Professional Documents
Culture Documents
Saic B 1001
Saic B 1001
00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Fire Proofing Pre-placement/ Site Preparation Inspection SAIC-B-1001 30-Apr-17 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAES-B-006
A5 All openings between fireproofing and substrate shall be fully sealed.
Sec. 8.1.4
Wire mesh for concrete fireproofing shall be 4"x 4"-10ga x 10ga or SASD
A6
2"x 2"- 14ga x 14ga shall be installed in preparation for fireproofing. AD-036711
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-B-006 -- Fireproofing for Plants, 20 November 2011
2- SASD-AD-036711 -- Concrete Fireproofing for Structural Members, 1 September 2000
3- SASD-AC-036404 -- Flame Impingement Shield for Flangeless Valves-- 31 Dec 1994
4- SASD-AC-036915 -- Details: Fireproofing Specifications for Columns and Vessel Skirts, 1 March 1999
30-Apr-17