You are on page 1of 77

Project :Balai Seni Visual Negara,

Kuala Lumpur

1.Print and photostate the document for


binding
Project :Balai Seni Visual Negara,
Kuala Lumpur
1. Checking the drawing No with the
Actual Drawing to make sure theres
no error when binding the contract
document.
2.checking all the document to make
sure all the document is include in the
contract document
3.there a slight error in the drawing no
and have to make changes

Project:SMK Balingian,Sarawak

1.Doing Arimethical error to cross check


the price between QS Consultant and
Contractor.

2.For all element such as internal floor,


internal Floor finishes,Sanitary,Rumah
Sampah ,and others Building
APPENDIX
BALAI SENI
Appendix 2 - Bill No.2 - Zone 2 ( Main Lobby)
Detail Rate Comparison

RATE

ITEM DESCRIPTIONS UNIT Zuwa Design Percentage


Consultant & Construction

(3/12)

DEMOLITION WORKS

Notes:

Contractor is to note that the approximate


quantities stated in the Bills Description is
purely indicative. Contractor shall ascertain
himself the exact quantity and extent of works
by mean of site inspection and observation.
No claims whatsover shall be entertained due
to failure of the contractor to exactly identify
the extent of area/quantity to be actually
involved.
It is the Contractor's responsibility to satisfy
himself of the exact extent of the works and
shall be deemed to have satisfied himself by
examining the site inclusive of conducting
necessary survey and inspection.

Demolition works shall be carried out in such


a manner so as to minimise or avoid
inconvenience to the existing operation,
tenants , patron and the public. The safety of
the work, people and existing structure in the
proximity of the site shall be of paramount
importance during the execution of the
demolition works.
No consideration shall be given for any claim
for works which are either indispensably
necessary to be carried out to bring the works
to completion or which may contingently
become necessary to overcome difficulties
before completion.
All debris arising from demolition works
shall be removed from Site to contractor's
own dumping place.

App.2/B2/1
Appendix 2 - Bill No.2 - Zone 2 ( Main Lobby)
Detail Rate Comparison

RATE

ITEM DESCRIPTIONS UNIT Zuwa Design Percentage


Consultant & Construction

(3/12)

DEMOLITION WORKS

A Carefully demolish the existing black painted


wall panel approximately 12000mm wide x
6000mm high, make good all disturbed
works to receive new works, clear away all Item 3,600.00 1600.00 -125%
debris rom Site - Left on Plan
B Carefully demolish the existing decorative
panel approximately 5000mm wide x
5000mm high, make good all disturbed
works to receive new works, clear away all
debris from Site - behind existing LED Item 1,250.00 1500.00 17%
partition
C Carefully demolish the existing decorative
panel approximately 5400mm wide x
3000mm high, make good all disturbed
works to receive new works, clear away all Item 810.00 1400.00 42%
debris from Site - Right on Plan
D Carefully demolish the existing decorative
panel at Main Entrance Door, approximately
5000mm wide x 3000mm high, make good
all disturbed works to receive new works, Item 750.00 500.00 -50%
clear away all debris from Site.
E Carefully demolish the existing boxed up
column and wall located at both sides of
Main Entrance Door, remove all debris from
Site and prepare the area to receive new Item 500.00 1000.00 50%
works.

App.2/B2/2
Appendix 2 - Bill No.2 - Zone 2 ( Main Lobby)
Detail Rate Comparison

RATE

ITEM DESCRIPTIONS UNIT Zuwa Design Percentage


Consultant & Construction

(3/12)

WALL FINISHES

Decorative MDF Panel


Supply and fix FORMICA or other approved
equivalent timber laminated decorative sheet
fix to MDF wall panelling complete with all
the necessary framing and other related fixing
accessories

A Fix to wall - Main Entrance Door m2 185.00 75.00 -147%

B Fix to wall maximum height approximately


5000mm high from ground floor complete
with all the necesssary preparatory works on
the existing surface to receive new works. m2 185.00 75.00 -147%

CEILING FINISHES

Note : Tenderer is to note that rates for


ceiling work shall inclusive of forming light
through, light cove, L box, drop panel,
pelmet, cornices, aceess panel, openings to
receive Light Fittings and other M & E
appliances.

9.5mm Thick Boral or other approved


equivalent gypsum board moisture resistant
ceiling board; including all the necessary steel
suspension system supported with wire
hanger or rod fastened to angle brackets and
hood screw, levelling and setting out
including trimming and cutting at all edges,
all joints to be properly taped and plastered
finish with Boral plasterboard jointing system
all in accordance to manufacturer's instruction
C Finish with FORMICA or other approved
equivalent timber finish sheet m2 120.00 75.00 -60%

App.2/B2/3
Appendix 2 - Bill No.2 - Zone 2 ( Main Lobby)
Detail Rate Comparison

RATE

ITEM DESCRIPTIONS UNIT Zuwa Design Percentage


Consultant & Construction

(3/12)

PAINTING AND DECORATIONS

Painting works
Prepare and apply 'NIPPON' or other
approved equivalent paint consist of one coat
undercoat and two washable finishing coats
internally :-

A To existing painted wall including all the


necessary preparatory works to receive new m2 10.00 15.00 33%

B To existing painted beams including all the


necessary preparatory works to receive new m2 10.00 15.00 33%

BUILT IN & LOOSE FURNITURE

Lockers

C Construct Lockers overall size 2000mm high


x 1350mm wide x 500mm deep for 12 nos
compartment complete with all the necessary
timber framing, mdf board , laminated
finishes, ironmongeries and fittings all in no 4,593.40 2,300.00 -100%
accordance to Architect's drawings - Code
D Boral or other approved equivalent
plasterboard ceiling complete with all the
necessary light fittings and related works,
ceiling framing works and suspension system,
finished with timber finish Formica laminated m2 85.00 65.00 -31%
sheet.
E Approved drywall box up above lockers
approximately 2300mm wide x 1000mm high
complete with all the necessary framingworks no 345.00 600.00 43%
and painting.
Column mounted book shelves

F Construct column mounted book shelves


overall size 1800mm high x 1350mm wide x
300mm deep complete with all the necessary
timber framing, mdf board , laminated
finishes, ironmongeries and fittings all in no 3,100.55 2,800.00 -11%
accordance to Architect's drawings - Code

App.2/B2/4
Appendix 2 - Bill No.2 - Zone 2 ( Main Lobby)
Detail Rate Comparison

RATE

ITEM DESCRIPTIONS UNIT Zuwa Design Percentage


Consultant & Construction

(3/12)

BUILT IN & LOOSE FURNITURE

Reception Counter Desk

A Construct reception counter consist of one (1)


number reception desk , drywall works to box
up wall and ceiling complete with painting,
light fittings etc all in accordance to
Architect's drawings ( Chairs not included ) - Item 2,000.00 4,500.00 56%
Code Ref. FF16
Information Display

B Construct one (1) number stand alone


information display overall size
approximately 6200mm long x 2500mm high
complete with all the necessary fittings and
advertisement medium all as shown on Item 14,239.54 6,600.00 -116%
Architect's drawings - Code Ref. FF19
Security Counter Desk

C Construct one (1) number Security Counter


Desk overall size approximately 2600mm
long x 750mm high x 800mm wide all as
shown on Architect's drawings ( Chairs as Item 2,500.00 2,600.00 4%
shown not included ) - Code Ref. FF17
Sofa

D Supply, deliver and place into position, 4 nos.


in 1 set, modular sofa all in accordance to
Architect's specification - Code Ref. LF01 Set 11,362.00 2,800.00 -306%

MISCELLANEOUS

E Allow all the necessary signages, letterings,


logos fix to wall all as shown on Architect's Item 1,500.00 1,000.00 -50%

App.2/B2/5
LADANG MOCCIS
Appendix IV - List Of Drawings
Ladang Moccis Sdn. Bhd.

