You are on page 1of 7

ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

BRIDGE SITE CONDITION


DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
ITEM TYPE OF BRIDGE STRUCTURE
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
NCR CAR REGION I
I. NEW CONSTRUCTION
A. CONCRETE BRIDGE STRUCTURE

1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION 554,016.63 993,087.81 588,137.30 1,008,364.61 549,350.94 969,822.83

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION 479,305.61 944,892.75 489,971.96 934,051.21 557,312.87 1,001,600.14

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION 349,931.54 871,021.32 363,508.18 860,076.30 429,301.67 923,366.02

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION 291,088.69 706,913.20 298,569.56 709,221.29 354,017.88 761,263.99
with structural with structural with structural
without craneway without craneway without craneway
craneway craneway craneway
B. STEEL BRIDGE STRUCTURE

1.) STEEL TRUSS WITH BORED PILE FOUNDATION 795,886.75 1,172,397.72 841,011.04 1,167,904.78 852,924.70 1,195,589.90

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION 670,424.97 1,059,912.90 682,349.33 1,131,185.07 745,078.37 1,117,820.06

3.) STEEL GIRDER WITH BORED PILE FOUNDATION 684,821.01 1,130,071.39 740,517.53 1,166,088.31 749,449.43 1,176,818.32

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION 610,735.30 1,081,756.03 642,359.24 1,091,696.47 711,689.42 1,162,827.89

C. CONCRETE FLYOVER

1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 479,915.11 494,164.28 502,710.27

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR
1.) BRIDGE RETROFITTING

a. Retrofitting of Superstucture 422,542.55 410,686.88 416,233.98

b. Retrofitting of Substructure and Superstucture 582,661.12 567,169.73 573,336.10

2.) REPLACEMENT OF SUPERSTRUCTURE 406,275.72 413,131.55 420,583.21

3.) REDECKING 217,627.67 224,811.40 233,928.26


ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

BRIDGE SITE CONDITION


DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
ITEM TYPE OF BRIDGE STRUCTURE
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION II REGION III REGION IV-A
I. NEW CONSTRUCTION
A. CONCRETE BRIDGE STRUCTURE

1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION 611,287.89 1,031,523.94 507,101.79 944,441.32 552,180.76 972,836.93

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION 573,208.32 1,017,244.35 447,200.64 908,594.46 522,102.82 966,669.52

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION 413,334.33 910,081.28 316,507.47 830,421.81 410,093.46 908,305.09

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION 339,444.14 747,075.58 266,669.84 658,553.45 330,909.33 746,820.59

with structural with structural with structural


without craneway without craneway without craneway
craneway craneway craneway
B. STEEL BRIDGE STRUCTURE

1.) STEEL TRUSS WITH BORED PILE FOUNDATION 846,638.48 1,170,645.83 784,885.95 1,126,450.33 833,933.61 1,165,536.12

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION 710,655.46 1,108,191.41 659,500.50 1,083,419.10 741,907.25 1,128,308.90

3.) STEEL GIRDER WITH BORED PILE FOUNDATION 735,554.11 1,161,119.45 661,855.01 1,104,596.40 723,951.65 1,149,976.03

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION 697,481.59 1,146,761.41 601,960.91 1,068,671.10 693,880.76 1,143,730.18
C. CONCRETE FLYOVER

1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 534,090.32 456,941.18 485,702.38

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR
1.) BRIDGE RETROFITTING

a. Retrofitting of Superstucture 409,213.08 403,254.26 413,305.29

b. Retrofitting of Substructure and Superstucture 576,554.30 551,910.55 580,026.03

2.) REPLACEMENT OF SUPERSTRUCTURE 444,671.42 393,884.47 385,806.75

3.) REDECKING 225,800.62 207,305.91 220,250.70


ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

BRIDGE SITE CONDITION


DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
ITEM TYPE OF BRIDGE STRUCTURE
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION IV-B REGION V REGION VI
I. NEW CONSTRUCTION
A. CONCRETE BRIDGE STRUCTURE

1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION 588,539.60 1,004,408.28 569,354.48 990,611.04 598,485.86 1,019,373.07

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION 556,053.56 995,720.21 563,255.10 1,008,436.38 572,453.42 1,017,139.84

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION 412,410.34 904,957.18 417,174.14 915,161.17 428,258.69 926,248.64

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION 330,728.31 747,062.35 336,614.55 747,039.81 350,014.75 761,990.79

with structural with structural with structural


without craneway without craneway without craneway
craneway craneway craneway

B. STEEL BRIDGE STRUCTURE

1.) STEEL TRUSS WITH BORED PILE FOUNDATION 841,314.75 1,163,934.46 821,827.08 1,155,604.16 854,750.78 1,179,682.21

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION 709,347.79 1,110,476.61 707,216.48 1,102,367.42 723,630.83 1,124,510.01

3.) STEEL GIRDER WITH BORED PILE FOUNDATION 728,577.14 1,149,777.00 709,719.97 1,136,306.07 738,828.94 1,165,070.47

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION 696,098.16 1,141,010.49 732,134.44 1,154,052.96 712,803.56 1,162,758.80
C. CONCRETE FLYOVER

1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 513,003.65 508,668.32 528,496.70

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR
1.) BRIDGE RETROFITTING

a. Retrofitting of Superstucture 408,476.29 408,137.24 412,826.69

b. Retrofitting of Substructure and Superstucture 570,518.28 583,906.00 596,930.82

2.) REPLACEMENT OF SUPERSTRUCTURE 428,498.56 426,613.67 433,982.97

3.) REDECKING 223,412.14 221,698.75 229,023.80


ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

BRIDGE SITE CONDITION


DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
ITEM TYPE OF BRIDGE STRUCTURE
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION VII REGION VIII REGION IX
I. NEW CONSTRUCTION
A. CONCRETE BRIDGE STRUCTURE

