MK

CONSTRUCTIONS

NOTE: Measurement will be taken from end of the elevation to end of the parapet wall &
all the civil work under this measurement is in contractor’s scope and we are not going
to deduct any sky lights and duplex portion of the slab.

 2D FLOOR PLAN
 2D ELECTRICAL LAYOUT
 2D PLUMBING LAYOUT
 2D STRUCTURAL DESIGN FOR RCC
 3D ELEVATION

 CEILING HEIGHT WILL BE 10.5 FEET FLOOR TO FLOOR


 FOUNDATION DEPTH 6 FEET
 PLINTH HEIGHT MAX 1.5 FEET

 SOLID BLOCK 6” SOLID BLOCK


 STEEL TMT STEEL ( AS PER THE DESIGN)
 CEMENT BIRLA A1, ULTRATECH (43 GRADE)
 SAND M. SAND, P. SAND
 STONES CRUSHER CRUSHED STONE
 SOIL RED GRAVEL



  

OPPOSITE SSIT COLLEGE MAIN GATE, KUNIGAL ROAD,


TUMKUR
PH: 8073833824/8660771622
MK
CONSTRUCTIONS

 Earthwork excavation for footings size as per structural drawings depth as per site
 Laying foundation bed concrete for footings with 40 mm
down size aggregate In C.C 1:4:8 of 6” Thickness.
 Providing RCC footings and columns as per structural designs
with 20 mm downsize Aggregate in CC 1:2:3. (M20)

Foundation will be constructed like first we construct the Ground beam on ground level

 Then the basement is constructed with block masonry up to plinth level


 After that 6” lintel is provided as plinth beam
 Plinth beam as per structural designs with 20mm downsize aggregate in CC 1:2:3.
(M20)
 For the partition walls of 4 ½” thickness is provided with plinth beams wherever
required.
 Basement filling with waist soil layer by layer compacting and
watering Up to 1ft below basement level then gravel
of 1ft height is provided.
 maximum height of filling is up to 1.5 feet from ground level, more than 1.5 feet consider
as an extra item.

 SOLID BLOCK Wall: 6” thick SOLID BLOCK masonry wall will be constructed for main
walls and 4” thick wall will be constructed for partition wall with using CM 1:6.
 LINTEL: Lintel will be provided all round with RCC M20 Concrete using Reinforcement of
TMT Steel (Fe500/Fe550) #4 No of 12 mm dia Rod, 8 mm dia for rings at 8” c/c will be
used.
 The construction of Building 6” thick SOLID BLOCK masonry wall with RCC column
framed structure will be constructed.
 R.C.C. CHEJJA: For windows chejjas of 1’6” wide with 6” bearing on either side with 3”
thick of c.c.1:1.5:3 proportion will be provided. Reinforcement as per structural drawing.
 R.C.C. LOFT SLAB: Loft slab will be provided as per requirement cc 1:1.5:3 of 3” thick,
reinforcement of Tor 8 mm will be provided on either sides & over 7 ft height in bath rooms
and two sides at kitchen.
 R.C.C. ROOF SLAB: Roofing concrete will be M20 grade cement concrete and
reinforcement will be used of TMT Steel as per design.10mm dia Tor steel rods @ 6” c.c.

OPPOSITE SSIT COLLEGE MAIN GATE, KUNIGAL ROAD,


TUMKUR
PH: 8073833824/8660771622
MK
CONSTRUCTIONS

will be used for main reinforcement. 8 mm dia rod @ 8” c.c. will be used for Distribution;
Roof slab thickness is 5”. Sheet centering will be used for Centering.

OPPOSITE SSIT COLLEGE MAIN GATE, KUNIGAL ROAD,


TUMKUR
PH: 8073833824/8660771622
MK
CONSTRUCTIONS

 PLASTERING: Plastering will be done with cement mortar of 1:6 Proportion with
minimum thickness of 12mm and 18mm plastering for outside walls with cement
mortar of 1:5 with sponge finish. Plastering will be done in P SAND.
 STAIRCASE: Staircase will be Mortar finish with 3’0” wide Treads: 10” Riser: 6”,
reinforcement is provided as per requirement.MS Railings will be provided for
staircase with mortar finishing.
 Parapet wall 3’0” Hight with 4” thick wall using brick wall plastering both sides.

