This document outlines the technical requirements for bids to operate sewage treatment plants (STPs) and interception and diversion works. It specifies that the technical section of bids should include:
1. Details of proposed plant, equipment, materials and their suppliers.
2. An operations work plan outlining how the bidder will operate the STP and sewerage pumping station to meet technical standards.
3. Plans for implementing and monitoring the environmental management plan at the STP and works sites.
4. A staffing plan with charts of all operator positions, roles, durations, and locations, as well as summaries of qualifications for key staff.
This document outlines the technical requirements for bids to operate sewage treatment plants (STPs) and interception and diversion works. It specifies that the technical section of bids should include:
1. Details of proposed plant, equipment, materials and their suppliers.
2. An operations work plan outlining how the bidder will operate the STP and sewerage pumping station to meet technical standards.
3. Plans for implementing and monitoring the environmental management plan at the STP and works sites.
4. A staffing plan with charts of all operator positions, roles, durations, and locations, as well as summaries of qualifications for key staff.
This document outlines the technical requirements for bids to operate sewage treatment plants (STPs) and interception and diversion works. It specifies that the technical section of bids should include:
1. Details of proposed plant, equipment, materials and their suppliers.
2. An operations work plan outlining how the bidder will operate the STP and sewerage pumping station to meet technical standards.
3. Plans for implementing and monitoring the environmental management plan at the STP and works sites.
4. A staffing plan with charts of all operator positions, roles, durations, and locations, as well as summaries of qualifications for key staff.
pumping sewage up to the installed capacity, estimated power factor, any
proposals for improving efficiency in terms of lower power consumption
h. For Both STP and Interception & Diversion Works: Part-I of the Technical Section of the Bid shall further consist of the following sub-parts in the following order: 1. a section entitled ―Plant and Equipment and Operator‘s Equipment‖ which consists of a list of proposed suppliers of major Plant and Equipment and Operator‘s Equipment (Design-Build) and Operator‘s Equipment (Operations), including: i. plant and equipment; ii. materials including pipe work and principal construction materials. For all items listed in ITB Section 3.3(h)(1), the Bidders shall provide either catalogues or detailed information with respect to manufacturer and source, model Designation, primary specifications, and year of manufacture, as applicable. 2. a detailed work plan (the ―Operations Work Plan‖) setting out the manner in which the Bidder proposes to carry out the operation of the STP and Sewerage Pumping Station as set out in the Contract (the ―Operations Services‖) and meet the operating technical standards in accordance with the Technical Standards Schedule to the General Conditions. The Operations Work Plan shall contain a section entitled ―Operation and Maintenance Plan‖ which provides an outline contents and overview of the Bidder‘s proposed plans and programs for Operations and Maintenance of STP and Interception & Diversion Works; 3. a detailed description of the Bidder‘s plans and methodologies to ensure that the requirements of the applicable Environmental Management Plan specified in the special conditions of contract for the proposed STP, Interception & Diversion Works and allied services at Site will be implemented and monitored; 4. a detailed staffing plan (the ―Staffing Plan‖) setting out the Bidder‘s proposed staffing arrangements for the carrying out of the Design-Build and Operations Services. The Staffing Plan shall be divided into the following sections: i. two sub-sections, (one for the Design-Build Services and one for the Operations Services) each entitled the ―Staffing Chart‖ and each consisting of a chart setting out a list of all proposed Operator‘s Personnel positions, the role of each position, the duration of existence of the position, and the location of the staff person filling the position during the periods of assignment to carry out the Design-Build and Operations Services; ii. a section entitled ―Summary of Staff Qualifications‖ which consists of a summary table setting out, a. for the Key Staff positions, the names of the Bidder‘s employees who will occupy the Key Staff positions during Design-Build Services; and b. all proposed positions for the Operator‘s Key Personnel and the qualifications, years of experience and areas of expertise, including a Page 23 of 490