LIST OF DRAWINGS ISSUED TO THE TENDERER

The following Drawings will form part of the Contract and are to be read in conjunction with the Specifications and other Section of the Contract
Document:-

NO DRAWING TITLE DRAWING NO. REV

ARCHITECTURE DRAWING

GENERAL DRAWINGS
1 PELAN KUNCI, PELAN LOKASI & PELAN TAPAK LMSB/AJSR/1304/2020/WD/01 00
2 PELAN LANTAI TINGKAT BAWAH (DEWAN) LMSB/AJSR/1304/2020/WD/02 00
3 PELAN LANTAI ARAS SATU & PELAN BUMBUNG (DEWAN) LMSB/AJSR/1304/2020/WD/03 00
4 KERATAN A-A & KERATAN B-B (DEWAN) LMSB/AJSR/1304/2020/WD/04 00
5 PANDANGAN (DEWAN) LMSB/AJSR/1304/2020/WD/05 00
6 PELAN LANTAI TINGKAT BAWAH (ASRAMA) LMSB/AJSR/1304/2020/WD/06 00
7 PELAN BUMBUNG 1 (ASRAMA) LMSB/AJSR/1304/2020/WD/07 00
8 PELAN BUMBUNG 2 (ASRAMA) LMSB/AJSR/1304/2020/WD/08 00
9 KERATAN A-A, KERATAN B-B & PANDANGAN A (ASRAMA) LMSB/AJSR/1304/2020/WD/09 00
10 PANDANGAN B, C & D (ASRAMA) LMSB/AJSR/1304/2020/WD/10 00

DETAIL DRAWINGS
11 FLOOR FINISH LAYOUT (DEWAN) LMSB/AJSR/1304/2020/DD/01 00
12 FLOOR FINISH LAYOUT (DEWAN) LMSB/AJSR/1304/2020/DD/02 00
13 FLOOR FINISH LAYOUT (ASRAMA) LMSB/AJSR/1304/2020/DD/03 00
14 CEILING LAYOUT (DEWAN) LMSB/AJSR/1304/2020/DD/04 00
15 CEILING LAYOUT (DEWAN) LMSB/AJSR/1304/2020/DD/05 00
16 CEILING LAYOUT (ASRAMA) LMSB/AJSR/1304/2020/DD/06 00
17 RWDP LAYOUT (DEWAN) LMSB/AJSR/1304/2020/DD/07 00
18 RWDP LAYOUT (DEWAN) LMSB/AJSR/1304/2020/DD/08 00
19 RWDP LAYOUT (DEWAN) LMSB/AJSR/1304/2020/DD/09 00
20 RWDP LAYOUT (ASRAMA) LMSB/AJSR/1304/2020/DD/10 00
21 RWDP LAYOUT (ASRAMA) LMSB/AJSR/1304/2020/DD/11 00
22 RWDP LAYOUT (ASRAMA) LMSB/AJSR/1304/2020/DD/12 00
23 DOOR SCHEDULE LMSB/AJSR/1304/2020/DD/13 00
24 DOOR SCHEDULE LMSB/AJSR/1304/2020/DD/14 00
25 DOOR SCHEDULE LMSB/AJSR/1304/2020/DD/15 00
26 DOOR SCHEDULE LMSB/AJSR/1304/2020/DD/16 00
27 WINDOW SCHEDULE LMSB/AJSR/1304/2020/DD/17 00
28 WINDOW SCHEDULE LMSB/AJSR/1304/2020/DD/18 00
29 WINDOW SCHEDULE LMSB/AJSR/1304/2020/DD/19 00
30 WINDOW SCHEDULE LMSB/AJSR/1304/2020/DD/20 00
31 WINDOW SCHEDULE LMSB/AJSR/1304/2020/DD/21 00
32 TOILET DETAIL (M) - DEWAN LMSB/AJSR/1304/2020/DD/22 00
33 TOILET DETAIL (M) - DEWAN LMSB/AJSR/1304/2020/DD/23 00
34 TOILET DETAIL (M) - DEWAN LMSB/AJSR/1304/2020/DD/24 00
35 TOILET DETAIL (OKU) - DEWAN LMSB/AJSR/1304/2020/DD/25 00
36 TOILET DETAIL (OKU) - DEWAN LMSB/AJSR/1304/2020/DD/26 00
37 TOILET DETAIL (OKU) - DEWAN LMSB/AJSR/1304/2020/DD/27 00
38 TOILET DETAIL - ASRAMA LMSB/AJSR/1304/2020/DD/28 00
39 TOILET DETAIL - ASRAMA LMSB/AJSR/1304/2020/DD/29 00
40 TOILET DETAIL - ASRAMA LMSB/AJSR/1304/2020/DD/30 00
41 TOILET & LAUNDRY DETAIL - ASRAMA LMSB/AJSR/1304/2020/DD/31 00
42 TOILET & LAUNDRY DETAIL - ASRAMA LMSB/AJSR/1304/2020/DD/32 00
43 TOILET & LAUNDRY DETAIL - ASRAMA LMSB/AJSR/1304/2020/DD/33 00
44 TOILET & LAUNDRY DETAIL - ASRAMA LMSB/AJSR/1304/2020/DD/34 00
45 STAIRCASE (DEWAN) LMSB/AJSR/1304/2020/DD/35 00
46 STAIRCASE (DEWAN) LMSB/AJSR/1304/2020/DD/36 00
47 STAIRCASE (DEWAN) LMSB/AJSR/1304/2020/DD/37 00

LOD/1
NO DRAWING TITLE DRAWING NO. REV
48 STAIRCASE (DEWAN) LMSB/AJSR/1304/2020/DD/38 00

ARCHITECTURE DRAWING (CONT'D)

DETAIL DRAWINGS (CONT'D)


49 KITCHEN DETAIL (DEWAN) LMSB/AJSR/1304/2020/DD/39 00
50 KITCHEN DETAIL (DEWAN) LMSB/AJSR/1304/2020/DD/40 00
51 KITCHEN DETAIL (DEWAN) LMSB/AJSR/1304/2020/DD/41 00
52 KITCHEN DETAIL (ASRAMA) LMSB/AJSR/1304/2020/DD/42 00
53 KITCHEN DETAIL (ASRAMA) LMSB/AJSR/1304/2020/DD/43 00
54 KITCHEN DETAIL (ASRAMA) LMSB/AJSR/1304/2020/DD/44 00
55 SURAU & ABLUTION (ASRAMA) LMSB/AJSR/1304/2020/DD/45 00
56 SURAU & ABLUTION (ASRAMA) LMSB/AJSR/1304/2020/DD/46 00
57 FACADE DETAIL (ASRAMA) LMSB/AJSR/1304/2020/DD/47 00
58 ROOF DETAIL LMSB/AJSR/1304/2020/DD/48 00
59 ROOF DETAIL LMSB/AJSR/1304/2020/DD/49 00
60 TYPICAL WATERPROOFING DETAIL LMSB/AJSR/1304/2020/DD/50 00
61 TYPICAL EXPAMET DETAIL LMSB/AJSR/1304/2020/DD/51 00
62 TYPICAL DROP DETAIL LMSB/AJSR/1304/2020/DD/52 00
63 TYPICAL APRON DETAIL LMSB/AJSR/1304/2020/DD/53 00