 ELEVATION RAILINGS
 ENTRANCE GATE OF 5’ HIGHT (CNC DESIGN WILL COST EXTRA)

 For Main doors with seasoned NEEM wood of frame size 6”x4”( for ground floor door
with window will be charged extra)for first & second floor NEEM wood door with
frame will be provided of frame size 6”x4”.Remaining frames will be seasoned NEEM
wood of frames size 5” x 3”with Membrane doors of 1” thick will be
provided.(3000rs\door)Windows will be NEEM wood frames of size 5” x 3” with
hercules shutters of 3” x 1” with plain glass of 5 mm thick provided, and bath room &
toilet doors will be PVC with frame(1500rs\door) will be provided.

Main doors will be provided with Brass fittings of handles (500rs\handle), tower bolts, aldrops &
1 lock (Godrej/Europa) (Rs 2,000.00).
Remaining doors and windows will be provided with SS coated fittings. Tower bolts, etc.

OPPOSITE SSIT COLLEGE MAIN GATE, KUNIGAL ROAD,


TUMKUR
PH: 8073833824/8660771622
m

MK
CONSTRUCTIONS

 OVER ALL FLOORING WITH VITRIFIED TILES WITH IN PRICE


@ 50/SQFT
 BATHROOM FLOORING WITH VITRIFIED TILES OF SIZE 600 X 600 MM @35/SQFT
 BATHROOM WALL WITH VITRIFIED TILES OF SIZE 450 X 300 MM @40/SQFT
 KITCHEN WALL WITH VITRIFIED TILES OF SIZE 450 X 300 MM @40/SQFT
 KITCHEN PLATFORM TOPPING WITH HIGH GLOSSY GRANITE @180/SQFT
 BALCONY / UTILITY FLOORING WITH VITRIFIED TILES OF SIZE 600 X 600MM
@50/SQFT
 PARKING WITH VITRIFIED TILES OF SIZE 600 X 600MM 16MM THICK @50/SQFT
 FRONT WALL UP TO MAIN DOOR (7’) COVERED WITH TILES @60/SQFT, over 7’ feet shall
charged extra

 For water supply lines using CPVC pipes of Ashirvad or Astral, hot &cold water
line for exterior and inside will be used as required.
 Outlets from overhead tank to ATT toilets for hot/cold water line, geyser
line, shower line, etc., will be provided. Bath rooms Fittings of brand
JAGUAR or CERA, BLUES. Basic continental series will be provided ( Rs
250/Tap, Rs 2000/Wall mixture, Rs 550/Shower, Rs 750/Angle Cock).

 Western water closets (2500 Each) will be provided and remaining of Indian
closets will be provided of RS 600/Piece of brand HINDWARE. Wash basins (RS
650 each) will be provided.
 Sanitary pipes of 4” and 2” dia with 4kg/cm of ISI make will be provided. Sewage
chambers of required sizes will be provided.
 1000 Ltrs of PVC Tank of triple layer coated with ISI brand will be provided. (Make Ganga,
Syntax or Kaveri Rs 5.5/ltr).

OPPOSITE SSIT COLLEGE MAIN GATE, KUNIGAL ROAD,


TUMKUR
PH: 8073833824/8660771622
MK
CONSTRUCTIONS

For weather proofing of roof slab c.m. plastering using complast liquid of fosroc / Roff
chemicals as water proof compound will be mixed with c.m. and finished with required slope
including necessary curing

 ALL NECESSARY POINTS WHERE EVER REQUIRED THROUGHOUT THE BUILDING


 GM/HI-FI MODULAR STEEL BOX IN WALL
 GM/HI-FI SWITCHES RATE RS 14/SWITCH
 AC PONTS IN BEDROOMS
 GYSER POINTS IN BATHROOMS
 AH POINS IN KITCHEN
 SOCKETS WHER EVER REQUIRED
 PVC INSULATED COPPER WIRE OF Ve to
 M.C.B. DISTRIBUTION BOARD STANDARD SWITCHGEAR, INDO KOPP

