Reasoned Documents on Draft Specification IRS:S 88/2004 Version 1.0 for Low Maintenance Lead Acid Secondary Cells.

Existing Cl. Description of IRS:S:88/04 Ver.1 Remarks of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
of IRS : S:88 Minutes of
/04 Ver.1 meetings

0.2 This specification require reference to This specification require reference to the following
the following Indian Standards (IS), Indian Standards (IS), and Indian Railway Standards (IRS)
and Indian Railway Standards(IRS). and RDSO specification.
IS/IRS/RDSO Spec. Specification Description
IS: Specification for Stationary Reference IS: 1651-1991 2013 Specification for Stationary cells Clause updated as per latest IS
1651- cells and batteries, Lead spec shall and batteries, Lead-acid type (with spec.
1991 acid type (with tubular be IS:1651: tubular positive plates).
positive plates). 2013
IS: Hard rubber and plastic -- IS: 1146-1984 1981 Hard Rubber and plastics Updated as per available IS
1146- containers for Lead-acid containers for Lead-acid storage spec. Description amended
1984 batteries. batteries. as per IS : 1146 1981.
IRS: S Electrical Signalling & -- IRS: S 23 Electrical and Electronic based Description amended as per
23 Interlocking Equipment. Signalling & Interlocking spec IRS: S 23.
Equipment.
IS:1069- Specification for Water for -- IS:1069-1993 Quality tolerances Specification Description amended as per
1993 storage batteries. for Water for storage batteries. spec. IS:1069-1993.
New -- IS:4905-19682015 Random Sampling and IS: 4905-2015 is referred in
Randomization Procedures. Annexure –A Cl. No. A. 1.2 of
IRS: S:88 Ver 1.0 spec. But was
not covered in referred Cl. 0.2
of the spec.
New -- IS: 8320-2000 General requirements and New reference may be
methods of tests for Lead-acid added in line with Cl. No.
storage batteries 11.4.1 of IS:1651: 2013
New -- RDSO Spec No. LMLA batteries for 110V train- PS & EMU Dte. Specification
RDSO/PE /SPEC / lighting and air conditionined SG of RDSO may be added as
AC /0058-2005 coaches. some clauses incorporated
(Rev.-0) in line with the spec.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 1 of 13


Existing Cl. of Description of IRS:S:88/04 Ver.1 Remarks of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
IRS:S:88/04 Minutes of
Ver.1 meetings
0.5 For the purpose of this specification, Reference For the purpose of this specification, the terminology Updated as per latest IS
the terminology given in IRS: S 23 specification shall given in IRS: S 23 wherever applicable and IS: 1651-91 spec.
wherever applicable and IS: 1651-91 be IS:1651:2013 2013 shall apply.
shall apply.

2.2 The cell / Battery shall be designated Reference The cell / Battery shall be designated as per clause Updated as per latest IS
as per clause 4.2 of IS: 1651-91 specification shall 4.2 of IS: 1651-91 2013 followed by LM for indicating spec.
followed by LM for indicating low be IS:1651:2013 low maintenance character of the batteries.
maintenance character of the
batteries.

3.2 The positive plate shall be tubular. The positive plate The positive plate shall be tubular. The negative plate Incorporated as per
The negative plate shall be pasted shall be tubular. shall be pasted type of lead alloy. The positive and minutes of meeting and
type of lead alloy. The positive and The negative plate negative plate shall have antimony content less than previous final draft spec.
negative plate shall have antimony shall be pasted 3% & the negative plate shall have antimony content To minimize water
content less than 3% with suitable type of lead alloy. less than 3% 2% with suitable ingredients in grid to transfer and water loss
ingredients in grid to minimise The positive plate minimise antimony water transfer and water loss during charging. Design is
antimony transfer and water loss shall have during charging. vendor specific.
during charging. antimony content
less than 3% & the
negative plate shall
have antimony
content less than
2% to minimise
water transfer and
water loss during
charging.
3.2.1 Separator shall be micro porous Agreed (PE may be Separator shall be micro porous rubber, PE, PVC or PE separator will improve
rubber, PVC or any other material included) Rubber any other material conforming to IS: 6071-1986. The the porosity. PE
conforming to IS: 6071-1986. The may be deleted. volume porosity shall be not less than 35%. separator is being used
volume porosity shall be not less than for Train lighting/AC
35%. coach.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 2 of 13


