You are on page 1of 7

CONTRACT NO.

INSTRUMENT SP-020/PG0330/2013-
S7

Date : 02/06/2014
DOCUMENT NO.
SLS-95-INS-LI-004
6 Pages

JASA PERANCANGAN, PENGADAAN DAN INSTALASI SISTEM OTOMASI, SISTEM


METER, SCADA DAN TELEKOMUNIKASI

FIRE AND GAS CAUSE AND EFFECT DIAGRAM - BELAWAN

0 2-Jun-14 Approved for Construction MU/NR IB TA

E 20-May-14 Re - Approved for Design MU/NR IB TA


D 8-May-14 Re - Approved for Design MU/NR IB TA

C 25-Apr-14 Approved for Design MU/NR IB TA

B 14-Apr-14 Issued for Approval MU/NR IB TA

A 19-Feb-14 Issued for Review MU/NR IB RP


Prep'd Check'd Appr'd Check'd Appr'd
Rev. Date Description
Rev. Date Description
PT. SCT BPA PERTAGAS
JASA PERANCANGAN, PENGADAAN DAN INSTALASI
SISTEM OTOMASI, SISTEM METER, SCADA DAN
TELEKOMUNIKASI

DATE : 02-Jun-14
FIRE AND GAS CAUSE AND EFFECT DIAGRAM -
SLS-95-INS-LI-004 REV. 0
BELAWAN
PAGE 2 OF 6

REVISION REVISION
PAGE ATTACH
A B C 0 1 2 3 A B C 0 1 2 3
1 X
2 X
3 X
4 X
5 X X X
6 X X
JASA PERANCANGAN, PENGADAAN DAN INSTALASI
SISTEM OTOMASI, SISTEM METER, SCADA DAN
TELEKOMUNIKASI

DATE : 02-Jun-14
FIRE AND GAS CAUSE AND EFFECT DIAGRAM -
SLS-95-INS-LI-004 REV. 0
BELAWAN
PAGE 3 OF 6

Incorporate
Rev. Code Chapter Page Revision Note comment Remarks
(Yes/No)

A All All Yes


B 5 Edit Tag No. and Add Detectors Yes
C 5&6 Edit Tag No. and Source Yes
JASA PERANCANGAN, PENGADAAN DAN INSTALASI
SISTEM OTOMASI, SISTEM METER, SCADA DAN
TELEKOMUNIKASI

DATE : 02-Jun-14
FIRE AND GAS CAUSE AND EFFECT DIAGRAM -
SLS-95-INS-LI-004 REV. 0
BELAWAN
PAGE 4 OF 6

LEGEND

FSS : FIRE SUPPRESSION SYSTEM


ESD : EMERGENCY SHUTDOWN SYSTEM
FGS : FIRE AND GAS SYSTEM
X : IMMEDIATE ACTION
CE : CAUSE AND EFFECT
GD : GAS DETECTOR
FD : FLAME DETECTOR
SD : SMOKE DETECTOR
HD : HEAT DETECTOR
BC : BEACON
HR : HORN
JASA PERANCANGAN, PENGADAAN DAN INSTALASI SISTEM OTOMASI, SISTEM METER, SCADA DAN TELEKOMUNIKASI

DATE: 02-Jun-2014
SLS-95-INS-LI-004 REV. 0 FIRE AND GAS CAUSE AND EFFECT DIAGRAM - BELAWAN
PAGE 5 OF 6

FIRE PANEL SYSTEM MODBUS COMMUNICATION FAULT ALARM


DESCRIPTION

FIRE PANEL COMMON FAULT ALARM IN F&G PANEL


EFFECT

SMOKE DETECTOR FAULT ALARM TO F&G PANEL

VOTING DETECTED - CONFIRM FLAME ALARM


CE MATRIX

POWER SUPPLY NORMAL LAMP INDICATION

POWER SUPPLY NORMAL LAMP INDICATION


VOTING DETECTED - CONFIRM GAS ALARM
FIRE & GAS SYSTEM

FIRE PANEL COMMON FAULT ALARM


POWER SUPPLY TO PLC FAILURE

POWER SUPPLY FAULT ALARM


SMOKE ALARM TO F&G PANEL

FIRE SUPPRESSION (FM-200)


FLAME DETECTOR ALARM
GAS DETECTOR ALARM

FIRE ALARM BELL 1


FIRE ALARM BELL 2
FIRE ALARM BELL 3
FIRE ALARM BELL 4
FIRE ALARM BELL 5
INTERIAL BUZZER
AUDIBLE ALARM
STROBE LIGHT

ESD
ACTION
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
CAUSE

F&G FIRE ALARM PANEL


UNIT SOURCE TAG NO. DESCRIPTION NOTE
NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 NOTES
FAP NOTE - 6 MODBUS COMMUNICATION LOSS 1 X 1. Refer to Drawing Schematic
FIRE ALARM FAP NOTE - 5 POWER SUPPLY TO POWER PANEL, NORMAL 2 X Diagram of Fire and Gas System
PANEL FAP NOTE - 5 POWER SUPPLY TO POWER PANEL, FAILURE 3 X Belawan ( SLS-95-INS-DW-010).
FAP BLW-FS-002 FIRE PANEL COMMON FAULT ALARM 4 X X
FGS NOTE - 5 POWER SUPPLY TO PLC, NORMAL 5 X
2. Refer to Drawing Fire & Gas System
Layout - Belawan (SLS-95-INS-DW-
FGS NOTE - 5 POWER SUPPLY TO PLC, FAILURE 6 X
F&G PANEL 009).
FGS BLW-MAC-001 MANUAL ALARM CALL (MAC) POINT 7 X X
FGS BLW-MAC-002 MANUAL ALARM CALL (MAC) POINT 8 X X
FGS BLW-GD-001 GAS DETECTOR (BLW-GD-001) 9 X X X
3. Refer to Drawing Layout of Fire
Suppression System at E/I Building -
PIG RECEIVER FGS BLW-GD-002 GAS DETECTOR (BLW-GD-002) 10 X X X
Belawan (SLS-95-HSE-DW-002).
FGS CONFIRMED GAS DETECTORS LOGIC ACTIVATED BY 2oo2 VOTING OF GAS DETECTORS 11 X X X X X
FGS BLW-GD-003 GAS DETECTOR (BLW-GD-003) NOTE - 1 & 2 12 X X X 4. See Page 6 Of 6
KO DRUM, FGS BLW-GD-004 GAS DETECTOR (BLW-GD-004) 13
SCRUBBER &
FGS BLW-GD-005 GAS DETECTOR (BLW-GD-005) 14 5. Refer to Drawing One Line Diagram
CONTROL VALVE
AREA FGS BLW-GD-006 GAS DETECTOR (BLW-GD-006) 15 X X X UPS & UPS Distribution Board -
FGS CONFIRMED GAS DETECTORS LOGIC ACTIVATED BY 2oo4 VOTING OF GAS DETECTORS 16 X X X X X Belawan (SLS-95-ELE-DW-003).
FGS BLW-GD-007 GAS DETECTOR (BLW-GD-007) 17 X X X
FGS BLW-GD-008 GAS DETECTOR (BLW-GD-008) 18 X X X
METERING SKID FGS BLW-GD-009 GAS DETECTOR (BLW-GD-009) 19 X X X 6. Refer to Drawing Overall Drawing
FGS BLW-GD-010 GAS DETECTOR (BLW-GD-010) 20 X X X SCADA Configuration (SLS-70-INS-
FGS CONFIRMED GAS DETECTORS LOGIC ACTIVATED BY 2oo4 VOTING OF GAS DETECTORS 21 X X X X X DW-005).
FGS BLW-FD-001 FLAME DETECTOR (BLW-FD-001) 22 X X
METERING SKID FGS BLW-FD-002 FLAME DETECTOR (BLW-FD-002) 23 X X
FGS CONFIRMED FLAME DETECTORS LOGIC ACTIVATED BY 2oo2 VOTING OF FLAME DETECTORS 24 X X X X
CONTROL VALVE
FGS BLW-FD-003 FLAME DETECTOR (BLW-FD-003) 25 X X
AREA
FGS BLW-SP-004 SMOKE DETECTOR (BLW-SP-004) - ZONE-1 26 X X
ELECTRICAL
FGS BLW-SI-004 SMOKE DETECTOR (BLW-SI-004) - ZONE-2 27 X X
ROOM
FGS CONFIRMED SMOKE DETECTORS LOGIC ACTIVATED BY CROSS ZONE (AT LEAST 2 SMOKE DETECTORS (OTHERS TYPE 28 X X X X
FGS BLW-SP-003 SMOKE DETECTOR (BLW-SP-003) - ZONE-1 29 X X
NOTE - 3 & 4

BATTERY
FGS BLW-SI-003 SMOKE DETECTOR (BLW-SI-003) - ZONE-2 30 X X X
ROOM
FGS CONFIRMED SMOKE DETECTORS LOGIC ACTIVATED BY CROSS ZONE (AT LEAST 2 SMOKE DETECTORS (OTHERS TYPE 31 X X X X
FGS BLW-SP-001 SMOKE DETECTOR (BLW-SP-001) - ZONE-1 32 X X
FGS BLW-SP-002 SMOKE DETECTOR (BLW-SP-002) - ZONE-2 33 X X X
CONTROL
FGS BLW-SI-001 SMOKE DETECTOR (BLW-SI-001) - ZONE-1 34 X X
ROOM
FGS BLW-SI-002 SMOKE DETECTOR (BLW-SI-002) - ZONE-2 35 X X
FGS CONFIRMED SMOKE DETECTORS LOGIC ACTIVATED BY CROSS ZONE (AT LEAST 2 SMOKE DETECTORS (OTHERS TYPE 36 X X X X
FGS BLW-HD-001 HEAT DETECTOR (BLW-HD-001) 37 X X X X X X
FGS BLW-HD-002 HEAT DETECTOR (BLW-HD-002) 38 X X X X X X
CONTROL ROOM
FGS BLW-HD-003 HEAT DETECTOR (BLW-HD-003) 39 X X X X X X
FGS CONFIRMED HEAT DETECTORS LOGIC ACTIVATED BY 2oo3 VOTING OF HEAT DETECTORS 40 X X X X X X X
FGS BLW-HD-008 HEAT DETECTOR (BLW-HD-008) 41 X X X X X X
NOTE-2

BATTERY ROOM FGS BLW-HD-009 HEAT DETECTOR (BLW-HD-009) 42 X X X X X X


FGS CONFIRMED HEAT DETECTORS LOGIC ACTIVATED BY 2oo2 VOTING OF HEAT DETECTORS 43 X X X X X X X
FGS BLW-HD-004 HEAT DETECTOR (BLW-HD-004) 44 X X X X X X
FGS BLW-HD-005 HEAT DETECTOR (BLW-HD-005) 45 X X X X X X
ELECTRICAL
FGS BLW-HD-006 HEAT DETECTOR (BLW-HD-006) 46 X X X X X X
ROOM
FGS BLW-HD-007 HEAT DETECTOR (BLW-HD-007) 47 X X X X X X
FGS CONFIRMED HEAT DETECTORS LOGIC ACTIVATED BY 2oo4 VOTING OF HEAT DETECTORS 48 X X X X X X X
JASA PERANCANGAN, PENGADAAN DAN INSTALASI SISTEM OTOMASI, SISTEM METER, SCADA DAN TELEKOMUNIKASI

DATE: 02-Jun-2014
SLS-95-INS-LI-004 REV. 0 FIRE AND GAS CAUSE AND EFFECT DIAGRAM - BELAWAN
PAGE 6 OF 6

Dry-contact signal to shutdown Air Conditioning for Electrical & Instrument Room
Supervisory Indicator LED at fire suppression panel lits (yellow)

Multitone sounds intermittently and "Evacuate Sign Lamp" lits


Multitone sounds continously and "Evacuate Sign Lamp" lits
Trouble Indicator LED at fire suppression panel lits (yellow)

Electric Control Head actuate cylinder valve to release gas


Device location will be read on LCD FIRE ALARM PANEL
Alarm Indicator LED at fire suppression panel lits (red)

"Gas Discharge Lamp" lits and Fire Alarm Bell sounds


Buzzer at fire suppression panel sounds intermittently
Buzzer at fire suppression panel sounds continously
DESCRIPTION
EFFECT
CE MATRIX
FIRE SUPPRESSION SYSTEM

Dry-contact signal to PA/GA


Dry-contact signal to ESD
See Note 1.
De - ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE
ACTIVE

ACTIVE

ACTIVE
ACTIVE
ACTION

ALARM
ALARM
ALARM
ALARM
ALARM
ALARM
ALARM
ALARM
ROW NO.
CAUSE

UNIT SOURCE TAG NO. DESCRIPTION NOTE


No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NOTES
1. When any alarm in two
ELECTRICAL / INSTRUMENT ROOM

FSS NOTE - 2 Any alarm from smoke and heat detectors 1 X X X X X


zones and delay time (30 sec.)
in progress, delay counter stop
FIRE SUPPRESION FOR

FSS NOTE - 2 Any of two alarm from smoke or heat detectors (votting) + 30 sec. delay NOTE-1 2 X X X X X X X X
at 10 sec. and counter will
FSS NOTE - 2 Manual Station (release) operated for release gas in E/I Building 3 X X X X X X X X X continue after abort switch
BELAWAN

FSS NOTE - 2 Abort Station press and hold NOTE-1 4 X X X X release.

FSS NOTE - 2 Line detector open 5 X X X

FSS NOTE - 2 Pressure Switch operated 6 X X X X 2. Refer to Drawing Scematic


Fire Suppression - Belawan
FSS NOTE - 2 Contact supervisory pressure switch at gas cylinder fails 7 X X X X ( SLS-95-HSE-DW-001).
FSS NOTE - 3 Air Conditioning power supply 220 VAC failure 8 X X X

3. Refer to Drawing One Line


Diagram UPS & UPS
Distribution Board - Belawan
(SLS-95-ELE-DW-003).