Professional Documents
Culture Documents
DPWH-Davao City II
Package 18- Construction of MPB at 1) Brgy. Lacson, DEO Buildings/Industrial
15LH0018
Calinan Dist., 2) Brgy. Dacudao, Calinan Dist., Davao City 100 24/10/2015 24/10/2015 100 100 Plant-LOW rise 1.00 stories 7,344,953.00
Construction of Water System at Brgy. Alambre, Toril DPWH- Davao City II Flood Control/Hydraulic/
15LH0285
District, Davao City DEO Davao City 100 02/26/16 06/25/16 100 100 water supply 7427 lm 4,875,619.10
16LH0055
Construction of Hanging Bridge At Sitio Siao, Brgy. DPWH- Davao City II
100 7/4/2016 3/7/2016 100 100 Bridges- Const.- Steel 69.60 lm 6,791,400.00
Tamugan, Marilog District, Davao City DEO Davao City
Concreting of FMR from Junction Provincial Road to DPWH-Davao del Roads: Construction -
17LC0156 Purok 10, Brgy. Salvacion FMR, Brgy. Salvacion Sto. Norte, DEO
100 06/28/2017 11/17/2017 100 100
PCCP
1.49 km 11,580,213.02
Tomas Davao del Norte
Constructon of 3 Storey 9 Classrooms, Bago ES. DPWH- Davao City Building: Construction- w/o Piles-Low Rise-
17LB0321 Davao City DEO 100 03/22/2018 5/9/2018 Concrete (Frame) (1-5 Storeys) 3.00 storey 26,128.967.67
Construction of Revetment along Digos River Bridge DPWH - Davao del Flood Control: Const.-Slope Protection
18LD0021 1, Digos City. Davao del Sur Sur DEO 49 10/7/2018 10/9/2018 75.15 70.36 using Structural Measures ( Revetment) 300 lm 38,023,566.04
107,102,472.39
Submitted by: Date: July 08, 2019
KATTY M. LACABA TWO DEGREES CONSTRUCTION AND SUPPLY
General Manager Name of Bidder
Republic of the Philippines
KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROGRAM
Office of the Barangay Sub-Project Management Committee
Barangay Hall, Barangay Datu Balong
Municipality of San Isidro, Province of Davao del Norte
Contract Package No. : 1A
Name of the Sub-Project : Concreting of 150 LI.M Barangay Road
Location : Purok 1A, Brgy. Datu Balong, San Isidro, Davao del Norte
SLCC - ROAD
A. Single Largest Completed Contracts (SLCC)
Contract Date Percent
Participation Major Categories of Total as Built Cost
Contract ID Contract Name Owner Start Completion Dimension Per Major Work
% WA TE Work
mm/dd/yy mm/dd/yy Category
Submitted by:
KATTY M. LACABA
General Manager