Nanjing Auto Electric Co., Ltd.(NAEC) was established in the year of 2001. We mainly focused on
the development and promotion of automatic prefabrication and construction machines for tank
construction for industries of Oil & Gas, Petroleum, and Petrochemical since company establishment.
We specialized in various automatic tank welding machines for tank farm construction.
In China, four leading oil & gas engineering construction companies all used our tank construction
solutions and automatic equipment to construct the PORT TANK FARM FOR OIL IMPORT,
RECEIVING TANK FARM OF EXPLORATION, FEEDING TANK FARM AND MIDDLE TANK FARM
FOR REFINERY AND PETROCHEMICAL. Also, for the construction of China strategic oil depots,
within nearly 20 years, we have supported SINOPEC, CNPC, CNOOC, CNCEC and all the
Stage I: It is a partial automation age that from completely manual welding to partial automation
welding, this improvement has shortened the construction duration from one year to six months for
one tank.
Stage II: It is a complete mechanization/automation age, the usage of our classic automatic
welding machines has shortened the construction duration for one 100,000 m³ tank from six
Stage III: By full use of our lean-fabrication and lean-construction implementation method, also
combined with our new TOP-TO- BOTTOM construction method, the construction period for one
100,000 m³ tank was shortened to one month from the original three months.
In the same way, by using the above 2) and 3) achievements, from the year of 2004, we cooperated
with world-class international EPC contractors who are specialized in tank engineering, such as CBI
in China, the LNG terminal construction project of SAIPEM in China, the SATORP EXPORT tank
farm of ROTARY constructed in SAUDI, the Tank farm in Fujairah, UAE undertaken by ROTARY for
Of course, our achievements in worldwide is not limited as the above mentioned. And we do believe
Nanjing Auto Electric Co., Ltd.
Add: No. 1 West Fangyuan Road, Jiangning Eco. & Tech. Dev. Zone, Nanjing, China Postcode:211100
Tel: 0086 25 52781628 Fax:0086 25 52782618 Email: foreigntrade@autowelds.com
our solution and achievements are well recognized by the market.
Kindly please find below some of our achievements of our tank welding machines exported
overseas.
AMERICAN
AGW-II/EGW-III 6 sets/ 3 sets
HEADQUARTER
AMERICA C.B.I
SOUTHEAST ASIA BRANCH AGW-II/EGW-III 4 sets/2 sets
AGW-I/II
8 sets
EGW-III
SUDAN JACK & SANOUSSI ENGINEERING WORKS 4 sets
Hydraulic lifting
2 sets
system
AGW-II/EGW-III
SINOPEC No. 4 CONSTRUCTION COMPANY 10 sets/5 sets
Hydraulic lifting
(IN SAUDI PROJECT) 2 sets
system
CHINA NUCLEAR INDUSTRY AGW-I/II 10 sets
FIFTH CONSTRUCTION CORPORATION EGW-III 5 sets
(IN PARKISTAN PROJECT) GRINDING M/C 4 sets
CHINA NUCLEAR INDUSTRY
AGW-I/II 3 sets
23RD CONSTRUCTION CORPORATION
EGW-III 2sets
(IN PARKISTAN PROJECT)
CHINA SHANXI CHEMICAL AGW-I/II 4 sets
CONSTRUCTION CORPORATION EGW-III 2sets
(IN ALGERIA PROJECT) GRINDING M/C 2 sets
CNPC SECOND CONSTRUCTION CORPORATION AGW-I/II/EGW-III 5 sets/3 sets
(IN SUDAN PROJECT) GRINDING M/C 4 sets
AGW-I/II 7 sets
PCC-1 (VIETNAM) EGW-III 4 sets
SADW 2 sets
AGW-I 6 sets
EGW-III 3 sets
SADW 4 sets
QICL (UAE)
GRINDING M/C 2 sets
Hydraulic lifting 3 systems
system
AGW-I
2 sets
EGW-III
2 set
SADW
SERT (IRAQ) 2 sets
GRINDING M/C
1 set
Hydraulic lifting
2 sets
system
AGW-I 1 set
MUNGUN (MONGOLIA)
SADW 1 set
AGW-I
3 sets
EGW-III
1 set
JUMAT GROUP (JORDAN) SADW
1 set
Hydraulic lifting
6 sets
system
AL ANSARI (OMAN) AGW-I 1set
AGW-I 4 sets
ZSCE (MALAYSIA/SINGAPORE) EGW-III 4 sets
SADW 4 sets
AGW-I 4sets
MEYAR (MYANMAR)
EGW-III 2sets
AGW-I
16 sets
EGW-III
8 sets
PT.MAJU (INDONESIA ) SADW
8 sets
Hydraulic lifting
10 sets
system
AGW-I
3 sets
EGW-III
2 sets
FURNACE FABRICA (MOROCCO) SADW
2 sets
Hydraulic lifting
2 sets
system
AGW-I
2 sets
EGW-III
1 set
MUN SIONG (SINGAPORE) SADW
2 sets
Hydraulic lifting
2 sets
system
AGW-I 6 sets
HIAP SENG (SINGAPORE)
EGW-III 6 sets
AGW-I
6 sets
EGW-III
CPFCC(UAE) 6 sets
Hydraulic lifting
2 sets
system
……