You are on page 1of 1

CITYTECH STEEL FABRICATION INC.

QUOTATION
Roll Up Doors ● Steel Doors ● Louvers
No. 32 Sanciangco St., Brgy. Tonsuya, Malabon City
Tel: (02) 921-0410 / 781-5774 / 352-8026 | Fax: (02) 922-6703 Date: 1/22/2020
Mobile: 0932-8788740 / 0917-8158414 / 0933-8636143 Valid Until: 2/21/2020
Email: citytech.ph@gmail.com
Website: www.citytech.com,ph
Ref. No. 2020-8433

Customer Name: Project Title:

STI COLLEGE *Project Name: REPAIR OF ROLL UP DOOR


BRGY PANAPAAN BACOOR CAVITE *Project Location: BACOOR CAVITE
KRISTINE CASSANDRA OGALESCO
526-7530
k.ogalesco@solidmanila.com.ph

CITYTECH STEEL FABRICATION INC. hereby proposes and offer to furnish the articles described and specified below:
Qty Panel Height Width Code Description Unit Cost Amount
ROLL UP DOOR MANUAL OPERATED (Citytech Standard)
Gauge #24 - Galvanize Aluminum Slats (Galvalume Slats)
-Spring Assembly -Guiderails -Lockset
-Sideplate -Bottom Bar -Padlock Holder
-Box Cover

-
2 sets 1 pnl 3.00m 3.50m ROLL UP DOOR MANUAL 30,000.00 60,000.00
-
60,000.00
Less 5% 3,000.00
Sub Total: 57,000.00

Note:
* Supply and Installation included
*One (1) Year Warranty
* Terms of Payment: 50% down payment; 50% full payment before installation
* Fabrication lead time: 2 weeks to 4 weeks upon PO, DP, and approved drawing

GRAND TOTAL: PHP 57,000.00

Noted by: Approved by: Prepared by:


Liezl Tan Ann Chua Francis C. Pullon
Admin Head General Manager Account Executive

Please indicate your acceptance by signing this proposal which will serve as our contract subject to all terms and conditions.
TERMS & CONDITIONS: CONFORME:
* All check payments should be made payable to "CITYTECH STEEL FABRICATION INC."
* Cancellation of ordered item for any reason shall mean forfeiture of down payment.
* Any change in dimension of materials upon actual verification shall be subject to a corresponding price adjustment.
* Power supply, electrical, civil, carpentry works for installation shall be provided by the client/owner. Signature
* Unloading of items shall be ground level only. Vertical hauling shall be for the account of the client.
* Other requirements by the client not specifically mentioned herein shall be billed separately. Name:
* All excess and unused materials after installation shall remain the property of CITYTECH STEEL FABRICATION INC. Date:
* Price subject to change without prior notice.

You might also like