2. Define GMR.
6. What are ABCD parameters? Derive the same for short and medium transmission
lines.
1
EXPT NO: 2 FORMATION OF BUS ADMITTANCE AND IMPEDANCE
MATRICES
1. Define Per unit value.
4. State the advantage of building algorithm over other methods of forming ZbusMatrix
2
EXPERIMENT 3 LOAD FLOW ANALYSIS - I : SOLUTION OF LOAD FLOW
AND RELATED PROBLEMS USING GAUSS-SEIDEL METHOD
1. What is the need for load flow analysis?
2. Write the quantities that are associated with each bus in a system.
6. Give the reason for using iterative methods to solve load flow problems.
3
EXPT NO: 4 LOAD FLOW ANALYSIS-:II SOLUTION OF LOAD FLOW AND
RELATEDPROBLEMS USING NEWTON-RAPHSON AND FAST
DECOUPLEDMETHOD
1. Compare Newton Raphson method with Gauss-Seidal method.
4
EXPT NO: 5 FAULT ANALYSIS
1. What is the need for fault analysis?
5
EXPT NO: 6 TRANSIENT AND SMALL SIGNAL STABILITY ANALYSIS OF
SINGLE-MACHINE INFINITE BUS SYSTEM
9. Write the power angle equation and draw the power angle curve.
6
EXPT NO:7 TRANSIENT STABILITY ANALYSIS OF MULTIMACHINE
POWER SYSTEMS
3. State and explain about equal area criterion for multi-machine system.
7
EXPERIMENT: 9 LOAD-FREQUENCY DYNAMICS OF SINGLE-AREA AND
TWO-AREA POWER SYSTEMS
1. What is the necessity for frequency constancy in a power system?
8
EXPT NO: 10 ECONOMIC DISPATCH IN POWER SYSTEMS
1. What is the purpose of economic dispatch?
9