1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION 604,487.51 1,013,672.15 599,062.17 1,013,574.81 601,514.30 1,010,970.21

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION 552,394.19 985,457.41 532,841.99 972,191.52 550,648.66 983,929.10

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION 421,620.35 907,637.97 401,541.51 894,355.70 418,063.30 904,342.57

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION 330,582.77 765,533.44 326,248.07 742,232.90 328,256.99 759,180.10

with structural with structural with structural


without craneway without craneway without craneway
craneway craneway craneway
B. STEEL BRIDGE STRUCTURE

1.) STEEL TRUSS WITH BORED PILE FOUNDATION 861,650.19 1,179,407.11 881,209.02 1,201,514.00 859,785.30 1,177,722.61

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION 707,116.90 1,119,046.08 729,809.41 1,120,983.01 710,827.25 1,107,072.78

3.) STEEL GIRDER WITH BORED PILE FOUNDATION 754,060.53 1,168,604.13 763,390.17 1,183,233.23 750,268.35 1,165,068.28

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION 730,489.52 1,140,310.94 725,643.21 1,141,771.50 727,899.04 1,137,948.73
C. CONCRETE FLYOVER

1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 511,396.53 520,199.71 546,422.21

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR
1.) BRIDGE RETROFITTING

a. Retrofitting of Superstucture 412,697.21 413,337.46 410,388.43

b. Retrofitting of Substructure and Superstucture 578,682.30 585,902.32 596,713.58

2.) REPLACEMENT OF SUPERSTRUCTURE 418,836.91 422,929.31 419,611.98

3.) REDECKING 224,827.95 230,185.33 224,899.40


ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

BRIDGE SITE CONDITION


DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
ITEM TYPE OF BRIDGE STRUCTURE
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION X REGION XI REGION XII
I. NEW CONSTRUCTION
A. CONCRETE BRIDGE STRUCTURE

1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION 627,824.05 1,037,132.57 589,006.00 1,013,706.38 605,064.99 1,023,263.42

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION 553,750.40 986,897.89 538,638.93 987,193.44 573,652.36 1,015,657.54

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION 425,208.38 910,720.08 369,654.83 870,617.23 427,262.68 921,804.83

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION 339,352.97 770,106.56 302,260.31 716,392.83 346,901.90 763,925.98

with structural with structural with structural


without craneway without craneway without craneway
craneway craneway craneway
B. STEEL BRIDGE STRUCTURE

1.) STEEL TRUSS WITH BORED PILE FOUNDATION 869,599.19 1,191,799.90 827,599.21 1,154,552.68 862,425.76 1,182,528.08

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION 712,890.80 1,119,338.17 692,050.46 1,090,810.60 721,858.92 1,124,329.84

3.) STEEL GIRDER WITH BORED PILE FOUNDATION 776,802.80 1,191,450.91 704,668.84 1,134,737.12 741,977.88 1,160,177.13

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION 731,221.15 1,141,137.79 682,824.97 1,108,145.74 739,067.82 1,152,575.75
C. CONCRETE FLYOVER

1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 538,960.82 527,909.22 525,738.46

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR
1.) BRIDGE RETROFITTING

a. Retrofitting of Superstucture 416,122.23 404,312.70 411,320.31

b. Retrofitting of Substructure and Superstucture 596,520.45 565,782.31 578,529.82

2.) REPLACEMENT OF SUPERSTRUCTURE 427,196.17 454,908.58 435,190.00

3.) REDECKING 232,814.41 211,645.97 226,221.30


ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

BRIDGE SITE CONDITION


DRY OR LOW HIGH OR DEEP
ITEM TYPE OF BRIDGE STRUCTURE
WATER LEVEL WATER LEVEL
REGION XIII
I. NEW CONSTRUCTION
A. CONCRETE BRIDGE STRUCTURE

1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION 673,322.46 1,087,164.73

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION 616,445.87 1,054,104.65

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION 452,087.28 942,336.97

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION 368,252.85 790,113.70

with structural
without craneway
craneway
B. STEEL BRIDGE STRUCTURE

1.) STEEL TRUSS WITH BORED PILE FOUNDATION 889,654.22 1,209,306.77

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION 765,326.95 1,172,024.41

3.) STEEL GIRDER WITH BORED PILE FOUNDATION 788,682.50 1,202,525.60

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION 760,287.59 1,169,470.02


C. CONCRETE FLYOVER

1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 596,824.39
II. REPLACEMENT/RECONSTRUCTION
add 15% to the New Construction of
1.) RCD GIRDER BRIDGE Bridge
add 15% to the New Construction of
2.) STEEL BRIDGE Bridge
III. BRIDGE REPAIR
1.) BRIDGE RETROFITTING

a. Retrofitting of Superstucture 418,907.80

b. Retrofitting of Substructure and Superstucture 603,530.66

2.) REPLACEMENT OF SUPERSTRUCTURE 477,654.05

3.) REDECKING 243,008.70


Note:
1.) The cost estimate high/deep water level condition includes Structural Steel Craneway, Structural Steel T-Platform and Cofferdamming of the footing
foundation.

2.) Cost of Replacement/Reconstruction work may be increased by 15% of the new construction cost due to removal of existing bridge structure and
provision of detour and traffic management.

3.) The price of construction materials are based on the regional average prices plus 15% mark-up for the hauling cost (3rd Quarter of CY-2012),
equipment rates are based from the latest ACEL Rates (24th Edition) and labor rates are based on the approved labor rates (July 2012).

4.) The estimated unit cost was derived from the assumed typical design of Bridge Structure and may be vary depending on the actual design.

5.) The retrofitting works is assumed to be designed using glass fiber reinforcement on girders.

You might also like