Existing Cl. of Description of IRS:S:88/04 Ver.1 Remarks of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
IRS:S:88/04 Minutes of
Ver.1 meetings
3.3.1 The electrolyte height at the top of the separator Already The electrolyte height at the top of the May be modified.
shall be 40mm (minimum) to achieve low covered, separator shall be 40mm (minimum) in fully Already exists in previous
maintenance features for batteries above 120AH. No change topped up condition to achieve low final draft spec.
maintenance features for batteries above
120AH.
3.3.2 -- -- Electrolyte shall be prepared from battery New clause may be
(New Clause) grade sulphuric acid conforming to IS 266- added in line with Power
1993 with latest amendment. Supply and EMU Dte. Cl.
No. 3.6 of RDSO Spec No.
RDSO/PE/SPEC/AC/0058-
2005 (Rev.-0).
Standardization of
preparation of
electrolyte is ensured.
3.4 The dimensions of the 2V cell of various capacities -- The dimensions of the 2V cell of various Updated as per latest IS
shall be in accordance with table 1 of Clause 7.1 of IS: capacities shall be in accordance with table 1 spec.
1651 and that of monoblock cells shall be in of Clause 7.1 of IS: 1651-2013 and that of
accordance with the relevant IS specification. monoblock cells shall be in accordance with
the relevant IS specification.
3.5.1 Vent plugs shall be placed and secured in position to -- Vent plugs shall be placed and secured in Typographical error.
minimise loss of water/acid by carry over and position to minimise loss of water/acid by
evaporation. The vent plug shall be of ceramic or any carry over and evaporation. The vent plug
other suitable fire retardant material. The vent plug shall be of ceramic or any other suitable fire
shall allow free movement of gases evolved during retardant material. The vent plug shall allow
service and shall not permit electrolyte to come out free movement of gases evolved during
of the surface of lid. On Removal of vent plug for service and shall not permit electrolyte to
drawing of the electrolyte sample, servicing and come out of the surface of lid. On Removal of
checking of electrolyte shall be possible. vent plug for drawing of the electrolyte
sample, servicing and checking of electrolyte
shall be possible.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 3 of 13


Existing Cl. of Description of IRS:S:88/04 Remarks of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
IRS:S:88/04 Ver.1 Minutes of
Ver.1 meetings
3.6 Sealing Compound -- Sealing Condition Sealing for PPCP
Sealing compound, if bitumen Sealing compound, if bitumen based, shall conform to IS: container specified &
based, shall conform to IS: 3116-1965 with latest amendments. incorporated.
3116-1965 with latest For PPCP Container Battery: In PPCP container 100% leak proof
amendments. nature of heat seal shall be provided.
3.10 Nuts and Bolts Shall be of Nuts and Bolts Not agree with the firm.
Bolts and nuts for connecting stainless/MS Bolts and nuts for connecting the cells, shall be made of Specification for lead
the cells, shall be made of with lead copper / brass and shall be effectively lead coated to prevent coating along with
copper / brass and shall be coating. corrosion. The lead coating shall be in accordance with BIS thickness of lead coating
effectively lead coated to Copper/Brass 6848 -1979 latest issue (lead coating shall not be less than specified.
prevent corrosion. may be deleted. 0.025mm).
3.11 General Requirements for PPCP Container Battery : Add for PPCP container
(New Clause)
3.11.1 The container shall be Polypropylene co-polymer (PPCP) Test added in line with
(New Clause) translucent containers and shall conform to these tests as per Power Supply and EMU
clause no. 7 of IS: 1146/1981. Dte. Cl. No. 3.4.1.4 – (4.0)
1. Verification of constructional requirements of Spec No. RDSO/PE/
2. Verification of marking SPEC /AC /0058-2005
3. High Voltage test (Rev.-0) and Cl 3.1.1 in
4. Drop ball test previous final draft spec.
5. Izod impact test now shifted at Cl. 3.11.1 .
6. Plastic yield test
7. Acid resistance test
3.11.2 -- -- Outer Wall Thickness of Container without ribs is 3.5 mm to New clause added in line
(New Clause) 6.5 mm. with Power Supply and
The outer wall thickness shall be measured on all the sides of EMU Dte. Cl. No. 3.4.1.4
the container i.e. longer side, shorter side and base. However, of RDSO Spec No. RDSO/
the minimum wall thickness of container / lid shall not be less PE/ SPEC/AC/ 0058-2005
than 3.0 mm, if design of the container / lid with strengthening (Rev.-0)
members / ribs which may be provided inside and / or outside
of the container / lid.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 4 of 13


