KILN PIER READING MECHANICAL & CIVIL

BASE AS PER DUMPY


PIER AS PER CIVIL DRG
HEIGHT LEVEL READING

KP1 285 8183 8159

KP2 285 7801 7776

KP3 285 7192 7190

6244
16583
P
R
E
H
E TOP OF BASE FRAME
A TOP OF CIVIL
T
E
R
8460
K
P 8159 8042
K
1
P
9220 mm 2

16578

6197

1 KP3 to KP2 center Distance = 16142 mm

2 KP3 height 0 level to top of base frame height = 7477 mm

3 Kiln Slope = 3.5 %

16142 x 0.035 = 564.97


564.97 + 7477 = 8041.91 (KP2 top of base frame height)

4 Slope KP3 to KP2

KP2 - KP3 top of base frame height

8042 - 7477 = 565 mm

5 (A^2 + B^2)= C^2

565 ^2 + 16142^2 = 260883389

C^2 = 260883389

C= 16151.88 mm

1 KP1 to pre heater center Distance = 6197 mm

2 Pre heater height = 9220 mm

3 KP1 Top of base frame height = 8460 mm

Pre heater height - KP1 Top of base frame

9220-8460 = 760

Slope pre heater to KP1

4 (A^2 + B^2)= C^2

760 ^2 + 6197^2 =38980409

C^2 = 38980409

C= 6243.42 mm
BALANCE GAP IN
TOP OF BASE FRAME BETWEEN RCC TOP
CIVIL LEVEL ACC. TOB REMARK
AS PER MEC. TO BASE FRAME
BOTTOM

8460 8444 16
PLEASE
CONFRAM THE
8042 8061 -19 PACKING ?

7477 7475 2

16152

7776
7477 K 7190
P
3

16142

1 KP2 to KP1 center Distance = 16578 mm

2 KP2 height 0 level to top of base frame height = 8042 mm

3 Kiln Slope = 3.5 %

16578 x 0.035 = 580.23 mm


580.23 + 8042 = 8622.23 (KP1 top of base frame height)
Note:- fst tyre roller size difrent
4 Slope KP2 to KP1

KP1 - KP2 top of base frame height

8460 - 8042 = 418 mm

5 (A^2 + B^2)= C^2

418 ^2 + 16578^2 = 275004808

C^2 = 275004808

C= 16583.26 mm