You are on page 1of 1

Project Name: CCS INTERNATIONAL AIRPORT, LUCKNOW

Material submittal request for Draw out connection, Air


Document Title:
release valve & Test & Drain assembly, Make: ADVANCE STATUS Date: 17th Dec 2019

Document Ref. No.: NCCL/AAI-LKO/754/2019-20 EGIS Observation: Recommendation for Approval


with comments.
Reference Document No. / Item / Material Complied / Not
S. No. Clause No. Type Complied EGIS Comments Date: 16th Dec 2019 NCCL/Contractor Replies Remarks

1 TDS-P-1 to 3 2 Way Fire Brigade Inlet Not complied Not required at project.

Extra Item no: 1 as per AAI Star Mark approval to be taken from AAI as per format
2 Draw out connection Not complied shared with M/s NCCL.
letter No: AAI/LKO/Engg.
Project/T-3/2019-20/1266-
1268, Dated: 13.12.19
3 Draw out connection Not complied Type test and Routine test report to be submitted as per
category mentioned in Loam.

Working pressure of Air release valve shall be 1.6 Mpa as


4 Air release valve Not complied
per data sheet page no. 7.
Extra Item no: 2 as per AAI
letter No: AAI/LKO/Engg.
Project/T-3/2019-20/1266-
1268, Dated: 13.12.19, As per page no 6- Body is of Gun metal & as per page no. 7
5 TDS-06, TS(E )-530-7.4 Air release valve Not complied Body is of Brass. There is conflict between deta provided. So
rate analysis to be provided for the item offered for project.

Routine test report to be submitted as per category


6 Air release valve Not complied
mentioned in Loam.

7 Inspection & Test assembly Forged brass is better than Gunmetal, so it can be accepted.
BOQ-1095, TDS-08 & 9, TS (E )
536-16.4 Routine test report to be submitted as per category
Inspection & Test assembly Not complied mentioned in Loam.