Existing Cl. Description of IRS:S:88/04 Ver.1 Remarks of Minutes of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
of IRS:S:88 meetings
/04 Ver.1
3.11.3 -- -- Partition wall thickness is 2.2 mm to 2.8 mm -do-
(New
Clause)
3.11.4 -- -- Provision of Handle on Cells / Batteries -do-
(New Moulded / rope handle shall be provided on the
Clause) container of cells / batteries. The handle
arrangement shall not be provided on the lid. Either
moulded or rope handle is acceptable on container.
4.1 Marking Accepted, may be modified as:- Marking Incorporated as
per minutes of
The following information shall The following information shall The following information shall be indelibly and meeting.
be indelibly and durably marked be indelibly and durably durably marked / screen printed on the outside of the
on the outside of the cell. marked / screen printed on each battery/cell.
outside of each battery/cell.
a) Manufacturer’s type and a) Manufacturer’s type name and trade name
trade name followed by LM a) Manufacturer’s type and followed by LM indicating the low maintenance
indicating the low trade name followed by LM feature.
maintenance feature. indicating the low b) AH capacity of the battery at 10 hours rate.
b) AH capacity at 10 hours rate. maintenance feature. c) Upper and lower electrolyte level in case of
c) Upper and lower electrolyte b) AH capacity of the battery transparent container.
level in case of transparent at 10 hours rate. d) Months & Year of manufacture.
container. c) Months & Year of e) Serial no. of battery/cell.
d) Year of manufacture. manufacture.
e) Serial no. of battery/cell. (Note: Sticker not permitted on cells)
4.1.1 A yellow band of 25 mm width Agreed (May be deleted) A yellow band of 25 mm width shall be provided on Clause 4.1.1
shall be provided on both sides both sides along with the width of the cell for easy may be deleted
along with the width of the cell identification of Low maintenance batteries. as per minutes
for easy identification of Low of meeting.
maintenance batteries. Specification is
only for LMLA
cell only.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 5 of 13


Existing Cl. Description of IRS:S:88/04 Remarks of Minutes of meetings Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
of IRS:S:88 Ver.1
/04 Ver.1
5 INSTRUCTION & -- INSTRUCTION & MAINTENTEANCE Corrected, Typographical
MAINTENTEANCE MANUAL MANUAL error in IRS:S:88/04 Ver.1

6.2 The battery /cell shall have Accepted, may be modified as:- Unless otherwise specified under various Incorporated as per minutes
capacity not less than the Unless otherwise specified under tests or in the individual specification, the of meeting and previous
declared capacity at C10 rate various tests or in the individual temperature for tests shall be between final draft spec. Temp was
to end voltage 1.85 Volts per specification, the temperature for 20oC and 35oC. The battery /cell shall kept between 20oC and 30oC
cell. tests shall be between 20oC and have capacity not less than the declared as per old IS. In latest IS:
30oC. The battery /cell shall have rated capacity at C10 rate to end voltage 8320-2000 temp. is between
capacity not less than the rated 1.85 Volts per cell. 20oC and 35oC (IS: 8320-
capacity C10 rate to end voltage 2000, Cl. No. 11.1)
1.85 Volts per cell.

6.3 The batteries shall be supplied Agreed, May be corrected. The batteries shall be supplied dry and Incorporated as per minutes
dry and uncharged. Ampere Hour Efficiency as per Cl. uncharged. The Ampere-hour efficiency of meeting and previous
The Ampere-hour efficiency 12.9 of IS 1651-2013 shall not be measured as per Clause 12.9 of IS: 1651- final draft spec . Updated as
measured as per Clause 12.9 less than 92%. 912013 shall not be less than 95% 92%. per Cl. No. 12.9.1.1 of latest
of IS: 1651-91 shall not be less IS: 1651 2013 spec.
than 95% .
7.1.1.1 -- -- Additional Tests Required for PPCP It may be kept in type test in
(New container shall be as per cl. No. 7.1.2 (b). line with Power Supply. In
Clause) view of remarks given in cl.
No. 3.11.1 above.