STRUCTURAL DRAWINGS

1 LIST OF DRAWINGS SCHEDULE GC-AJSR-MOCCIS-DR-LIST OF DWG -


LADANG MOCCIS EARTHWORK
2 EARTHWORK LAYOUT PLAN GC-AJSR-MOCCIS-DR-22-EW-1001 -
3 EARTHWORK SECTION (SHEET 1/3) GC-AJSR-MOCCIS-DR-22-EW-1002 -
4 EARTHWORK SECTION (SHEET 2/3) GC-AJSR-MOCCIS-DR-22-EW-1003 -
5 EARTHWORK SECTION (SHEET 3/3) GC-AJSR-MOCCIS-DR-22-EW-1004 -
6 SILT TRAP AND WASHTHROUGH DETAILS GC-AJSR-MOCCIS-DR-22-EW-1005 -
7 TEMPORARY WORK SIGNAGE AND INTERLOCKING CONCRETE
PAVING DETAILS GC-AJSR-MOCCIS-DR-22-EW-1006 -
LADANG MOCCIS ROAD AND DRAINAGE
8 ROAD AND DRAINAGE LAYOUT PLAN GC-AJSR-MOCCIS-DR-22-RD-1001 -
9 ROAD OF DETAILS (SHEET 1/2) GC-AJSR-MOCCIS-DR-22-RD-1002 -
10 ROAD OF DETAILS (SHEET 2/2) GC-AJSR-MOCCIS-DR-22-RD-1003 -
11 DRAINAGE OF DETAILS (SHEET 1/2) GC-AJSR-MOCCIS-DR-22-RD-1004 -
12 DRAINAGE OF DETAILS (SHEET 2/2) GC-AJSR-MOCCIS-DR-22-RD-1005 -
LADANG MOCCIS_SEWERAGE
13 SEWERAGE LAYOUT PLAN GC-AJSR-MOCCIS-DR-22-SW-1001 -
14 SEWERAGE DETAILS (SHEET 1/3) GC-AJSR-MOCCIS-DR-22-SW-1002 -
15 SEWERAGE DETAILS (SHEET 2/3) GC-AJSR-MOCCIS-DR-22-SW-1003 -
16 SEWERAGE DETAILS (SHEET 3/3) GC-AJSR-MOCCIS-DR-22-SW-1004 -
LADANG MOCCIS_WATER SUPPLY
17 WATER SUPPLY LAYOUT PLAN GC-AJSR-MOCCIS-DR-22-WR-1001 -
18 STANDARD DETAILS WATER SUPPLY (SHEET 1/2) GC-AJSR-MOCCIS-DR-22-WR-1002 -
19 STANDARD DETAILS WATER SUPPLY (SHEET 2/2) GC-AJSR-MOCCIS-DR-22-WR-1003 -
STRUCTURAL
20 GENERAL NOTES (SHEET 1/4) GC-AJSR-MOCCIS-DW-22-RC-GEN NOTES 1 -
21 GENERAL NOTES (SHEET 2/4) GC-AJSR-MOCCIS-DW-22-RC-GEN NOTES 2 -
22 GENERAL NOTES (SHEET 3/4) GC-AJSR-MOCCIS-DW-22-RC-GEN NOTES 3 -
23 GENERAL NOTES (SHEET 4/4) GC-AJSR-MOCCIS-DW-22-RC-GEN NOTES 4 -
LADANG MOCCIS DEWAN
24 FOUNDATION LAYOUT PLAN GC-AJSR-MOCCIS-DW-22-RC-F-1001 -

LOD/2
NO DRAWING TITLE DRAWING NO. REV
25 FOUNDATION DETAILS (SHEET 1/6) GC-AJSR-MOCCIS-DW-22-RC-F-1002 -
26 FOUNDATION DETAILS (SHEET 2/6) GC-AJSR-MOCCIS-DW-22-RC-F-1003 -
27 FOUNDATION DETAILS (SHEET 3/6) GC-AJSR-MOCCIS-DW-22-RC-F-1004 -
28 FOUNDATION DETAILS (SHEET 4/6) GC-AJSR-MOCCIS-DW-22-RC-F-1005 -
29 FOUNDATION DETAILS (SHEET 5/6) GC-AJSR-MOCCIS-DW-22-RC-F-1006 -
30 FOUNDATION DETAILS (SHEET 6/6) GC-AJSR-MOCCIS-DW-22-RC-F-1007 -
26 COLUMN SCHEDULE (SHEET 1/3) GC-AJSR-MOCCIS-DW-22-RC-F-1008 -
27 COLUMN SCHEDULE (SHEET 2/3) GC-AJSR-MOCCIS-DW-22-RC-F-1009 -
28 COLUMN SCHEDULE (SHEET 3/3) GC-AJSR-MOCCIS-DW-22-RC-F-1010 -

STRUCTURAL DRAWINGS (CONT'D)

LADANG MOCCIS DEWAN (CONT'D)


