2| BIM
Owner Problems

Over 60% of major capital 30% of construction 55% of maintenance remains


programs fail to meet cost cost is rework2 reactive3
and schedule targets1

Source : Autodesk - BIM-for-Owners-deck-FINAL-.pptx


A foundational, intelligent model-based process for
business and industry transformation

Uses 3D models to Provides greater Uses and shares the Enables prompt
capture, explore, and project insight for same consistent data response to change
maintain consistent cost, schedule, and whether you’re at with processes that
and coordinated constructability your desk or in the are smarter and
planning, design, field faster
construction, and
operational data
Source : Autodesk - BIM-for-Owners-deck-FINAL-.pptx
Reduced document errors and omissions 61%

Reduced rework 36%

Reduced construction cost 30%

Reduce project duration 22%

Fewer claims/litigation 17%

Source : Autodesk - BIM-for-Owners-deck-FINAL-.pptx


3| Project Reference
BP Tangguh LNG Jetty - 2
Jebel Ali Port - UAE

Source : delta marine consultants


Jebel Ali Jetty

Source : delta marine consultants


Jebel Ali Jetty

Source : delta marine consultants


Jebel Ali Jetty

Source : delta marine consultants


Hamad Port – Doha - Qatar

Bull clips case study


BIM 360
Lock Gate – Cadzand – The Netherland

Source : delta marine consultants


Lock Gate – Cadzand – The Netherland

Source : google street


Den Haag Centraal – The Netherland

Source : BAM Infraconsult & google street


Den Haag Centraal – The Netherland

Source : BAM Infraconsult & google street


One World Trade Center - USA
3D Model
York Street Interchange (YSI)

31 Presentation Title

Source : Paddy Crraig – AECOM UK


York Street Interchange (YSI)
3D Model
− Pricing
− Buildability
− Visual Aid
− Clashes
− Shows final layout, can be updated to be an
‘as-built’ model

Source : Paddy Crraig – AECOM UK


Construction Process 2D AutoCad

Basis of design – 2D Drawing

2D Drawing – Stripped back

Source : Paddy Crraig – AECOM UK


Construction Process – Civil 3D

− Converting 2D design to 3D model


− Everything created by using a 2D shape and extruding
− Chamber Example;

Source : Paddy Crraig – AECOM UK


Construction Process - Attributes

− Important Part of BIM model


− Identify what material is made from, how much
material is needed and other important
information
− Helps Contractor price the job

Source : Paddy Crraig – AECOM UK


Construction Process - Attributes

− Attributes in line with BIM Toolkit


Classifications
− Each item has a unique reference that is
recognised industry wide.
− Level 2 BIM requirement is;

“A description of the type of object to detail any


design intent.”

Can put in as much detail as you want – the more the


better

https://toolkit.thenbs.com

Source : Paddy Crraig – AECOM UK


Model Complete...ish

Source : Paddy Crraig – AECOM UK


http://www.yorkstreetinterchange.com/index.html

Questions?

38 Presentation Title

https://knowledge.autodesk.com/community/screencast/206f26d6-e367-4536-9904-5368621e53ea
Source : Paddy Crraig – AECOM UK