2.00 CONCRETE WORKS 2,64,62,323.00 113.28 3,58,747.00 798.99 25,03,427.00 492.32 23,68,541.92 434.04 23,73,518.75
RMC M15- 94.1mm thk Below Footings
- 222.97 7,07,270.00 111.49 3,53,635.00 111.49 3,53,635.00 - 7,07,270.00 -
(entire Basement area as per site)
RMC M7.5- 110mm thk Basement floor
- 284.42 8,63,203.00 - - 284.42 8,63,203.00 - -
with out Pumping - New rate
(5.31) RMC M7.5-75mm thk For Sit out portion 5.31 16,125.00 - - - - - -
RMC-25 Footings with pumping 1,201.72 38,38,296.00 - 400.57 12,79,432.00 400.57 12,79,432.00 400.57 12,79,432.00