29 GROUND FLOOR LAYOUT PLAN GC-AJSR-MOCCIS-DW-22-RC-GF-1000 -
30 GROUND BEAM DETAILS (SHEET 1/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1001 -
31 GROUND BEAM DETAILS (SHEET 2/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1002 -
32 GROUND BEAM DETAILS (SHEET 3/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1003 -
33 GROUND BEAM DETAILS (SHEET 4/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1004 -
34 GROUND BEAM DETAILS (SHEET 5/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1005 -
35 GROUND BEAM DETAILS (SHEET 6/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1006 -
36 GROUND BEAM DETAILS (SHEET 7/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1007 -
37 GROUND BEAM DETAILS (SHEET 8/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1008 -
38 GROUND BEAM DETAILS (SHEET 9/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1009 -
39 GROUND BEAM DETAILS (SHEET 10/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1010 -
40 GROUND BEAM DETAILS (SHEET 11/11) GC-AJSR-MOCCIS-DW-22-RC-GF-1011 -
41 FIRST FLOOR LAYOUT PLAN GC-AJSR-MOCCIS-DW-22-RC-1F-1000 -
42 FIRST FLOOR BEAM DETAILS (SHEET 1/5) GC-AJSR-MOCCIS-DW-22-RC-1F-1001 -
43 FIRST FLOOR BEAM DETAILS (SHEET 2/5) GC-AJSR-MOCCIS-DW-22-RC-1F-1002 -
44 FIRST FLOOR BEAM DETAILS (SHEET 3/5) GC-AJSR-MOCCIS-DW-22-RC-1F-1003 -
45 FIRST FLOOR BEAM DETAILS (SHEET 4/5) GC-AJSR-MOCCIS-DW-22-RC-1F-1004 -
46 FIRST FLOOR BEAM DETAILS (SHEET 5/5) GC-AJSR-MOCCIS-DW-22-RC-1F-1005 -
47 ROOF BEAM LAYOUT PLAN GC-AJSR-MOCCIS-DW-22-RC-RF-1000 -
48 ROOF TRUSS / PURLIN LAYOUT PLAN GC-AJSR-MOCCIS-DW-22-RC-RF-1001 -
49 TRUSS TYPE GC-AJSR-MOCCIS-DW-22-RC-RF-1002 -
50 ROOF BEAM DETAILS (SHEET 1/3) GC-AJSR-MOCCIS-DW-22-RC-RF-1003 -
51 ROOF BEAM DETAILS (SHEET 2/3) GC-AJSR-MOCCIS-DW-22-RC-RF-1004 -
52 ROOF BEAM DETAILS (SHEET 3/3) GC-AJSR-MOCCIS-DW-22-RC-RF-1005 -
53 STAIRCASE DETAILS GC-AJSR-MOCCIS-DW-22-RC-STC-1001 -
54 LADANG MOCCIS ASRAMA
55 GENERAL NOTES (SHEET 1/4) GC-AJSR-MOCCIS-DM-22-RC-GEN NOTES 1 -
56 GENERAL NOTES (SHEET 2/4) GC-AJSR-MOCCIS-DM-22-RC-GEN NOTES 2 -
57 GENERAL NOTES (SHEET 3/4) GC-AJSR-MOCCIS-DM-22-RC-GEN NOTES 3 -
58 GENERAL NOTES (SHEET 4/4) GC-AJSR-MOCCIS-DM-22-RC-GEN NOTES 4 -
59 FOUNDATION LAYOUT PLAN GC-AJSR-MOCCIS-DM-22-RC-F-1001 -
60 FOUNDATION DETAILS (SHEET 1/2) GC-AJSR-MOCCIS-DM-22-RC-F-1002 -
61 FOUNDATION DETAILS (SHEET 2/2) GC-AJSR-MOCCIS-DM-22-RC-F-1003 -
62 COLUMN SCHEDULE (SHEET 1/2) GC-AJSR-MOCCIS-DM-22-RC-F-1004 -
63 COLUMN SCHEDULE (SHEET 2/2) GC-AJSR-MOCCIS-DM-22-RC-F-1005 -
64 GROUND FLOOR LAYOUT PLAN GC-AJSR-MOCCIS-DM-22-RC-GF-1000 -
65 GROUND SLAB REINFORCEMENT LAYOUT PLAN GC-AJSR-MOCCIS-DM-22-RC-GF-1001 -
66 GROUND BEAM DETAILS (SHEET 1/9) GC-AJSR-MOCCIS-DM-22-RC-GF-1002 -
67 GROUND BEAM DETAILS (SHEET 2/9) GC-AJSR-MOCCIS-DM-22-RC-GF-1003 -
68 GROUND BEAM DETAILS (SHEET 3/9) GC-AJSR-MOCCIS-DM-22-RC-GF-1004 -
69 GROUND BEAM DETAILS (SHEET 4/9) GC-AJSR-MOCCIS-DM-22-RC-GF-1005 -
70 GROUND BEAM DETAILS (SHEET 5/9) GC-AJSR-MOCCIS-DM-22-RC-GF-1006 -
71 GROUND BEAM DETAILS (SHEET 6/9) GC-AJSR-MOCCIS-DM-22-RC-GF-1007 -

LOD/3
NO DRAWING TITLE DRAWING NO. REV
72 GROUND BEAM DETAILS (SHEET 7/9 GC-AJSR-MOCCIS-DM-22-RC-GF-1008 -
73 GROUND BEAM DETAILS (SHEET 8/9) GC-AJSR-MOCCIS-DM-22-RC-GF-1009 -
74 GROUND BEAM DETAILS (SHEET 9/9) GC-AJSR-MOCCIS-DM-22-RC-GF-1010 -
75 ROOF LAYOUT PLAN GC-AJSR-MOCCIS-DM-22-RC-RF-1000 -
76 ROOF SLAB RENFORCERMENT LAYOUT PLAN GC-AJSR-MOCCIS-DM-22-RC-RF-1001 -
77 ROOF BEAM DETAILS (SHEET 1/7) GC-AJSR-MOCCIS-DM-22-RC-RF-1002 -
78 ROOF BEAM DETAILS (SHEET 2/7) GC-AJSR-MOCCIS-DM-22-RC-RF-1003 -
79 ROOF BEAM DETAILS (SHEET 3/7) GC-AJSR-MOCCIS-DM-22-RC-RF-1004 -
80 ROOF BEAM DETAILS (SHEET 4/7) GC-AJSR-MOCCIS-DM-22-RC-RF-1005 -
81 ROOF BEAM DETAILS (SHEET 5/7) GC-AJSR-MOCCIS-DM-22-RC-RF-1006 -
82 ROOF BEAM DETAILS (SHEET 6/7) GC-AJSR-MOCCIS-DM-22-RC-RF-1007 -
83 ROOF BEAM DETAILS (SHEET 7/7) GC-AJSR-MOCCIS-DM-22-RC-RF-1008 -

LOD/4
LUNDANG BUNGALOW
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH RUMAH BANGLO 3 TINGKAT DI ATAS LOT
1798 & LOT 968, MUKIM LUNDANG, JAJAHAN KOTA BHARU, KELANTAN DARUL NAIM

1.00 CONSTRUCTION COST (RM)

1.01 General Site Clearance & Earthwork say 50,000.00

1.02 Piling Work 25,365 Sqft @ 15.00 per sqft 380,500.00

1.03 Main Building Work 4,749,700.00

1.04 M&E Works ( Internal ) 1,000,000.00

1.05 Built In Furniture -

1.06 Landscaping Work say 50,000.00

1.07 External Works say 150,000.00


6,380,200.00

1.08 Preliminaries say 5% 319,000.00


6,699,200.00

1.09 Contingencies & Design Reserve say 5% 335,000.00

Total Estimated Construction Cost 7,034,200.00

1.10 Professional Fees say 12% 844,100.00

1.11 Reimbursables say 15,000.00

1.12 Contribution to Authorities : say 1% 70,300.00

1.13 Site Survey & Soil Investigation say 10,000.00

Total Estimated Project Cost RM 7,973,600.00

16.11.2021 1 jbb.kl/lundang/est/01
A R C H I T E C T
A R C H I T E C T
A R C H I T E C T
A R C H I T E C T
STEMCELL
TAHFIZ
KLIA
Section A3(C) - Bills of Quantities
Bill No. 2 - Main Terminal Building (MTB)
Wall Finishes

RATIONALISED TENDER
Item Description Unit Qty Rate Amount Rate Amount
(RM) (RM)
ELEMENT NO.4 : WALL FINISHES

Notes & General Rules


All internal HW framing for wall cladding to be of
tanalized timber and to be treated with insect/termite
protection treatment prior to cladding works.

All wall finishes material must be strictly followed


selected brand and series as per ID's specification.

SCREED

Cement and sand (1:3) to receive wall tiles:-

A 13mm Thick screeded backing to wall and column m2 186 40.00 7,440.00 28.00 5,208.00
including 5mm thick MAPEI ADESILEX P9
cementitious bonding adhesive.

Toilet DPP3
Toilet DPP1C
Toilet DPP1B
Toilet DPP1A
Toilet DPP1
Toilet DPP5
Toilet DPP2
Toilet DPP2A
Toilet MZP6
Toilet MZS2
Toilet MZS2A
Toilet MZP1A
Toilet MZP1
Toilet ARP3 186
Toilet ARP5A
Toilet ARP6
Toilet ARP5
Toilet SMS1
Toilet ERL11
Toilet ERL12
186

To Collection RM 7,440.00 RM 5,208.00

A3(C)/2/4/1
Section A3(C) - Bills of Quantities
Bill No. 2 - Main Terminal Building (MTB)
Wall Finishes

RATIONALISED TENDER
Item Description Unit Qty Rate Amount Rate Amount
(RM) (RM)

ELEMENT NO.4 : WALL FINISHES (CONT'D)

SCREED (CONT'D)

Cement and sand (1:3) to receive wall tiles (Cont'd):-

A 284mm high screeded backing to wall and column m 70 20.00 1,400.00 11.00 770.00
including 5mm thick MAPEI ADESILEX P9
cementitious bonding adhesive.

