External sewage design:

Water
Water Sewage peak load Discharge for
Bldg requireme Sewage discharge Total Cu. Q
requirement discharge factor 50% pipe filling Slope Dia
nt discharge provided
Liters / day m3 / day m3 / hr m3 / min m3 / min
m3/min mm m3/min
PHASE 1 Block D,D',C,Amenity 5,plot 5,Block A,Block B

34281 34.281 1.71405 3 0.0857025 0.171405 0.17 150 160 0.665

PHASE 2 Gala1,Block F,G,g'plot 3,Block E

16340 16.34 0.817 3 0.04085 0.0817 0.08 150 160 0.665

PHASE 3 Block H,J,PLOT 4,GALA 2,GALA 3,BLOCK K,K'L.L'

31907.5 31.91 1.595375 3 0.07976875 0.1595375 0.16 150 160 0.665

PHASE 4 Amenity 1,2,3,4,gala 4,5,6,block N,N',M,M',P

37523.5 37.52 1.876175 3 0.09380875 0.1876175 0.19 150 160 0.665

1 day dom Add for driver/visitor

PHASE 1 Block D,D',C,Amenity 5,plot 5,Block A,Block B 32997 lits 34281


2568

PHASE 2 Gala1,Block F,G,G'plot 3,Block E 15056 lits 16340

PHASE 3 Block H,J,PLOT 4,GALA 2,GALA 3,BLOCK K,K'L.L' 31110 lits 31907.5
1595
PHASE 4 Amenity 1,2,3,4,gala 4,5,6,block N,N',M,M',P 36726 37523.5

Pumping lines:

Flow pipe dia. velocity Remarks


lpm mm m/s

Sump 1 200 65 1.2

Sump 2 160 65 0.97 As velocities are within


gravity line range of 0.7
Sump 3 160 65 0.97 to 3 m/s we do not
have to do any
Sump 4 243 80 0.95 additional measure for
the pumping mains line
Sump 5 205 65 1.25 discharging in to
gravity sewer.
Sump 6 364 80 1.4

Sump 7 630 100 1.4