You are on page 1of 2

U.G.

TANK
DATA
1 Ht Of wall = 3.7 m L=
2 Width Of wall = 0.225 m B=
3 Density of Concrete = 2.5 T/m 3
proj=
4 Density of Soil = 1.8 T/m 3
Ht of G.L.=
5 Sump Dimensions L B D
3 0.6 1.50

Sr Element L B D Weight
1 Bottom Slab 19.5 6.45 0.25 78.60938
2 Top Slab 19.5 6.45 0.175 55.02656
3 Plum Concrete 19 6 0.37 101.23
4 Wall 70 0.225 3.7 145.6875
5 Soil on projection 51.9 0.3 3.1 86.8806
6 Dead wt of soil on top slab 0
7 Reduction due to sump 3 0.6 1.5 6.75
TOTAL (DOWNWARD) 460.69

UPWARD = 439.2855

DIFF = 21.40
19.5 m
6.45 m
0.3 m
3.1 m

You might also like