 INSIDE PAINTING - 5 COATS, 1 COAT PRIMER, 2 COAT PUTTY, 2


COAT EMULSION (PUTTY ASIAN, TRACTOR
EMULSION PAINT ASIAN)
 OUTSIDE PAINTING - 3 COATS, 1 COAT PRIMER, 2 COAT APEX
 DOORS & WINDOWS - 5 COAT PU POLISH FOR MAIN DOOR ( HAND POLISH)
 BRAND - INDIGO/JSW/ASIAN

OPPOSITE SSIT COLLEGE MAIN GATE, KUNIGAL ROAD,


TUMKUR
PH: 8073833824/8660771622
MK
CONSTRUCTIONS

 Construction of building as per approved drawing, relevant IS Code and general


practices.
 Construction of compound wall as per elevation and approved drawing.
 Construction of sump tank and placing of overhead tank (Will be charged extra in SQFT).
 Water pump will be borne by Owner.
 Earthlings will be done.
 Water pipe, sponge, mesh, salve rope etc., will be bear by contractor.
 Water proofing liquid will be provided.
 Construction of drainage in front of house shall be charged extra @ 1000/sqft
 Front elevation cladding tiles shall be charged

 ANY DEPARTMENTAL WORK


 ANY DEPOSITS
 ANY APPROVALS
 WATER FOR CONSTRUCTION
 TEMPORARY & PERMANENT ELECTRIC CONNECTION CHARGES & ELECTRIC BILLS
 BOREWELL WITH FITTINGS
 UGD CONNECTION, UG ELECTRIC CABLE & GAS LINE PIPING
 BASEMENT HIGHT COST EXTRA IF EXTENDED ABOVE 4’-0”
 POP OR FALSE CEALING
 LAND SCAPING ANY GARDENING ARTIFICIAL OR NATURAL
 ANY WORK OTHER THAN WORK MENTIONED IN QUOTATION SHOULD
BE CARRYOUT BEFORE EXECUTION.
 RATE SHOULD BE DISCUSSED BEFORE EXECUTION
 ANY IDOLS AND ARTS
 FURNITURES LIKE SOFA, MATRESSES, DINNING TABLE, OR ANY CHAIRS OR

OPPOSITE SSIT COLLEGE MAIN GATE, KUNIGAL ROAD,


TUMKUR
PH: 8073833824/8660771622
MK
CONSTRUCTIONS
TABLES
 LIGHTS AND FANS
 WARDROBES
 DEMOLITION CHARGES WILL BE EXTRA

OPPOSITE SSIT COLLEGE MAIN GATE, KUNIGAL ROAD,


TUMKUR
PH: 8073833824/8660771622
MK
CONSTRUCTIONS

 PERIOD OF COMPLITION WORK 10 MONTHS ( 2 MONTHS MAY GET INCREASE)


 WORK SCHEDULE WILL PREPARE AFTER AGREEMENT
 PAYMENTS SHOULD BE DONE IN ADVANCE BEFORE EXECUTION OF WORK & THE
FINAL PAYMENT MUST BE PAID 15 DAYS EARLIER BEFORE OPENING OF
CONSTRUCTING HOUSE, UNTIL THE FULL SETTELMENT OF THE PAYMENT DONE
BY THE OWNER, CONTRACTOR HAS RIGHTS TO REFUSE TO HANDOVER SAID
BUILDING.
 PAYMENT SCHEDULE WILL DONE WITH REFRENCE OF WORK SCHEDULE

1. 0n Agreement Rs. 15%


2. Completion of basement Rs. 15%
3. Completion of G.F Roof Slab Rs. 15%
4. Completion of F.F Roof Slab Rs. 15%
5. Completion of Plastering Rs. 15%
6. Completion of Flooring Rs. 10%
7. Before painting Rs 10%
8. Before completion of Final work Rs. 5%

NOTE 1: Actual area will be measured after the completion of second floor roof slab & review the exact cost of construction.

NOTE 2: Actually, our company will provide one year insurance in any accidental damage things for building.

OWNER WITNESS CONTRACTOR

OPPOSITE SSIT COLLEGE MAIN GATE, KUNIGAL ROAD,


TUMKUR
PH: 8073833824/8660771622
MK
CONSTRUCTIONS

OPPOSITE SSIT COLLEGE MAIN GATE, KUNIGAL ROAD,


TUMKUR
PH: 8073833824/8660771622

You might also like