Name: Name:
Scope (Description of work): REPLACEMENT OF TUBE BUNDLE OF (100-EA4-C3, C8) & 284-E52 & 810-E7 with new one.
Required and recommended PPEs: Safety Helmet, Safety Shoes, Coverall, Fire Extinguisher, Radio Sets, Lather glove, Life line, Gas mask,
Goggle. Full body harness
2. Shifting of scaffolding 1. Uninspected crane and 1. Cold work permit should be obtained.
material through crane at lifting tackles. 2. Inspected crane and lifting tackles to be used. DESCON/ PARCO
site. 2. Falling hazard. 3. Authorized crane operator to operate the crane. Process
3. Unaided crane movement 4. Barricade the working area with caution tape.
5. Trained banks man must be guided the crane.
3. Erection of scaffolding. 1. Pinch point 1. PTW procedure to be followed.
2. Tool may slip. 2. All person involved in the job will use cotton gloves, Helmet, safety
3. Falling hazards harness, spectacles and safety shoes. DESCON HSE/
4. Unauthorized access. 3. Trained Scaffolder will perform the job under the supervision of EXECUTION
supervisor.
4. Use tool lane yard during erection of scaffolding.
5. Wear full body harness while working at height for erection of
scaffolding at Fin fan cooler.
6. Nobody can do any type of job under the working area during
scaffolding erection.
7. Scaffolding should be erected according to OSHA checklist.