.08.2019 regarding final offer for the work of
“ Construction of RR Masonry wall
Unit Price (Rs)
Sl. excluding Amount
Brief Description Unit Qty.
No. Taxes and (in Rs.)
BOCW
Random Rubble masonry with hard
stone in foundation and plinths
including leveling up with cement
concrete 1:6:12 (1 Cement: 6 coarse sand:
1. Cum 62.65 3476.07 2,17,775.63
12 graded stone aggregate 20 mm
nominal size) up to plinth level with
cement mortar 1:6 (1 Cement: 6 coarse
sand)
Providing and laying in position cement
concrete of specified grade excluding
the cost of centering and shuttering –
2. All work up to plinth level. “1:2:4 Cum 0.75 4804.93 3603.70
(1 cement: 2 coarse sand (zone-III): 4
graded stone aggregate 20 mm nominal
size)
Earth work in excavation by mechanical
means (Hydraulic excavator) / manual
means over areas (exceeding 30cm in
depth, 1.5m in width as well as 10 sqm
3. Cum 76.79 110.40 8477.25
on plan) including getting out and
disposal of excavated earth, lead up to
50m and lift up to 1.5m,as directed by
Engineer-in-Charge, in all kinds of soil.
Providing and fixing on wall face
unplasticised Rigid PVC rain water
pipes conforming to IS: 13592 Type-A,
4 including jointing with seal ring Mtr. 27.00 207.16 5593.34
conforming to IS:5382, leaving 10 mm
gap for thermal expansion, single
socketed pipes, 110 mm diameter.
Appendix-I
Page : 2 of 2