Schneider Busway
Common Application of Busduct
Transformer to Switchboard
Schneider Busway
Common Application of Busduct
Schneider Busway
Common Application of Busduct
Vertical Plug-in Riser
– Typical Comm., Ind., Res. in HK
Schneider Busway
Common Application of Busduct
Switchboard to Switchboard
– Example: Main Sw Bd to A/C Plant
Schneider Busway
Basic Construction of Busduct
Schneider Busway
High Grade Copper Busbar
Schneider Busway
Temperature Rise
Schneider Busway
Busbar Insulation
Schneider Busway
Integral Ground Bus
Schneider Busway
EZ Joint Pak
Schneider Busway
EZ Joint Pak
Electroplated surface reduce
contact resistance
Each joint pak allows 3 mm
adjustment for thermal
expansion
Reduce installation time and
equipment
Improve reliability
Schneider Busway
Product Range
Feeder, Riser , Plug-in
Common Rating 200A-600A & 800A-5000A
Rated Voltage = 600V
IP rating:
– Feeder : IP40, IP41, IP54, IP65, IP66
– Plug-in / Riser : IP40, IP54
Schneider Busway
Common Fitting
Elbows
– Standard 90o
Schneider Busway
Common Fitting
Elbows
– Other shape available upon request e.g.
Double elbows, Offset, Elbow + flanged end
Schneider Busway
Common Fitting
Flanged End
– For connection to Switchboard
– For connection cable to busduct
Schneider Busway
Common Fitting
Expansion Joint
– Allow ±38mm expansion
– Apply where busduct pass through structural
expansion joint
Schneider Busway
Vertical Hangers
Fixed hangers
Spring Hangers
– Apply in new building
– Eliminate the effect of
settlement
Schneider Busway
Plug-in Units
Schneider Busway
Plug-in Units
Schneider Busway
System Design
Cable Vs busduct
Choice of breaking capacity, IP rating
Earthing system arrangement
Voltage drop consideration
Provision for expansion
Harmonic issue
Schneider Busway
Cable Vs Busduct
Busduct system have advantage in high ampere
range, say 600A or up
Comparison between cable & busduct
Cable Busduct
Space requirement High Low
Heat Dissipation Poor Good
Temperature rise Poor Good
Voltage Drop High Fair
Electromagnetic Interference High Low
Labour Cost Higher Lower
Schneider Busway
Choice of Breaking Capacity
Breaking Capacity
– Main distribution Vs Submain Distribution
– 1 sec and 3 sec requirement
Schneider Busway
Choice of IP Rating
Minimize water hazard
Horizontal Vs Vertical
Corridor Vs meter room
Schneider Busway
Earthing System Arrangement
Schneider Busway
Voltage Drop Consideration
Schneider Busway
Provision of Expansion
Thermal expansion
– Busbar thermal expansion absorbed by joint
pack
– No need to install any expansion joint
Structural expansion
– Busduct cannot absorb expansion
– Shear force can damage busduct
– Expansion fitting should be installed
Schneider Busway
Harmonic Issues
Schneider Busway
Installation Procedure
Schneider Busway
Water / Dust Precaution
Schneider Busway
Water / Dust Precaution
Double packing (plastic bag+carton box)
Schneider Busway
Water / Dust Precaution
Double packing (plastic bag+carton box)
Schneider Busway
Water / Dust Precaution
Apply “rain coat” provided by manufacturer
after installation each day
Schneider Busway
Water / Dust Precaution
Schneider Busway
Quality Project Management Services
Product Training
Site Measurement
Optimum busduct routing design
Detail shop drawing preparation
On site technical support
Training on installation procedure
“Missing Link” and “Remedial Units”
Joint inspection (not contractual service)
Schneider Busway
Missing Links / Remedial Units
Missing link – reserve 1 pc of busduct for final measurement
– Increase accuracy of busudct dimension
– Save time for rectifying installation mistake
– Streamline the installation
Missing Link
Schneider Busway
Missing Links / Remedial Units
A neighborhood factory enhance fast delivery of
missing links and remedial units (within 1 week
delivery to HK)
Schneider Busway
Contractor-Supplier Interaction
Project Start Technical support
and routing deisgn
Schneider Busway
Testing & Commissioning - Factory
Schneider Busway
Testing & Commissioning – On Site
Schneider Busway
Maintenance Issues
Schneider Busway
Vertical Spring Hanger Adjustment
Adjustment need after a period of usage, esp
new building
Make compensation for settlement and
concrete shinkage
Schneider Busway
Vertical Spring Hanger Adjustment
Adjust the length of spring to provide adequate
vertical support to busduct
Schneider Busway
Bowing Symptom
Schneider Busway
Bowing Symptom
Common causes
– Misalignment
– Improper installation, e.g. loosen bolts
– Improper vertical support
Uneven pressure or expansion force the
busduct to bend at “weak points”
Bowing can make permanent deforming of
busduct
Schneider Busway
Thermal Checking / Scanning
Schneider Busway
Trouble shooting
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Some Real Examples
Schneider Busway
Trouble Shooting
Schneider Busway
End of Presentation!