February 8, 2023

To: Mr. Danny Mijares


Owner
Urbandeca Homes Marilao

Subject: VARIATION ORDER NO. 3

SCOPE OF WORK (Please see attached itemized scope of works on separate sheet):

COST SUMMARY:
A. GENERAL FIT-OUT WORKS
Item
DESCRIPTION TOTAL ITEM COST
No.

EXTERIOR WALL (WOOD PLANK TILES) 34,375.00


LIVING AREA (PVC PANELS (WOOD FINISH) 31,687.50

GRAND TOTAL (TAX EX) 66,062.50


DISCOUNTED COST 66,000.00

SCOPE OF WORKS:
General site works
Earthworks and Structural Works
Architectural works
painted
tiled
doors and windows
Electrical works
Plumbing works
Waterproofing works
PROJECT DURATION :
90 - 120 days (may vary dependent on the weather)

TERMS and CONDITIONS:

Stoppage and/or delay of work will happen under the following circumstances:
Government mandated work stoppage.
Client is unable to release payment for progress billing after acceptance within 7 days from date of billing.
Heavy Rain or Severe Weather

Page 1 of
Any changes of work from approved construction drawings will be charged accordingly.

All change orders will be billed before said work order is accepted.
For any change order, a quotation will be forwarded to the client for approval.
Same terms of payment: lump sum & progress billing

EXCLUSIONS
Construction Bonds Permitting
Rangehood Millworks / Kitchen Cabinets
Gas range Bonds and other Admin/HOA related payments
Lighting Fixtures
Plumbing Fixtures
Fire Extinguishers
Microwave ovens
Water and Electricity (Construction works)

PRICING : NON-VAT W/ RECEIPT


PAYMENT : Thirty Percent (30%) Downpayment
Sixty Percent (60%) in Progress Billings
Ten Percent (10%) Retention payable within fifteen (15) days from completion

Again, we would like to reiterate that this is ENTIRELY BUDGETARY and when we get into the finer details of the project,
we could expound on our proposal and provide you with a more realistic and accurate project proposal

If there are any questions, please feel free to be in touch with us and we will address these as soon as possible.

Thank you and we wish you all the best.

Very truly yours, Received by:

Client
John Calma
BBCS - Managing Director

Page 2 of
Subject: DETAILED ESTIMATE
Project: VARIATION ORDER NO. 3

Location: Urbandeca Homes Marilao


Owner: Mr. Danny Mijares
Date: February 8, 2023

MATERIAL LABOR
Item No. DESCRIPTION Quantity Unit
Unit Cost Total Cost Unit Cost Total Cost TOTAL ITEM COST

I ARCHITECTURAL WORKS
EXTERIOR WALL
WALL FINISHES includes consumable materials, trim and edgings
200mm x 1200mmwall tiles (wood finish) 55.00 pcs 400.00 22,000.00 225.00 12,375.00 34,375.00
LIVING AREA
CEILING FINISHES includes consumable materials, trim and edgings
PVC PANEL 7" x 2.9m double ply (includes end corners and mouldings) 50.00 pcs 487.50 24,375.00 146.25 7,312.50 31,687.50

Total Amount NON-VAT 66,062.50


Note:
*Any deviation from the issued plan and the scope will
have a separate cost and not considered included in this
proposal. The proposal is only considered as lump sum by
the items herein the proposal. Any items that is not included
shall not be considered included unless specified or defined in the items.

__________________________________
BUILD-IT BROS. CONSTRUCTION SERVICES Authorized Signature over Printed Name
CONTRACTOR