PROJECT KITCHEN RE-TILES CRTL NO.

LOCATION ASPIRE TOWER NUVO, EASTWOOD OWNER: MRS. LADY MAKALINTAL

AREA (sqm) 1 LOT TURNOVER DATE:

B. ARCHITECTURAL WORKS QTY UNIT UNIT COST TOTAL AMOUNT


KITCHEN

1.0 MOBILIZATION/DEMOBILIZATION 1.00 lot


2.0 Dismantleof existing laminate @ counter top 1.00 lot
3.0 installation of hardi-board & chicken wires 1.00 lot 18,300.00 18,300.00

4.0 installation of 60x60 tiles @ counter top and splash board 1.00 lot

4.0 installation of Bottom cabinet doors 3.00 unit


TOTAL B1 ₱ 18,300.00

TOTAL CONSTRUCTION COST 18,300.00

Terms & Conditions

60% down payment of the total contract must be paid upon signing of the contract.
All Check payments must be made payable to BDO Savings Account Name: Ralph Jay M. Hular with Account Number: 6390367685
Installation of any accessories/fixtures shall have charges if not included in the contract.
Our team shall not be liable in any damage due to the negligence and natural calamity to any item after the warranty

THANK YOU FOR THE OPPORTUNITY TO WORK WITH YOU.

_________________________________________________ ______ Ralph Hular_______


CONTRACTOR
OWNER / SIGNATURE OVER PRINTED NAME