Professional Documents
Culture Documents
QUOTATION FOR STANDARD PACKAGE at 1800 Per SQFT - 240308 - 221634
QUOTATION FOR STANDARD PACKAGE at 1800 Per SQFT - 240308 - 221634
CONSTRUCTIONS
NOTE: Measurement will be taken from end of the elevation to end of the parapet wall &
all the civil work under this measurement is in contractor’s scope and we are not going
to deduct any sky lights and duplex portion of the slab.
2D FLOOR PLAN
2D ELECTRICAL LAYOUT
2D PLUMBING LAYOUT
2D STRUCTURAL DESIGN FOR RCC
3D ELEVATION
Earthwork excavation for footings size as per structural drawings depth as per site
Laying foundation bed concrete for footings with 40 mm
down size aggregate In C.C 1:4:8 of 6” Thickness.
Providing RCC footings and columns as per structural designs
with 20 mm downsize Aggregate in CC 1:2:3. (M20)
Foundation will be constructed like first we construct the Ground beam on ground level
SOLID BLOCK Wall: 6” thick SOLID BLOCK masonry wall will be constructed for main
walls and 4” thick wall will be constructed for partition wall with using CM 1:6.
LINTEL: Lintel will be provided all round with RCC M20 Concrete using Reinforcement of
TMT Steel (Fe500/Fe550) #4 No of 12 mm dia Rod, 8 mm dia for rings at 8” c/c will be
used.
The construction of Building 6” thick SOLID BLOCK masonry wall with RCC column
framed structure will be constructed.
R.C.C. CHEJJA: For windows chejjas of 1’6” wide with 6” bearing on either side with 3”
thick of c.c.1:1.5:3 proportion will be provided. Reinforcement as per structural drawing.
R.C.C. LOFT SLAB: Loft slab will be provided as per requirement cc 1:1.5:3 of 3” thick,
reinforcement of Tor 8 mm will be provided on either sides & over 7 ft height in bath rooms
and two sides at kitchen.
R.C.C. ROOF SLAB: Roofing concrete will be M20 grade cement concrete and
reinforcement will be used of TMT Steel as per design.10mm dia Tor steel rods @ 6” c.c.
will be used for main reinforcement. 8 mm dia rod @ 8” c.c. will be used for Distribution;
Roof slab thickness is 5”. Sheet centering will be used for Centering.
PLASTERING: Plastering will be done with cement mortar of 1:6 Proportion with
minimum thickness of 12mm and 18mm plastering for outside walls with cement
mortar of 1:5 with sponge finish. Plastering will be done in P SAND.
STAIRCASE: Staircase will be Mortar finish with 3’0” wide Treads: 10” Riser: 6”,
reinforcement is provided as per requirement.MS Railings will be provided for
staircase with mortar finishing.
Parapet wall 3’0” Hight with 4” thick wall using brick wall plastering both sides.
ELEVATION RAILINGS
ENTRANCE GATE OF 5’ HIGHT (CNC DESIGN WILL COST EXTRA)
For Main doors with seasoned NEEM wood of frame size 6”x4”( for ground floor door
with window will be charged extra)for first & second floor NEEM wood door with
frame will be provided of frame size 6”x4”.Remaining frames will be seasoned NEEM
wood of frames size 5” x 3”with Membrane doors of 1” thick will be
provided.(3000rs\door)Windows will be NEEM wood frames of size 5” x 3” with
hercules shutters of 3” x 1” with plain glass of 5 mm thick provided, and bath room &
toilet doors will be PVC with frame(1500rs\door) will be provided.
Main doors will be provided with Brass fittings of handles (500rs\handle), tower bolts, aldrops &
1 lock (Godrej/Europa) (Rs 2,000.00).
Remaining doors and windows will be provided with SS coated fittings. Tower bolts, etc.
MK
CONSTRUCTIONS
For water supply lines using CPVC pipes of Ashirvad or Astral, hot &cold water
line for exterior and inside will be used as required.
Outlets from overhead tank to ATT toilets for hot/cold water line, geyser
line, shower line, etc., will be provided. Bath rooms Fittings of brand
JAGUAR or CERA, BLUES. Basic continental series will be provided ( Rs
250/Tap, Rs 2000/Wall mixture, Rs 550/Shower, Rs 750/Angle Cock).
Western water closets (2500 Each) will be provided and remaining of Indian
closets will be provided of RS 600/Piece of brand HINDWARE. Wash basins (RS
650 each) will be provided.
Sanitary pipes of 4” and 2” dia with 4kg/cm of ISI make will be provided. Sewage
chambers of required sizes will be provided.
1000 Ltrs of PVC Tank of triple layer coated with ISI brand will be provided. (Make Ganga,
Syntax or Kaveri Rs 5.5/ltr).
For weather proofing of roof slab c.m. plastering using complast liquid of fosroc / Roff
chemicals as water proof compound will be mixed with c.m. and finished with required slope
including necessary curing
NOTE 1: Actual area will be measured after the completion of second floor roof slab & review the exact cost of construction.
NOTE 2: Actually, our company will provide one year insurance in any accidental damage things for building.