Review of DPR and Contract Agreement

Establishment of
QAP Lab To find an accredited lab
1.Quarry of Aggregate, Sand and
Soil.
2.Steel,Cement,Admixture,Bitumen,
Identification of Geo-Composite, Bearing, Pre- Material Sampling & Testing
ITP Test the Source stressing material and other as per
Methodology
Procedure project required material.

Planning for 1. Crusher


Type of Plants 2. RMC
2. WMM
3. Hot Mix Plant Proceed for Approval
Costing of the
source
Proceed for Approval
Calibration of
Lab Equipment
and Plants

As per specification
Material Consumption Conducting the Test RFI for Execution
Documentation
As required activity
1.Daily Approvel of R
Inform to Planning inspection and
Department approvel from Client 2. Prepration of Dail
Routin Test Report

If any NCR issued from Client Crust Verification


teacking the NOC

Data Send to Managment


proceed for COD
d Contract Agreement

To find an accredited lab


Mix Design

Geotechnical
investigation
terial Sampling & Testing

Testing
Testing 1. MDD
Concrete 1. GSB Collection of 2. OMC
2. WMM Samples 3. GSA
3. DBM 4. FSI
pproval 4. BC 5. CBR
5. SSB If Required 6. SPT

Design Team

Execution Team work


RFI for Execution proceed as per program
design and drawing .
Documentation
1.Daily Approvel of RFI's
Hand over to Billing
2. Prepration of Daily Department
Routin Test Report

As per Client and Contract


Crust Verification requirment Cunduction non
destructive test

ata Send to Managment


proceed for COD