Name of the Project :- Development of NH-31 to 4 lane configuration from km 551.360 to km 563.260 (Ghoshpukur to Bihar More, Bagdogra) in Darjeeling District,West Bengal under EPC Mode''
(Project length-11.90 km.)
RFI SUMMARY DATE :
Submission Chainage Chainage Proposed Proposed
Sl No. RFI No. Side Description of Work Submitted By Status
Date (Km) (Km) Inspection Inspection
6007 TIPPLGRDJV/NH-31/HW/ 5981 10-Dec-19 LHS HIGHWAY BC Tack Coat MR. SATYAKI SARKAR 11-Dec-19 11:30
6008 TIPPLGRDJV/NH-31/HW/ 5982 10-Dec-19 LHS HIGHWAY BC BC MR. SATYAKI SARKAR 11-Dec-19 12:30
6009 TIPPLGRDJV/NH-31/HW/ 5983 10-Dec-19 LHS HIGHWAY MEDIAN Kerb Laying MR. SATYAKI SARKAR 11-Dec-19 12:30
6010 TIPPLGRDJV/NH-31/HW/ 5984 10-Dec-19 RHS HIGHWAY BUS BYE Laying 1st MR. SATYAKI SARKAR 11-Dec-19 01:30
6011 TIPPLGRDJV/NH-31/HW/ 5985 10-Dec-19 RHS HIGHWAY BUS BYE wmm 1st MR. SATYAKI SARKAR 11-Dec-19 02:30
6012 TIPPLGRDJV/NH-31/STR/ 5986 10-Dec-19 552+480 LHS Reinforcement checking of RE Pannel STRUCTURE RE PANNEL concreting of RE Pannel MR. ARINDAM SINHA 11-Dec-19 12:30
6013 TIPPLGRDJV/NH-31/STR/ 5987 10-Dec-19 552+480 LHS Concreting of RE Pannel STRUCTURE RE PANNEL PCC MR. ARINDAM SINHA 11-Dec-19 01:30
Reinforcement & Shuttering checking
6014 TIPPLGRDJV/NH-31/STR/ 5988 10-Dec-19 553+697 RHS of Abutment Shaft 2nd Lift of A-1 STRUCTURE Minor Bridge Reinf. Of shaft 2nd lift MR. ARINDAM SINHA 11-Dec-19 02:30
(MCW)
Concreting of Abutment -1 Shaft 2nd Concreting of shaft 2nd
6015 TIPPLGRDJV/NH-31/STR/ 5989 10-Dec-19 553+697 RHS STRUCTURE Minor Bridge MR. ARINDAM SINHA 11-Dec-19 02:45
lift of MCW lift.
Concreting of Deck slab with bracket CONCRETING OF DECK
6016 TIPPLGRDJV/NH-31/STR/ 5990 10-Dec-19 554+050 RHS STRUCTURE LVUP MR. ARINDAM SINHA 11-Dec-19 03:00
of LVUP SLAB
Reinforcement and Shuttering RETAINING
6017 TIPPLGRDJV/NH-31/STR/ 5991 10-Dec-19 555+066 555+086 20 RHS STRUCTURE reinf. Of ret. wall 1st lift MR. ARINDAM SINHA 11-Dec-19 03:15
checking of wall 1st lift of ret. Wall WALL
RETAINING concreting of ret. wall 1st
6018 TIPPLGRDJV/NH-31/STR/ 5992 10-Dec-19 555+066 555+086 20 RHS Concreting of raft ret. Wall 1st lift STRUCTURE MR. ARINDAM SINHA 11-Dec-19 04:15
WALL lift
Excavation for foundation A-2 of
6019 TIPPLGRDJV/NH-31/STR/ 5993 10-Dec-19 559+982 LHS STRUCTURE Minor Bridge Excavation MR. ARINDAM SINHA 11-Dec-19 04:20
MNB
Reinforcement and Shuttering
6020 TIPPLGRDJV/NH-31/STR/ 5994 10-Dec-19 560+654 LHS STRUCTURE CULVERT reinf. Of ret. wall 2nd lift MR. ARINDAM SINHA 11-Dec-19 04:15
checking of wall 2nd lift of ret. Wall
concreting of ret. wall 2nd
6021 TIPPLGRDJV/NH-31/STR/ 5995 10-Dec-19 560+654 LHS Concreting of ret. Wall 2nd lift. STRUCTURE CULVERT MR. ARINDAM SINHA 11-Dec-19 04:20