7.1.2 -- -- 7.1.2 (a) Re-numbered

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 6 of 13


Existing Cl. Description of IRS:S:88/04 Ver.1 Remarks of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
of IRS:S:88 Minutes of
/04 Ver.1 meetings
7.1.2 (b) -- -- Additional Tests Required for PPCP container (i) As per above remarks given
(New (i) Polypropylene co-polymer (PPCP) containers for S. No. 7.1.1.1 &
Clause) shall conform to the tests as per clause no. 3.11 (ii) It may be kept in type test in
of this specification. line with Power Supply and EMU
(iii) Test for Material And Component Verification Dte. Cl. No. 5.22 and 5.4.2 (o)
shall be carried out as per clause no. 7.17 of this of Spec No. RDSO /PE/ SPEC
specification. /AC /0058-2005 (Rev.-0).
7.1.3 The manufacturer shall submit The manufacturer shall submit two sets of drawings May be modified.
two sets of drawing in A4 size of components of battery in A4 size as per clause 9
listed below for approval while of this specification listed below for approval while
offering the cell for type testing. offering the cell for type testing.
7.1.4 Acceptance test -- Acceptance test Drop ball test may be kept in
The following shall constitute The following shall constitute the acceptance tests: acceptance test for PPCP
the acceptance tests: a) Verification of marking and packing Cl. 7.3 container in line with Cl. 5.5.5.1
a) Verification of marking and b) Verification of dimensions Cl. 7.4 (c) of Spec No. RDSO /PE/ SPEC
packing Cl. 7.3 c) Test for capacity Cl. 7.5 /AC /0058-2005 (Rev.-0).
b) Verification of dimensions d) Air pressure test Cl. 7.15
Cl. 7.4 e) Drop Ball test Cl. 7.16
c) Test for capacity Cl. 7.5
d) Air pressure test Cl. 7.15
7.1.5 -- -- Routine test Routine test as new clause may
(New The following shall constitute the routine tests: be added, in compliance to
Clause) a) Verification of marking and Cl. 7.3 Vigilance Cell, RDSO’s note no.
packing 13/Vig/Policy dtd. 03.12.16.
b) Verification of dimensions Cl. 7.4
c) Test for capacity Cl. 7.5
d) Air pressure test Cl. 7.15
e) Drop Ball test Cl. 7.16

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 7 of 13


Existing Cl. Description of IRS:S:88/04 Ver.1 Remarks of Minutes Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
of IRS:S: 88 of meetings
/04 Ver.1
7.4 Verification of dimensions: -- Verification of dimensions: Updated as per latest IS
The overall dimensions of cells of standard The overall dimensions of cells of standard spec.
capacities shall conform to the capacities shall conform to the requirements
requirements given in table 1 clause 7.1 of given in table 1 clause 7.1 of IS: 1651-912013
IS: 1651-91 for 2V cells. for 2V cells.
7.5 Test for capacity: -- Test for capacity: Updated as per latest IS
This shall be carried out as per clause 12.5 spec. Mentioning No. of
of IS: 1651-91 on all the 7 samples. This shall be carried out as per clause 12.5 of sample may create
IS: 1651-912013. on all the 7 six samples. confusion as the same
clause is referred for
acceptance test (Cl. 7.1.4
(c) of spec.
7.6 Tests for loss of capacity on storage: -- Tests for loss of capacity on storage: Updated as per latest IS
The test shall be carried out as per clause spec.
12.7 of IS: 1651-91. The loss of capacity The test shall be carried out as per clause 12.7
thus measured shall not be more than 5%. of IS: 1651-912013. The loss of capacity thus
It shall be done on 2 cells. measured shall not be more than 5%. It shall
be done on 2 cells.
7.7 Endurance test: -- Endurance test: Updated as per latest IS
spec.
The test shall be carried out as per clause The test shall be carried out as per clause 12.8
12.8 of IS: 1651-91 and shall meet the of IS: 1651-912013 and shall meet the
requirements brought out in clause 12.8.4 requirements brought out in clause 12.8.4 of
of IS: 1651. It shall be done on 2 cells. IS: 1651-2013. It shall be done on 2 cells.
7.8 Ampere hour and Watt hour efficiency Agreed, May be Ampere hour and Watt hour efficiency test: Remarks given at Cl. 6.3
test: corrected. above
Ampere Hour The test shall be carried out as per Clause 12.9
The test shall be carried out as per Clause Efficiency as per cl. of IS: 1651-912013 and the AH efficiency shall
12.9 of IS: 1651-91 and the AH efficiency 12.9 of IS 1651-2013 not be less than 95% 92% and the watt hour
shall not be less than 95% and the watt shall not be less efficiency shall not be less than 75%. It shall be
hour efficiency shall not be less than 75%. It than 92%. done on 2 cells.
shall be done on 2 cells.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 8 of 13


