Water Sewage peak load Discharge for
Bldg requireme Sewage discharge Total Cu. Q
requirement discharge factor 50% pipe filling Slope Dia
nt discharge provided
Liters / day m3 / day m3 / hr m3 / min m3 / min
m3/min mm m3/min
PHASE 1 Block D,D',C,Amenity 5,plot 5,Block A,Block B
PHASE 3 Block H,J,PLOT 4,GALA 2,GALA 3,BLOCK K,K'L.L' 31110 lits 31907.5
1595
PHASE 4 Amenity 1,2,3,4,gala 4,5,6,block N,N',M,M',P 36726 37523.5
Pumping lines: