You are on page 1of 1

1

2
3
4
ANKIT SAINI
5
PROFILE SUMMARY
I HAVE AROUND 4 YEARS 3 MONTHS OF TECHNICAL EXPERIENCE IN CUSTOMER QUALITY, QUALITY CONTROL AND
IMPLEMENTATION OF NEW PRODUCT. I AM A CERTIFIED LEAN SIX SIGMA GREEN BELT AND HAVE AN EXCELLENT
KNOWLEDGE OF QUALITY TOOLS. I POSSES EXCELLENT WRITTEN AND VERBAL COMMUNICATION SKILLS. HAVING A
GOOD TEAM LEADERSHIP SKILLS AND INVARIABLY MEETS CUSTOMER EXPECTATIONS. I AM WORKING WITH RANETRW
STEERING SYSTEM LTD. AND HAS EXPERIENCE IN QUALITY ISSUE ANALYSIS, FMEA, IMPLEMENTATION AND WARRANTY
ANALYSIS.
CONTACT EDUCATION
PHONE: +919406540866  HITKARINI COLLEGE OF ENGINEERING AND TECHNOLOGYSep’2009 – June’2013
+918962769639 BACHELOR OF ENGINEERING WITH 70.10% INMECHANICAL ENGINEERING.
 KENDRIYA VIDYALAYA V.F.J
EMAIL: ankitsaini2512@gmail.com AISSCE and AISSE from CBSE Board with 75.4% and 77%.
WORK EXPERIENCE
CERTIFICATION
Rane TRW STEERING SYSTEM LTD. SENIOR EXECUTIVE- QA
CERTIFIED LEAN SIX SIGMA GREEN BELT BY IQF JULY 2016 – PRESENT
(CERTIFICATE NO. 12613)  Responsible for scorecard management reviews and applying corrective actions to manage the customer
scorecard to ensure positive ratings for our products.
NX10
 Resolve customer issues with high sense of urgency through customer interaction, facilitating team
INTERNAL AUDITOR (ISO9001-2008) participation & effective root cause analysis.
 Present weekly reports to upper level management on previous weeks quality concern at customer end.
SKILLS  Responsible for developing detailed knowledge of the customer's product and processes.
 Meet with customer representative to provide technical support for product functionality or processing
Customer Quality concerns.
 Track and monitor OEM ppm performance and ensure appropriate corrective actions are taken concerning
Root Cause Analysis exact complaints from customer.
 Travel to customer assembly plants for audits and project reviews.
Lean Quality Tools (FMEA, Fishbone Diagram, Six  Analyzes warranty returned parts, provide feedback to the warranty group through the warranty reports and
Sigma, 5S, 8D Methodology) writes corrective action for nonconforming parts.
Kaizen ,Poka-Yokes  Manage warranty part analysis with internal and external suppliers.
 Participate in weekly QRM meeting
7QC Tool ACHIEVEMENTS
Process Development and Improvement 1. Eliminating steering gearbox mounting thread damage in HFB-64 gear family by doing Gemba & why-why
Process Capability analysis at TATA MOTORS, also provided points for improvement for their sub-assembly line.
2. Received an appreciation letter from Jt. General manager of VEHICLE FACTORY JBP for resolving hard steering
MS Excel issue in stallion vehicles and developing fixture for their gear pre-fitment area.
3. Analysis of steering free issue in tata motors vehicle at 0 km, detecting its root cause and eliminating it.
Lean manufacturing skills
4. Packaging improvement for gearbox and rubber boot modification.
5. Received certificate from RaneTRW pump plant for maintaining zero ppm at OEM (TATA MOTORS JSR).
PROJECT UNDERTAKEN .
SAINI BRAKE SYSTEM PVT. LTD. ENGINEER - QC
JULY 2014–MAY 2016
To eliminate pump cartridge seizure from 2.5 IPTV to 0.5  Responsible for first, last & in-process inspection.
IPTV in 6 MIS
 Conducting pattern correction.
Root cause analysis for steering tank filter back cover  Maintaining TPM & 5S activities on shop floor area.
issue in field by doing FMEA  Handling of product complaints and providing CAPA implementation.
 Updating control plans and production reports.
 Monitoring daily rejection.
PERSONAL DETAILS  Assist in internal & external quality system audit.
 Inwarding inspection for supplier parts.
Date of Birth: 25-Dec-1991  amendment and implementations in documents
Marital Status: Single ACHIEVEMENTS
Languages: English, Hindi, Punjabi
1. Improving 5s system in stores and implementing FIFO system.

I HEREBY DECLARE THAT THE INFORMATION GIVEN HERE IS CORRECT TO MY KNOWLEDGE AND I WILL BE RESPONSIBLE
FOR ANY DISCREPANCY.

You might also like