GE Power

9HA.02 Technology Update

David Leach – Engineering Platform Manager, 9HA.02 Gas Turbine


Chris Vandervort– Product Manager, 9HA.02 Gas Turbine

January 9th, 2019


GE Power

© 2019, General Electric Company.


GE Proprietary Information - The information contained in this document is General Electric Company (GE) proprietary information. It is the
property of GE and shall not be used, disclosed to others or reproduced without the express written consent of GE, including, but without
limitation, in the creation, manufacture, development, or derivation of any repairs, modifications, spare parts, or configuration changes or to obtain
government or regulatory approval to do so, if consent is given for reproduction in whole or in part, this notice and the notice set forth on each
page of this document shall appear in any such reproduction in whole or in part. The information contained in this document may also be
controlled by the US export control laws. Unauthorized export or re-export is prohibited. This presentation and the information herein are provided
for information purposes only and are subject to change without notice. NO REPRESENTATION OR WARRANTY IS MADE OR IMPLIED AS TO ITS
COMPLETENESS, ACCURACY, OR FITNESS FOR ANY PARTICULAR PURPOSE.

All relative statements are with respect to GE technology unless otherwise noted.

2
ADVANCED MANUFACTURING WORKS
Advanced rapid
prototyping & TEST STAND
manufacturing
Replicates real-
innovation
world grid
environment at
full capacity

FSNL TEST STANDS


COMBUSTION TEST STAND

ENGINEERING CENTER
REPAIR DEVELOPMENT CENTER

GREENVILLE GT FACILITY
Advanced gas
turbine technology
development &
manufacturing
facility

• Constructed in 1968
• ~400 Acres Site
Welcome to • 1,500,000 M2

GREENVILLE •


3,200+ employees
85%+ products exported globally
>3,000 Gas Turbines shipped
• ~7k patents filed in past 10 yrs
, General
Copyright 2019 General Electric Company. GE Proprietary Electric
Information andCompany.
ConfidentialAll Rights Reserved.
Information. All Rights Reserved. No part of this 3
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company
Large product portfolio and proven installed base

9HA.02 557 MW 64+% net


9HA.01 446 CC eff.
9F.05 314
9F.04 288
9F.03 265
210
GT13E2
9E.04 145 +7000 Gas Turbines
9E.03 132
LMS100 117
6F.03 87
LM9000 75 +1600 GW
6F.01 57
LM6000 57
6B.03 44
34
LM2500
TM2500 34 +300M Operating Hours
7HA.02 384 MW
7HA.01 290
GE Delta vs.
7F.05 243
Fleet Industry
7F.04 198 (%) (% pts)
LMS100 117
7E.03 91
6F.03 87 Reliability 98.0 +0.9
LM9000 75
LM6000 57 Availability 91.2 +1.4
6F.01 57
6B.03 44 Start Reliability 98.2 +0.2
LM2500 36 Source: ORAP®. All rights to underlying data reserved: SPS ®.
TM2500 36 Modified by GE. Rolling 12-month data Jan 2017 – Dec 2017.

Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this 4
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company
HA Fleet Update
HA gas turbine platform evolution
Three generations of gas turbine technology
9H 9F.04/5 Product catalog Performance
7F.04/05
2003 2005 2012 GT Output 1x1 CC Output Eff; 1x1
Product (MW) (MW) CC, (%)
7HA.01 290 438 62.3
4-stage VGV DLN 14-stage compressor
4-stage turbine Advanced HGP 7HA.02 384 573 63.3
2.6+
9HA.01 446 660 63.5
9HA.02 557 826 64.0
>2.0M hrs >500K hrs
>300k hrs >1.4M hrs
Fuel & Operational Flexibility
Fuel Rich & Lean NG, #2 dist, ASL
7/9HA
2014 Startup Time (Hot) < 30 minutes (CC)
>170k hrs Turndown 25% GT base load

Note: Year denotes first operation


Ramp rate 15% GT MW/min

Over 15 years of operating experience with H-class technology


Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company
6
MAKING AN IMPAC T WITH THE HA GAS TURBINE

