1. SCOPE
This Calibration Control Procedure is applicable to the examination and calibration of
welding machines. The examination calibration and validation of the welding machines
shall be performed as per Calibration Schedule.
2. SEQUENCE OF PROCESS:
b. The validation accuracies and acceptance criteria shall be as per clause 4, Table 1 of BS
EN 50504.
c. Remove the power supply and clean the welding machine properly before testing.
d. Ensure that, the welding cables and electric cables are free from any defect.
e. Ensure that, the Current and voltage reading gauges are clear and free from damage.
l. Start welding, clamp the meter on wire and note down the reading.
m. Change selector switch positions for other ampere/voltage ranges and note down the
readings.
p. The equipment is the categorized under pas / fail criteria as per validation results