FOUND NO LEAKS
WATER FILL TEST HAS BEEN CARRIED OUT AT 1 HOUR AND FOUND NO LEAKS ON
SURFACE CLEANING HAS BEEN CARRIED OUT AS PER IS 4682 PART-1 AND FOUND
SATISFACTORY
FOR ENTIER INNER TANK TO SPECIFIED THICKNESS OF 5mm THK PER DOUBLED
WITH TWO LAYERS EACH 2.5mm THK IS CHECKED WITH COATMETER AND FOUND
SATISFACTORY
SPARK TEST HAS BEEN CARRIED OUT WITH 25KVA ELECTRIC POWER AS PER IS
SATISFACTORY
SATISFACTORY
SPARK TEST HAS BEEN CARRIED OUT AFTER VULCANISATION WITH 25KVA
SATISFACTORY
VISUAL INSPECTION HAS BEEN CARRIED OUT ON INNER OF THE TANK AFTER
SANDRING AND HOLES DRILLING FOR ALL FLANGES ARE CARRIED OUT AS PER IS