Page 1
Who We Are:
SUPAASI Solar Auto Tracking Systems is a single location, medium
scale, multi product solar powered energy solutions provider company based
at Ghaziabad in national capital region, Delhi. It is professionally managed
company having state of the art manufacturing facilities at Saddiq Nagar,
Major Asharam Tyagi Road, Opp. DPSG, Ghaziabad.
The company has got in principal approval from MNRE (Ministry of New &
Renewable Energy, Government of India, New Delhi) for its capability in start-
up category of solar power rating for decentralized solar PV applications
having validity of its grading till June 29, 2019.
The company is promoted by a young and dynamic first generation
entrepreneur, Mr. Sudhir Parswal with his associates in 2016. Though Mr.
Sudhir Parswal had been into this line of activity for more than 5 years but that
was in the capacity of supplier only but taking inspiration from start-up and
make in India initiative of our Prime Minister Mr. Narendra Modi for
encouragement of alternative source of energy, he chose to start his own
venture for manufacturing of full-fledged solar power plants.
Page 2
MNRE Chanel Partner
Page 3
An ISO 9001:2015 & MSME Reg. Co.
Management of Supaasi Solar Auto Tracking Systems vested in Mr. Sudhir Parswal
and Mr. Vijay Pal Singh.
Page 4
About the Management:
Mr. Sudhir Parswal aged about 52 years, a graduate and belongs to a reputed
business family of Bijnor having interest in agriculture equipment and renewable
energy. After completing his studies about three decades back, he joined family
business then head by his father Late Sh. S. P. Singh, by sharing responsibilities of
their traditional family business of agricultural equipment under the name and style of
M/s Sunjai Farm Traders.
As stated earlier that Mr. Sudhir Parswal belongs to much respected business family
and he could have easily enjoyed hassle free luxurious life but he chose to make his
own mark in the corporate world and to be a self-made man he explored the possibility
of new venture apart from traditional family business. Since the then Bijnor and its
surrounding area was severely affected by frequent long duration power cuts
particularly in summer season, which created demand for an integrated supply and
service provider for uninterrupted power supply solution, Mr. Sudhir Parswal had
foreseen its potential and as a visionary entrepreneur actualized his dream by taking
first step to start a Firm m/s Power Solution supply and service provider outlet at Bijnor
under the same name and style of M/s Sunjai Farm Traders. The response was
overwhelming and in a very short span Mr. Sudhir Parswal established himself in the
line of activity. Under his able guidance and leadership the outlet grew leaps and
bounds and become a synonym for Safety, Trust, Accuracy, Responsiveness and Time
(START).
Page 5
Executive Summary
Page 6
Supaasi Solar recommended Design:-
Page 7
1. Project Site Details:-
Stage 6 Purchasing/PO
Stage 7 Procurement
Procurement of the all components of the tender documents.
Approvals of documents
Approvals of site
Delivery
Page 8
Stage 10 Execution
Before site -
Safety training
On site –
-Site preparation
-Installation of modules
Local staff will be trained after commissioning of the project for effective operation and
maintenance of the installed system, with specific guidance on:
Page 9
Technical Specification & details of Solar Power Plant
Page 10
Note:
The above bill of material & system design is subject to change with any change in
project site, site layout, and soil condition and evacuation scheme. Such changes will
have commercial implications.
Page 11
1. Installation Details:
Page 20
4. Commercials:
1. Provide access to work site for delivery of equipment and materials prior to and
during project implementation.
2. Provide a suitable and secure space for storage of equipment and materials.
3. Facilitate interfacing with the client’s resident engineering staff for consultation
as needed.
Page 21
4. Commercials:
5. Energy Generation:
S.NO. ITEMS
Page 22
8. CO2 Emission Reduction:
In line with our policy of continuous improvement of specifications, we reserve the right
to modify the design and change the specification of any material, if in our opinion such
modification constitutes an improvement or is in accordance with revised standards or
manufacturing methods. Therefore, specifications, illustrations, dimensions and
weights given in our catalogues, drawings or photographs are not binding in detail.
If there are any additions or changes to the scope of work outlined in our proposal and
its annexure, the value of the contract will be enhanced accordingly and payment will
Page 23
be made in accordance with the terms of payment of our offer.
Facilities including water and power required for erection, testing and commissioning
will be provided by you in time free of cost at points to be nominated by us
The entire contract works are due to be completed within mutually agreeable period
from the date of signing of the acceptance of the order, on receipt of down payment
and also receipt of all technical information / data from our / your Architects / your
Consultants, necessary to enable us to proceed with the job and handing over of clear
site to us on approval of drawings. However, the execution of the work, and also the
completion date are subject to delays, if any, on your part in providing us with any.
material and services not included in the contract, or any default by sub-contractors or
reasons beyond the control including strike, lock out, fire, accident at the works site or
during transit of materials to site, war and war-like operations, hostilities, civil
commotion, capture, seizure, detention, blockade, labor disturbances, go-slow tactics,
work to rule, lay-off or closure of factory or portion thereof on account of political, labor
or other disturbances or otherwise and the consequences thereof and also any reason
amounting to Force Majeure. In no event, we shall be liable to consequential loss or
damage arising out of our connected with this contract in any way whatsoever.
Page 24
VII. MATERIAL AND WORKMANSHIP WARRANTY:
Subject to the terms of payment being punctually complied with the equipment being
This WARRANTY –
VIII. ARBITRATION:
Any dispute or difference whatsoever arising between the parties out of or relating to
the construction, meaning or operation or effect of this agreement shall, unless
resolved amicably, be settled by Arbitration of three Arbitrators one to be appointed by
each party and the third Arbitrator (who shall act as the presiding
Arbitrator) to be appointed by the two Arbitrators. All proceedings under such
Arbitration shall be held in Ghaziabad and would be in accordance with the provisions
of the Arbitration and Conciliation Act, 1996 and any statutory modifications or re-
enactment thereof.
It is agreed and understood that the Court having jurisdiction over Ghaziabad alone
shall be competent to entertain any Application or Petition pertaining to the Arbitration
Agreement and/or arbitral proceedings pursuant to this Clause.
Account details :-
Page 25
Annexure-A
Page 27
5. DCDB With Surge A/R EA CITEL/ Phoenix if
Protection Device with required
disconnect switch
Page 28
THANK YOU FOR