HA FLEET RUSSIA

83 Orders
KOREA
FRANCE CHINA
UNITED STATES
50 GW PAKISTAN JAPAN

BAHRAIN TAIWAN
MEXICO
BANGLADESH THAILAND
32 COD MALAYSIA
INDONESIA

BRAZIL
235K Hours
ARGENTINA
2 World Records

Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
77
document may be reproduced, transmitted,
© 2019, or stored
General Electric without the
Company. prior written
Proprietary permission ofAll
information. General
rightsElectric
reserved.Company
HA Fleet Status Report January 2019
7HA: 23 GTs
USA Project A France Pakistan Taiwan Korea
153,370 2x1 7HA.02 1x1 9HA.01 SS 2x1 9HA.01 2 7HA.02 SC 1x1 7HA.02
1735 COD: June 2017 COD: July 2016 COD: May 2018 CC COD: Sept 2017 COD: May 2018
Duty: Continuous Duty: Continuous Duty: Continuous Duty: Continuous Duty: CHP
Hours: 25435 Hours: 16593 Hours: 18974 Hours: 10789 Hours: 5476
Starts: 167 Starts: 249 Starts: 233 Starts: 174 Starts: 114
1067 2x1 7HA.02 2x1 9HA.01
82,146 COD: June 2017 Japan
COD: May 2018 CC Russia
9HA: 9 GTs Duty: Continuous Duty: Continuous 3x1 7HA.01
1x1 9HA.01 COD: Sept 2017
Hours: 21633 Hours: 14553 COD: June 2017 Duty: Continuous
Starts: 174 Starts: 239 Duty: CHP Hours: 28856
FLEET LEADERS: Hours: 12573 Starts: 233
9HA France 16593 Hours USA Project B 2x1 9HA.01 Starts: 102
COD: Jul 2018 CC 3x1 7HA.01
7HA USA Texas 12863 Hours (3) 1x1 7HA.02 USA Project E
Duty: Continuous COD: Mar 2018
COD: Dec 2018 (2) 1x1 7HA.02
Hours: 10800 Duty: Continuous
Duty: Continuous COD: Aug 2018
Starts: 223 Hours: 19169
Hours: 9475 Duty: Continuous
Starts: 187
Starts: 119 Hours: 7477
Starts: 125
1x1 9HA.01
USA Project C USA – Project D USA Project F
COD: Sept 2017
2x1 7HA.02 2x1 7HA.01 1x1 7HA.02
Duty: Continuous
COD: Apr 2018 COD: May 2018 COD: Jun 2018
Hours: 8653
Duty: Continuous Duty: Continuous Duty: Continuous
Starts: 21
Hours: 9161 Hours: 10913 Hours: 4986
Starts: 208 Starts: 180 Starts: 54

3 2 G a s Tu r b i n e s 235,516 Hours 2,802 Starts


Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company 8
Transforming the industry with the HA
GE's HA Technology for the best economics Growing & delivering

7HA.01/.02
7HA.01/.02
60Hz
60HZ 32 GTs operating
83 units ordered
9HA.01/.02
50Hz
235,500

• 64% net efficiency


• Reliability of air cooling
• Energy density and low emissions
• Validated performance, operability,
emissions & lifecycle capability

Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company 9
9HA02 Update
HA GAS TURBINE … BUILT ON PROVEN TECHNOLOGY

>550 MW GT
9HA.02 >800 MW CC
>64% CC NET

14-stage Advanced COMPRESSOR DLN2.6e COMBUSTOR 4-stage POWER TURBINE


 Introduced on 7F.05  Evolution of DLN2.6+  Originally introduced on steam cooled
 600k+ hrs of experience  10+ year development w/ > 1,000 hours of lab testing H in early 2000s
 80+ units in operation  Higher efficiency, deeper turndown, wider fuel flex..  Advanced cooling and sealing
 Fully validated in full-load test stand 50% H2; 100% LPG; ethane…Hydrogen “ready”  Simplified air cooled with no steam or
 Low emissions 15ppm NOx , deep turndown 10% - cold cooling air
100% GT Load.

Leading in Performance Leading in Operability Simplicity


MW & CC Efficiency Turndown & Ramp Rate Integrated Cooling & Simplified packaging

Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company 11
FASTER, SIMPLER CONSTRUCTION SCHEDULE
↓63% ↓55% ↓64% ↓98%
Field connections Field welds Electrical terminations Field installed valves

 Critical path installation cycle shortened 8 weeks


 Labor reduced 13,000 hours
 Up to 25% faster installation than F-class

Modular gas turbine approach – Simplifies site construction and unit maintenance
Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this 12
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company
9HA.02….. Flexibility Across the Mission Profile
Agility Robustness Capacity
MOVE THE ASSET QUICKLY SURVIVE EXTERNAL DISTURBANCES BOOST OUTPUT MANAGE TRADES
Power

Efficient Base Peak

Fast Automatic Response Grid


for Ancillary Markets Automatic Grid Control
Response Reconstruction
Mode
Off-Grid Islanding
Generator Breaker Closed

Conventional Time
Leading Tech

Fast Ramping & Partload Operation Fast & Reliable Start


Real-time, efficient response to minute changes Fast MWs when renewables ramp down

Low Turndown Baseload MW & Efficiency


Accommodate renewables, maintain reliability Lowers consumer cost and carbon footprint