Toilet DPP3
Toilet DPP1C
Toilet DPP1B
Toilet DPP1A
Toilet DPP1
Toilet DPP5
Toilet DPP2
Toilet DPP2A
Toilet MZP6
Toilet MZS2
Toilet MZS2A
Toilet MZP1A
Toilet MZP1
Toilet ARP3 70
Toilet ARP5A
Toilet ARP6
Toilet ARP5
Toilet SMS1
Toilet ERL11
Toilet ERL12
70

To Collection RM 1,400.00 RM 770.00

A3(C)/2/4/2
Section A3(C) - Bills of Quantities
Bill No. 2 - Main Terminal Building (MTB)
Wall Finishes

RATIONALISED TENDER
Item Description Unit Qty Rate Amount Rate Amount
(RM) (RM)

ELEMENT NO.4 : WALL FINISHES (CONT'D)

WALL TILES

600mm x 600mm x 9mm Thick Vinecera White (SAP


6205 - T4) glaze polished porcelain tiles bedded in 3mm
(max) gap selected colour MAPEI ULTRA COLOUR
PLUS cementitious grout all as specified and laid on
screeded bed (measured separately) to S.O's approved
pattern , laid to wall:-

A Laid to wall m2 179 193.80 34,690.20 193.80 34,690.20

BREAKDOWN PRICES PER (M2)

a) Material Cost RM

b) Wastage (__%) of RM
Material Cost.

c) Accessories cost RM

d) Labour cost RM

e) Profit & overhead RM

Total rate per unit RM

Toilet DPP3
Toilet DPP1C
Toilet DPP1B
Toilet DPP1A
Toilet DPP1
Toilet DPP5
Toilet DPP2
Toilet DPP2A
Toilet MZP6
Toilet MZS2
Toilet MZS2A
Toilet MZP1A
Toilet MZP1
Toilet ARP3 179
Toilet ARP5A
Toilet ARP6
Toilet ARP5
Toilet SMS1
Toilet ERL11
Toilet ERL12
179

To Collection RM 34,690.20 RM 34,690.20

A3(C)/2/4/3
Section A3(C) - Bills of Quantities
Bill No. 2 - Main Terminal Building (MTB)
Wall Finishes

RATIONALISED TENDER
Item Description Unit Qty Rate Amount Rate Amount
(RM) (RM)

ELEMENT NO.4 : WALL FINISHES (CONT'D)

WALL TILES

300mm x 300mm x 7.5mm Thick Niro (GTK01 - T7)


matt finished homogenous tiles or other approved
equivalent bedded in cement and sand (1:3) pointed in
matching coloured cement and laid on screeded bed
(measured separately) to Architect's approved pattern :-

A Laid to wall m2 7 120.60 844.20 120.60 844.20

BREAKDOWN PRICES PER (M2)

a) Material Cost RM

b) Wastage (__%) of RM
Material Cost.

c) Accessories cost RM

d) Labour cost RM

e) Profit & overhead RM

Total rate per unit RM

Toilet DPP3
Toilet DPP1C
Toilet DPP1B
Toilet DPP1A
Toilet DPP1
Toilet DPP5
Toilet DPP2
Toilet DPP2A
Toilet MZP6
Toilet MZS2
Toilet MZS2A
Toilet MZP1A
Toilet MZP1
Toilet ARP3 7
Toilet ARP5A
Toilet ARP6
Toilet ARP5
Toilet SMS1
Toilet ERL11
Toilet ERL12
7

To Collection RM 844.20 RM 844.20

A3(C)/2/4/4
Section A3(C) - Bills of Quantities
Bill No. 2 - Main Terminal Building (MTB)
Wall Finishes

RATIONALISED TENDER
Item Description Unit Qty Rate Amount Rate Amount
(RM) (RM)

ELEMENT NO.4 : WALL FINISHES (CONT'D)

WALL TILES (CONT'D)

284mm x 600mm x 9mm Thick Vinecera White (SAP


62M58 - T2) matt finished factory cut porcelain tiles
bedded in 3mm (max) gap selected colour MAPEI
ULTRA COLOUR PLUS cementitious grout all as
specified and laid on screeded bed (measured separately)
to S.O's approved pattern , laid to wall:-

A 284mm High, overall 300mm height skirting laid to wall m 70 111.40 7,798.00 111.40 7,798.00
complete with anodized aluminium wall corner guard
(WG1)

BREAKDOWN PRICES PER (M2)

a) Material Cost RM

b) Wastage (__%) of RM
Material Cost.

c) Accessories cost RM

d) Labour cost RM

e) Profit & overhead RM

Total rate per unit RM

Toilet DPP3
Toilet DPP1C
Toilet DPP1B
Toilet DPP1A
Toilet DPP1
Toilet DPP5
Toilet DPP2
Toilet DPP2A
Toilet MZP6
Toilet MZS2
Toilet MZS2A
Toilet MZP1A
Toilet MZP1
Toilet ARP3 70
Toilet ARP5A
Toilet ARP6
Toilet ARP5
Toilet SMS1
Toilet ERL11
Toilet ERL12

70

To Collection RM 7,798.00 RM 7,798.00

A3(C)/2/4/5
Section A3(C) - Bills of Quantities
Bill No. 2 - Main Terminal Building (MTB)
Wall Finishes

RATIONALISED TENDER
Item Description Unit Qty Rate Amount Rate Amount
(RM) (RM)

ELEMENT NO.4 : WALL FINISHES (CONT'D)

SUNDRIES

A To supply and install satin finish stainless steel round m 40 108.00 4,320.00 108.00 4,320.00
corner bead profile with specified adhesive and any other
necessary works required accordanve to manufactuerer's
detail and S.O's specification (WG2)

Toilet DPP3
Toilet DPP1C
Toilet DPP1B
Toilet DPP1A
Toilet DPP1
Toilet DPP5
Toilet DPP2
Toilet DPP2A
Toilet MZP6
Toilet MZS2
Toilet MZS2A
Toilet MZP1A
Toilet MZP1
Toilet ARP3 40
Toilet ARP5A
Toilet ARP6
Toilet ARP5
Toilet SMS1
Toilet ERL11
Toilet ERL12
40

To Collection RM 4,320.00 RM 4,320.00

A3(C)/2/4/6
Section A3(C) - Bills of Quantities
Bill No. 2 - Main Terminal Building (MTB)
Wall Finishes

RATIONALISED TENDER
Item Description Unit Qty Rate Amount Rate Amount
(RM) (RM)

ELEMENT NO.4 : WALL FINISHES (CONT'D)

