I have the honour to sibmit herewith the qouted rate for the following items of works for fevour of your kind necessary action Yours
BOQ Shristinagar Guwahati
Name of the Contractor :- It No. Description Unit Qty Rate Amount Providing & laying of band PCC -M15 grade concrete with 25dia PVC sleeves @1500 C/C in the bed of paver block including excavation , filling , 1 shutering, labour,transportation compaction etc complete as per Cum 17 6,010 101,389 specifications & requirements.
Supply, laying and fixing pre-cast concrete hydraulically pressed uni-regular
machine made inter locking paving blocks (M40/M35 Grade) of approved design, transportation of materials, preparation of surface including supplying and filling with dry river sand/crushed dry aggregate to 50mm 2 thick, leveling and compacting with plate vibrator and laying of the inter - locking paving blocks with sand binding and final compaction with plate vibrator of 3 Ton capacity finishing the surface including cutting of blocks at the edges including all labour and material complete. (Paver Block will be supplied by SIDCL at free of cost at one point of site)
2.1 For 60 MM Thk Paver Block Sqm RO 252
2.2 For 80 MM Thk Paver Block Sqm RO 253 2.3 For 100 MM Thk Paver Block Sqm 3938 267 1,051,446 Sub Total 1,152,835 GST @18% 207,510.25 All Total 1,360,345