When power on demand is more valuable than ever


Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company 13
9HA.02 FETT Hardware Photographs - Rotor Assembly

Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company 14
9HA.02 FETT Hardware Photographs - Stator Tube Assembly

Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company 15
Validation and fleet udpate
Technology validation of HA technology
7F.05 9HA.01 7HA.01 7HA.02 9HA.02
Construction (2008 – 2010)

DLN2.6+ Combustion Combustion DLN2.6e


AFS/Unibody AFS/Unibody
FSFL Test Facility

7F.05 7F.05 7HA.01 7HA.02 9HA.02


9HA.01 GT
CTV GT GT GT GT

• HIGH EFF 14 • FULL GT • CORE HA TECHNOLOGY • COMBUSTION AXIAL FUEL • FLOW SCALING • DLN2.6E
STAGE COMP VALIDATION • GROWTH CAPABILITY STAGING .. • AEROMECHANICS • 50 HZ SPEED SCALING
• 3D AIRFOILS • OUTAGE DURATIONS • GROWTH CAPABILITY TO • GROWTH CAPABILITY • AEROMECHANICS
• 4 VARIABLE 7HA.02 • GROWTH CAPABILITY
STAGES
• FIELD
REPLACEABLE
BLADES

Test 2Q 2019

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
50 Hz 60 Hz
First-of-a-kind validation facility to enable product progression and growth
First-of-a-kind validation facility to enable product progression and growth
Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company
17
9HA.02 Technology Validation – Structured Approach
Power Plant
Validation and Fleet
Leader
FSFL TS7
 Gas Turbine
Validation Test

 Sub-System
Module “Rig”
Testing
Component
Analysis &
Fleet Leader Validation
Testing • Integrated Combined Cycle Operability
FSFL TS7 GT Validation • Combined Cycle Performance
• Ignition /Start-up/Shutdown Operability • Plant Emissions
• Aeromechanics /Rotor dynamics • Rotor dynamics
• GT Thermal Validation • Prime Packaging
• Performance/combustion tuning • Grid Code
• Min. Emissions /Response Mode Tuning
• Extraction Valve Tuning Fleet Leader Inspections
Module Sub-System Rig Test • Grid Code Tuning  Inspections to look for early evidence
• Combustion Single Can Lab Test • Clearance Validation of time based failure mechanisms -
• Compressor Full Scale Test Rig • Heat Transfer and Flow Validation wear out / oxidation
Component Analysis • Turbine Scaled Aero Rig • Turbine Diffuser Performance  Demonstrate Maintainability &
• Component Analysis • Material Characterization • Liquid fuel operability / performance Inspection Durations.
• Fundamental Physics • Component HALT Testing
Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company 18
VALIDATED TECHNOLOGY … PERFORMANCE, OPERABILITY WITH RELIABILITY
Unparalleled Full Load Validation Field Experience
GE’s world class full scale gas turbine and Fleet leader inspection programs to improve
compressor validation facility reliability and serviceability

• Performance and emissions • Serviceability and outage duration


• Robust architecture • Future growth capability
• Operating flexibility • Fuel capability Fleet leader inspection program
• Replicates global grid environment • Full compressor mapping capability
- Frequent inspections and hardware analyses
>$300M GE investment Production Gas - Validates longer term part condition
Turbine
Load - Improvements for higher reliability
Compressor
Gear
box - Combined cycle system level optimization and
Torque
Drive converter commissioning
motor
Starter 50 meter
Power Train
motor

Advanced 7F.05 9HA.0 7HA.01 7HA.0 9HA.0


Compresso
r 1 2 2

2011 2012 2014 2015 2017 2019

Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company 19
HA plants provide the lowest

1 cost of electricity… largest


and most efficient

GE Power Technology leadership with the


committed to lead
into the next era of
2 7HA and 9HA platforms.
Setting world records in
50 & 60Hz.
power generation
GE is continuing to invest in
3 technology… additive
manufacturing, digital,
hybrid solutions

Copyright 2019 General Electric Company. GE Proprietary Information and Confidential Information. All Rights Reserved. No part of this 20
document may be reproduced, transmitted,
© 2018, or stored
General Electric without the
Company. prior written
Proprietary permission ofAll
information. General
rightsElectric
reserved.Company
THANK YOU!

This document is the confidential property of [GE Power], a division of General Electric Company.
No part of this document may be copied, distributed or reproduced in whole or in part,
nor disclosed
Copyright to any
2019 General Electric third
Company. partyInformation
GE Proprietary without the written
and Confidential permission
Information. ofNo[GE
All Rights Reserved. part ofPower].
this
document may be reproduced, transmitted, or stored without the prior written permission of General Electric Company

You might also like