COLLECTION

Page A3(C)/2/4/1 7,440.00 5,208.00

Page A3(C)/2/4/2 1,400.00 770.00

Page A3(C)/2/4/3 34,690.20 34,690.20

Page A3(C)/2/4/4 844.20 844.20

Page A3(C)/2/4/5 7,798.00 7,798.00

Page A3(C)/2/4/6 4,320.00 4,320.00

ELEMENT NO.4 : WALL FINISHES


TOTAL CARRIED TO SUMMARY OF BILL NO. 2 RM 56,492.40 RM 53,630.40

A3(C)/2/4/7
MRSM DUNGUN
STRUCTURE WORKS

PROJECT : KILANG BERKEMBAR 1 TINGKAT,SUNGAI KAPAR INDAH


TAKER OFF : DANIAL
DRAWING DATE :
DRAWING NO. :
ELEMENT : BRC A10 SLAB
LEVEL/FLOOR : CANTEEN

BRC A10 SLAB


SIZE Total
TYPE NO
L W BRC (m2)
GF

1 1 4.615 4.575 21.114


2 1 4.660 4.575 21.320
3 1 6.625 4.575 30.309

TOTAL 72.743
STRUCTURE WORKS

PROJECT : KILANG BERKEMBAR 1 TINGKAT,SUNGAI KAPAR INDAH


TAKER OFF : DANIAL
DRAWING DATE :
DRAWING NO. :
ELEMENT : BRC A10 SLAB
LEVEL/FLOOR : 1ST FLOOR

BRC A10 SLAB


SIZE Total
TYPE NO
L W BRC (m2)
1ST
TOP
1 1 36.500 7.533 274.95 BRC A10 at top and bottom
2 1 18.450 7.790 143.73
3 1 16.340 7.790 127.29
4 1 3.150 2.120 6.68
BOTTOM
1 2 3.650 7.533 27.50 kanan kiri (end so ada 2)
2 2 3.650 7.790 28.43
3 1 4.400 7.790 34.28
4 1 4.240 7.790 33.03

TOTAL 675.88
REINFORCEMEN
HIGH
PROJECT MASJID KOTASAS
LEVEL/FLOOR ROOF
DRAWING NO. :
DATE 7/9/21
TAKER OFF NZR
ELEMENT ROOF BEAM
mild steel

Dia. No. of LENGTH TOTAL Sizes of Bars Stirrups/Links


Location Dia. (HT) Times C/C Remarks
(MS) member C/C HOOK BEND REBAR LENGTH 6 8 10 12 16 20 25 32 6 8 10 12 16

SLAB CANTEEN

CANTEEN
BTM 10.00 1 18 0.400 6.625 0.240 5.38 5.62 101.07
STIRRUP 10.00 1 12 0.400 4.575 0.240 7.43 7.67 91.98

1st FLOOR
1
TOP 10.00 40 8 0.300 1.970 1.217 1.22 389.33
TOP 10.00 40 8 0.300 1.970 1.217 1.22 389.33
BTM 12.00 40 8 0.300 1.970 1.217 1.22 389.33

2
TOP 10.00 20 8 0.300 1.970 1.217 1.22 194.67
TOP 10.00 20 8 0.300 1.970 1.217 1.22 194.67
BTM 12.00 20 8 0.300 1.970 1.217 1.22 194.67

3
TOP 10.00 4 8 0.300 1.970 1.467 1.47 46.93
TOP 10.00 4 8 0.300 1.970 1.467 1.47 46.93
BTM 12.00 4 8 0.300 1.970 1.467 1.47 46.93

TOP 10.00 4 8 0.300 1.970 1.220 1.22 39.04


TOP 10.00 4 8 0.300 1.970 1.220 1.22 39.04
BTM 12.00 4 8 0.300 1.970 1.220 1.22 39.04

TOP 10.00 4 8 0.300 1.970 1.310 1.31 41.92


TOP 10.00 4 8 0.300 1.970 1.310 1.31 41.92
BTM 12.00 4 8 0.300 1.970 1.310 1.31 41.92

TOP 10.00 4 8 0.300 1.970 1.413 1.41 45.23


TOP 10.00 4 8 0.300 1.970 1.413 1.41 45.23
BTM 12.00 4 8 0.300 1.970 1.413 1.41 45.23

4
TOP 10.00 1 8 0.300 1.970 1.277 1.28 10.21
TOP 10.00 1 8 0.300 1.970 1.277 1.28 10.21
BTM 12.00 1 8 0.300 1.970 1.277 1.28 10.21

Total length in metre 0.00 0.00 1727.72 767.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tonne per metre 0.222 0.395 0.617 0.888 1.579 2.467 3.854 6.315 0.222 0.395 0.617 0.888 1.579
Total weights in kg 0.00 0.00 1066.00 681.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL WEIGHT (KG) : 1747.39

PAGE 3/5
REINFORCEMEN
HIGH
PROJECT MASJID KOTASAS
LEVEL/FLOOR ROOF
DRAWING NO. :
DATE 7/9/21
TAKER OFF NZR
ELEMENT ROOF BEAM
mild steel

Dia. No. of LENGTH TOTAL Sizes of Bars Stirrups/Links


Location Dia. (HT) Times C/C Remarks
(MS) member C/C HOOK BEND REBAR LENGTH 6 8 10 12 16 20 25 32 6 8 10 12 16

GROUND BEAM

GB1
TOP 12.00 1 2 4.47 4.47 8.94
TOP 16.00 1 2 2.74 2.74 5.48
TOP 12.00 1 2 3.00 3.00 6.00
TOP 20.00 1 2 2.38 2.38 4.76
TOP 20.00 1 2 3.76 3.76 7.52
TOP 12.00 1 2 6.10 6.10 12.20
BTM 16.00 1 2 5.78 5.78 11.56
BTM 12.00 1 2 4.43 4.43 8.86
BTM 20.00 1 2 8.40 8.40 16.80
BTM 12.00 1 2 5.30 5.30 10.60
STIRRUP 6.00 1 26 0.175 4.460 0.144 1.00 1.14 29.74
STIRRUP 6.00 1 26 0.175 4.430 0.144 1.00 1.14 29.74
STIRRUP 6.00 1 34 0.200 6.550 0.144 1.00 1.14 38.90

GB2
TOP 12.00 1 2 5.50 5.50 11.00
BOTTOM 20.00 1 2 5.50 5.50 11.00
STIRRUP 6.00 1 26 0.175 4.340 0.144 1.00 1.14 29.74

GB3
TOP 12.00 1 2 5.50 5.50 11.00
BTM 20.00 1 2 5.40 5.40 10.80
BTM 16.00 1 2 3.90 3.90 7.80
STIRRUP 6.00 2 26 0.175 4.420 0.144 1.00 1.14 59.49

ROOF BEAM
MB1
TOP 12.00 1 2 6.50 6.50 13.00
TOP 12.00 1 2 11.40 11.40 22.80
BTM 12.00 1 2 10.60 10.60 21.20
BTM 12.00 1 2 7.00 7.00 14.00
STIRRUP 6.00 1 27 0.175 4.50 0.144 1.00 1.14 30.89
STIRRUP 6.00 1 26 0.175 4.40 0.144 1.00 1.14 29.74
STIRRUP 6.00 1 39 0.175 6.60 0.144 1.00 1.14 44.62

MB2
TOP 12.00 1 2 5.50 5.50 11.00
BTM 12.00 1 2 5.50 5.50 11.00
STIRRUP 6.00 1 26 0.175 4.300 0.144 1.00 1.14 29.74

Total length in metre 0.00 0.00 0.00 161.60 24.84 50.88 0.00 0.00 322.61 0.00 0.00 0.00 0.00
Tonne per metre 0.222 0.395 0.617 0.888 1.579 2.467 3.854 6.315 0.222 0.395 0.617 0.888 1.579
Total weights in kg 0.00 0.00 0.00 143.50 39.22 125.52 0.00 0.00 71.62 0.00 0.00 0.00 0.00

