KEY PLAN
A B C
1 2 TS32NB2.6
2200 2300 2300 2200
+7256 ISA65X65X6
HOT WATER
A TANK HOT WATER TS20NB2.6 A
447 TANK TS20NB2.6
+6050
747 747 +5950
2XISMC100 2XISMC100
+5.95M
387
387
1900
300TYP
500
2XISMC100 ISA65X65X6
HOT WATER TANK
2 1
460
B 1 2XISMC100 2XISMC100 2XISMC100 ROD20 B
4500 4500 2XISMC100
2XISMC100
B
DETAIL - GRID@ A-A
1:65
A 4500
B 4500
C
C C 2200 2300 2300 2200 C
DETAIL - ISOMETRIC VIEW
1:65
TS32NB2.6 ISMC100
1200TYP 93.5
TS20NB2.6 93.5
A B C +7256 584 668.5 668.5 ISMC100
ISA65X65X6 TS20NB2.6
ISMC100 93.5 584 ISMC100
HOT WATER
TANK
+6050
2 HOT WATER
ISA65X65X6 TANK
1315
+5950 ISMC100
50.5
1900
+5.95M ISMC100 454
50.5
ISMC100 ISMC100
585
ISMC100 ISMC100 ISMC100
DET- C ISMC100
ISA65X65X6 1 ISMC100 ISMC100 ISMC100
625
625
DET- B
3831.5 668.5 668.5 3831.5
4500 4500
D D
4621.5
4607
4607
A A
+700 2XISMC75
200
M16-4NOS
+0.7M 18 DIA HOLES 25 150 25
0 PLT12*200
25
500
500
DET- A
+0 R0 16.11.2019 SUBMITTED FOR APPROVAL R.GOBINAATH S.ARAVINDAN S.KAMALAKANNAN
4500 4500
150
200
25 150 25 PLT12*200 REV NO DATE DESCRIPTION DRWN CHKD APPD
200
DETAIL - GRID@ 1-1 B B
CLIENT : CONSULTANT :
1:65 2XISMC75
25
RCC
E E
2XISMC100 M16-4NOS
2XISC100
6
18 DIA HOLES L&T Technology Services
TYP 6 TYP B-B
1:10
DETAIL - A
50
1:10
ATL AP GREEN FIELD PROJECT VENDOR :
50 ISMC100 METEC DESIGN AND CONSTRUCTION ENGINEERS
ISMC100 INDIA PRIVATE LIMITED
ANDHRA PRADESH INDIA
25
CIN : U74999TN2012PTC084896
M16-2NOS
50
1:10 PLT10*75 LAYOUT OF PLATFORM & LADDER FOR HOT WATER TANKS
37.5
12.5
F F
11.5 ISMC100 M16-2NOS
ISMC100
18 DIA HOLES MDCEIPL/1698/15A
DETAIL - B C-C SHEET SIZE:
1:10 A2 SCALE N.T.S REV: R1 SHEET: 1 OF 1
1:10
1 2 3 4 5 6 7 8