TOTAL WEIGHT (KG) : 379.86

PAGE 4/5
REINFORCEMEN
HIGH
PROJECT MASJID KOTASAS (MINARET)
LEVEL/FLOOR ROOF
DRAWING NO.
DATE 7/9/21
TAKER OFF NZR
ELEMENT BEAM FOR MINARET
mild steel

Dia. No. of LENGTH TOTAL Sizes of Bars Stirrups/Links


Location Dia. (HT) Times C/C Remarks
(MS) member C/C HOOK BEND REBAR LENGTH 6 8 10 12 16 20 25 32 6 8 10 12 16

MIDDLE

HORIZONTAL
TOP 12.00 1 206 0.200 40.950 5.23 5.23 1,076.97
BTM 12.00 1 206 0.200 40.950 4.80 4.80 988.80

VERTICAL
TOP 12.00 1 24 0.200 4.660 2.048 40.95 43.00 1,031.94
BTM 12.00 1 24 0.200 4.660 2.048 40.95 43.00 1,031.94

EDGE

HORIZONTAL
TOP 12.00 1 206 0.200 40.950 1.86 1.86 383.16
BTM 12.00 1 206 0.200 40.950 1.46 1.46 300.76

VERTICAL
TOP 12.00 1 8 0.200 1.300 2.048 40.95 43.00 343.98
BTM 12.00 1 8 0.200 1.300 2.048 40.95 43.00 343.98

Total length in metre 0.00 0.00 0.00 5501.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tonne per metre 0.222 0.395 0.617 0.888 1.579 2.467 3.854 6.315 0.222 0.395 0.617 0.888 1.579
Total weights in kg 0.00 0.00 0.00 4885.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL WEIGHT (KG) : 4885.36

PAGE 5/5
CONTRACT DOCUMENT

PEMBINAAN MAKTAB RENDAH SAINS MARA (MRSM)


DUNGUN, TERENGGANU (REKA DAN BINA)

CONTRACT DOCUMENT

The Contract Document shall comprise of the following volumes and parts: -

VOLUME 1 of 3 CONTRACTUAL AND GENERAL REQUIREMENTS

VOLUME 2 of 3 GOVERNMENT TECHNICAL REQUIREMENTS

VOLUME 3 of 3 CONTRACTOR’S PROPOSAL

I
CONTRACT DOCUMENT

PEMBINAAN MAKTAB RENDAH SAINS MARA (MRSM)


DUNGUN, TERENGGANU (REKA DAN BINA)

TABLE OF CONTENT

PART DETAILS PAGE

VOLUME III of III CONTRACTOR’S PROPOSAL

PART 1.1 1.0 CONTRACTOR’S PROPOSAL FOR ICT


WORKS
1.1.1 CERTIFICATE OF MOF
1.1.2 ICT SERVICES
1.1.3 COMPLIANCE/DEVIATION TO
REQUIREMENTS OF ICT
1.1.4 WORKS BRIEF
1.1.5 PROPOSED BRANDS AND
MATERIALS
1.1.6 SUPERVISION DURING
CONSTRUCTION
1.1.7 ROOM DATA OF ICT
FACILITIES
1.1.8 TECHNICAL WRITE-UP
1.1.9 SCHEMATIC ICT AND
TELEPHONE
1.1.10 TENDER SUM ANALYSIS (TSA)
1.1.11 BRANDS & CATALOGUE
2.0 BIM CONTRACTOR PROPOSAL FOR ICT
WORKS
2.1 TENDER PROPOSAL PHASE
2.1.1 OUTLINE OF BIM PROJECT
EXECUTION PLAN (BPEP)
2.1.2 DESIGN MODEL
2.1.3 SPATIAL ANALYSIS REPORT
2.1.4 TENDER DRAWINGS
DOCUMENTATION IN
SOFTCOPY
2.1.5 TENDER DRAWINGS
DOCUMENTATION IN
HARDCOPY
2.1.6 SAMPLE OF AS-BUILT MODEL
IN SOFTCOPY
2.2 DETAILED DESIGN PHASE
2.2.1 COORDINATED MODEL
2.3 CONSTRUCTION PHASE

II
CONTRACT DOCUMENT

2.3.1 UPDATING BIM PROJECT


EXECUTION PLAN (BPEP)
2.3.2 CONSTRUCTION MODEL
2.3.3 CONSTRUCTION DRAWING
DOCUMENTATION IN
SOFTCOPY
2.3.4 CONSTRUCTION DRAWING
DOCUMENTATION IN
HARDCOPY
2.3.5 COORDINATED MODEL
2.3.6 CONSTRUCTION SIMULATION
MODEL
2.4 CLOSE OUT PHASE
2.4.1 UPDATING BIM PROJECT
EXECUTION PLAN (BPEP)
2.4.2 AS-BUILT MODEL
2.4.3 AS-BUILT DRAWING
DOCUMENTATION IN
SOFTCOPY
2.4.4 AS-BUILT DRAWING
DOCUMENTATION IN
HARDCOPY
2.5 CONSULTANTS COMPANY PROFILE

III
CONTRACT DOCUMENT

PEMBINAAN MAKTAB RENDAH SAINS MARA (MRSM)


DUNGUN, TERENGGANU (REKA DAN BINA)

CONTRACT DOCUMENT

The Contract Document shall comprise of the following volumes and parts: -

VOLUME 1 of 3 CONTRACTUAL AND GENERAL REQUIREMENTS

VOLUME 2 of 3 GOVERNMENT TECHNICAL REQUIREMENTS

VOLUME 3 of 3 CONTRACTOR’S PROPOSAL

I
CONTRACT DOCUMENT

PEMBINAAN MAKTAB RENDAH SAINS MARA (MRSM)


DUNGUN, TERENGGANU (REKA DAN BINA)

TABLE OF CONTENT

PART DETAILS PAGE

VOLUME III of III CONTRACTOR’S PROPOSAL

PART 6 1.0 CONCTRACTOR’S PROPOSAL FOR


MECHANICAL WORKS
1.1 MECHANICAL SCOPE OF WORKS
1.1.1 DESIGN BRIEF AND PROPOSAL
WRITE UP
1.1.2 SYSTEM & EQUIPMENT
SELECTION
-AIR CONDITIONING AND
MECHANICAL VENTILATION
SYSTEMS
-FIRE FIGHTING SYSTEMS
-INTERNAL COLD WATER AND
SANITARY PLUMBING SYSTEM
-KITCHEN EQUIPMENT
-LIQUEFIED PETROLEUM
SYSTEM
-FUME CUPBOARD SYSTEM
-OTHER MECHANICAL
EQUIPMENT / SYSTEM
1.2 BREAKDOWN OF TENDER PRICES
1.3 CONCEPTUAL DESIGN CALCULATION
1.4 TECHNICAL SPECIFICATION
1.5 TECHNICAL DATA EQUIPMENT
1.6 DESIGN DRAWING (LAYOUT &
SCHEMATIC)
1.7 CATALOGUE OF MAJOR EQUIPMENT
OFFERED
1.8 ANY OTHER INFORMATION
1.9 CONSULTANTS COMPANY PROFILE
2.0 BIM CONTRACTOR PROPOSAL FOR
MECHANICAL WORKS
2.1 TENDER PROPOSAL PHASE
2.1.1 OUTLINE OF BIM PROJECT
EXECUTION PLAN (BPEP)
2.1.2 DESIGN MODEL
2.1.3 SPATIAL ANALYSIS REPORT

II
CONTRACT DOCUMENT

2.1.4 TENDER DRAWINGS


DOCUMENTATION IN
SOFTCOPY
2.1.5 TENDER DRAWINGS
DOCUMENTATION IN
HARDCOPY
2.1.6 SAMPLE OF AS-BUILT MODEL
IN SOFTCOPY
2.2 DETAILED DESIGN PHASE
2.2.1 COORDINATED MODEL
2.3 CONSTRUCTION PHASE
2.3.1 UPDATING BIM PROJECT
EXECUTION PLAN (BPEP)
2.3.2 CONSTRUCTION MODEL
2.3.3 CONSTRUCTION DRAWING
DOCUMENTATION IN
SOFTCOPY
2.3.4 CONSTRUCTION DRAWING
DOCUMENTATION IN
HARDCOPY
2.3.5 COORDINATED MODEL
2.3.6 CONSTRUCTION SIMULATION
MODEL
2.4 CLOSE OUT PHASE
2.4.1 UPDATING BIM PROJECT
EXECUTION PLAN (BPEP)
2.4.2 AS-BUILT MODEL
2.4.3 AS-BUILT DRAWING
DOCUMENTATION IN
SOFTCOPY
2.4.4 AS-BUILT DRAWING
DOCUMENTATION IN
HARDCOPY
2.5 CONSULTANTS COMPANY PROFILE

III
CONTRACT DOCUMENT

PEMBINAAN MAKTAB RENDAH SAINS MARA (MRSM)


DUNGUN, TERENGGANU (REKA DAN BINA)

CONTRACT DOCUMENT

The Contract Document shall comprise of the following volumes and parts: -

VOLUME 1 of 3 CONTRACTUAL AND GENERAL REQUIREMENTS

VOLUME 2 of 3 GOVERNMENT TECHNICAL REQUIREMENTS

VOLUME 3 of 3 CONTRACTOR’S PROPOSAL

I
CONTRACT DOCUMENT

PEMBINAAN MAKTAB RENDAH SAINS MARA (MRSM)


DUNGUN, TERENGGANU (REKA DAN BINA)

TABLE OF CONTENT

PART DETAILS PAGE

VOLUME III of III CONTRACTOR’S PROPOSAL

PART 1.1 1.0 CONTRACTOR’S PROPOSAL FOR


ENVIRONMENTAL PROTECTION WORKS
(EWP)
1.1 ENVIRONMENTAL PROTECTION
WORKS (EWP) PROPOSAL
1.1.1 LAYOUT DRAWINGS
1.1.2 PROGAMME OF WORKS
1.1.3 SCHEDULE OF PRICES FOR THE
WORKS
1.1.4 PROPOSED ON NON-PHYSICAL
WORKS COMPLETE WITH COST
BREAKDOWN
1.1.5 PROPOSED ON PHYSICAL
WORKS COMPLETE WITH COST
BREAKDOWN
1.2 CURRICULUM VITAE OF
ENVIRONMENTAL CONSULTANT
(REGISTERED WITH DOE) OR
PREPARATION OF EMP
1.3 CURRICULUM OF INDEPENDENT
ENVIRONMENTAL AUDITOR
(REGISTERED WITH DOE) INCLUDING
COPY OF RELATED CERTIFICATE
1.4 NAME OF ACCREDITED
LABORATORIES INCLUDING
CURRICULUM VITAE
1.5 NAME OF ENVIRONMENTAL OFFICER
INCLUDING CURRICULUM VITAE
AND RELATED CERTIFICATE
2.0 MYCREST CONTRACTOR PROPOSAL
2.1 SCORING PLAN USING MYCREST
SCORECARD BASED ON 9 CRITERIAS
MYCREST DESIGN
2.1.1 PRE-DESIGN (PD)
2.1.2 INFRASTRUCTURE AND
SEQUESTRATION (IS)

II
CONTRACT DOCUMENT

2.1.3 ENERGY PERFORMANCE


IMPACT (EP)
2.1.4 OCCUPANT AND HEALTH (OH)
2.1.5 LOWERING THE EMBODIED
CARBON (EC)
2.1.6 WATER EFFICIENCY FACTOR
(WE)
2.1.7 SOCIAL AND CULTURAL
SUSTAINABILITY (SC)
2.1.8 DEMOLITION AND DISPOSAL
FACTORS (DP)
2.1.9 SUSTAINABLE AND CARBON
INITIATIVE (IN)

III
CONTRACT DOCUMENT

PEMBINAAN MAKTAB RENDAH SAINS MARA (MRSM)


DUNGUN, TERENGGANU (REKA DAN BINA)

CONTRACT DOCUMENT

The Contract Document shall comprise of the following volumes and parts: -

VOLUME 1 of 3 CONTRACTUAL AND GENERAL REQUIREMENTS

VOLUME 2 of 3 GOVERNMENT TECHNICAL REQUIREMENTS

VOLUME 3 of 3 CONTRACTOR’S PROPOSAL

I
CONTRACT DOCUMENT

PEMBINAAN MAKTAB RENDAH SAINS MARA (MRSM)


DUNGUN, TERENGGANU (REKA DAN BINA)

TABLE OF CONTENT

PART DETAILS PAGE

VOLUME III of III CONTRACTOR’S PROPOSAL

PART 6 1.0 CONCTRACTOR’S PROPOSAL FOR


ELECTRICAL WORKS
1.1 ELECTRICAL DESIGN BRIEF
1.1.1 MEDIUM VOLTAGE SYSTEM
1.1.2 LOW VOLTAGE SYSTEM
1.1.3 EXTRA LOW VOLTAGE
SYSTEM (ELV)
1.1.4 INTEGRATED BUILDING
MANAGEMENT SYSTEM FOR
ELECTRICAL
1.1.5 SERVICES
1.2 CATALOGUE AND BROCHURES
1.3 TENDER DRAWING
1.4 CONSULTANT COMPANY PROFILE
2.0 BIM CONTRACTOR PROPOSAL FOR
ELECTRICAL WORKS
2.1 TENDER PROPOSAL PHASE
2.1.1 OUTLINE OF BIM PROJECT
EXECUTION PLAN (BPEP)
2.1.2 DESIGN MODEL
2.1.3 SPATIAL ANALYSIS REPORT
2.1.4 TENDER DRAWINGS
DOCUMENTATION IN
SOFTCOPY
2.1.5 TENDER DRAWINGS
DOCUMENTATION IN
HARDCOPY
2.1.6 SAMPLE OF AS-BUILT MODEL
IN SOFTCOPY
2.2 DETAILED DESIGN PHASE
2.2.1 COORDINATED MODEL
2.3 CONSTRUCTION PHASE
2.3.1 UPDATING BIM PROJECT
EXECUTION PLAN (BPEP)
2.3.2 CONSTRUCTION MODEL
2.3.3 CONSTRUCTION DRAWING

II
CONTRACT DOCUMENT

DOCUMENTATION IN
SOFTCOPY
2.3.4 CONSTRUCTION DRAWING
DOCUMENTATION IN
HARDCOPY
2.3.5 COORDINATED MODEL
2.3.6 CONSTRUCTION SIMULATION
MODEL
2.4 CLOSE OUT PHASE
2.4.1 UPDATING BIM PROJECT
EXECUTION PLAN (BPEP)
2.4.2 AS-BUILT MODEL
2.4.3 AS-BUILT DRAWING
DOCUMENTATION IN
SOFTCOPY
2.4.4 AS-BUILT DRAWING
DOCUMENTATION IN
HARDCOPY
2.5 CONSULTANTS COMPANY PROFILE

III