Existing Cl. Description of IRS:S:88/04 Ver.1 Remarks of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
of IRS:S:88 Minutes of
/04 Ver.1 meetings
7.9 Test for Voltage during discharge: -- Test for Voltage during discharge: Updated as per
latest IS spec.
The test shall be carried out as per clause The test shall be carried out as per clause 12.10 of IS:
12.10 of IS: 1651-91 and samples shall meet 1651-912013 and samples shall meet the
the requirements brought out in clause requirements brought out in clause 12.10.1 of IS:
12.10.1 of IS: 1651-91. It shall be done on 2 1651-912013. It shall be done on 2 cells.
cells.
7.10.3 Every 50th discharge after initial 350 cycles -- Every 50th discharge after initial 350 cycles shall consist Updated as per
shall consist of a discharge at the 10 hour of a discharge at the 10 hour rate in accordance with latest IS spec.
rate in accordance with provisions of IS: provisions of IS: 1651-912013. Prior to each tests
1651-91. Prior to each tests discharge, an discharge, an equalizing charge shall be given and the
equalizing charge shall be given and the specific gravity of the electrolyte of all the cells
specific gravity of the electrolyte of all the adjusted in accordance with the specified value. The
cells adjusted in accordance with the discharge shall be followed by a recharge at the
specified value. The discharge shall be normal charging rate specified by the manufacturer.
followed by a recharge at the normal
charging rate specified by the manufacturer.
7.11.2 The capacity after 24 months, when tested as -- The capacity after 24 months, when tested as above Already
above shall be not less than ± 3% of the shall be not less than ± 3% of the obtained rated incorporated in
obtained capacity. capacity. previous draft spec.
Battery under this
test has not
undergone capacity
test. Hence cannot
be compared with
obtained capacity.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 9 of 13


Existing Cl. Description of IRS:S:88/04 Ver.1 Remarks of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s
of IRS:S:88 Minutes of Remarks
/04 Ver.1 meetings
7.12 Loss of Water Test Agreed as: Loss of Water Test Incorporat-
After fully charging the cell, it should be The water After fully charging the cell, it should be cleaned and dried. It should ed as per
cleaned and dried. It should be weighed loss shall be weighed immediately but not exceeding one hour after drying minutes of
immediately but not exceeding one hour not exceed with an accuracy of 0.05% or maximum least count of 50 gm for the meeting.
after drying with an accuracy of 0.05% or 0.7-gm/Ah/ balance used. Then all vent cum-filling plugs should be closed tightly Also,
maximum least count of 50 gm for the cell of the and connected to constant voltage charger keeping the voltage 2.4 ± modified in
balance used. Then all vent cum-filling plugs obtained 0.05V per cell for 21 days in water bath at the temperature of 50 ± 2 line with Cl.
should be closed tightly and connected to capacity as deg. C. Thereafter cell is removed from circuit and dried. After this it No. 12.11
constant voltage charger keeping the voltage achieved is weighed accurately. of IS 1651:
2.4 ± 0.05V per cell for 21 days in water bathduring the 2013.
at the temperature of 50 ± 2 deg. C. capacity The water loss shall not exceed 0.7-gm/Ah/ cell of the rated
Thereafter cell is removed from circuit and test as per obtained capacity as achieved during the capacity test as per Cl. No.
dried. After this it is weighed accurately. Cl. No. 7.5 7.5 of the spec.
The water loss shall not exceed 0.7-gm/Ah/ of the spec.
cell of the rated capacity.
7.15 Air pressure test: Agreed a) Air pressure test shall be conducted on at least two samples. Incorporat-
Sealing of each cell of the battery shall be checked by compressed air ed as per
a) Air pressure test shall be conducted May be at pressure equal to 700-mm height of water column. minutes of
on at least two samples. Sealing of each incorporat b) Requirement – The air pressure shall not fall below 670 mm of meeting
cell of the battery shall be checked by ed in line water column in 15 seconds after the air supplied to the cell is and in line
compressed air at pressure equal to 700- with spec. disconnected. with Cl.
mm height of water column. of other No. 5.15 of
b) Requirement – The air pressure shall directorate c) Air Pressure test for PPCP container battery: RDSO Spec
not fall below 670 mm of water column in of RDSO To check the leakage and sealing strength in PPCP cell / batteries No. RDSO
15 seconds after the air supplied to the for the compressed air at the pressure of 5 psi shall be applied for 1 minutes /PE/ SPEC
cell is disconnected. similar during type testing. The cell lid shall not show any visible sign of /AC/0058-
item. movement due to the air pressure and drop in pressure due to 2005 (Rev.-
leakage. 0)

Note: This test shall be carried out on unfilled cells. This leak test
shall be done on 100% cell / mono blocks of PPCP at the pressure of
4-5 psi for 15 seconds as routine test by manufacturers.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 10 of 13


Existing Cl. Description of IRS:S:88/04 Ver.1 Remarks of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
of Minutes of
IRS:S:88/04 meetings
Ver.1
7.16 (New Drop Ball Test for PPCP container battery: Drop ball test may be
Clause) kept in acceptance
(a) For the drop ball test the minimum height from test for PPCP
which the ball, with procedure as defined in IS: container in line with
1146-1981, when dropped which causes the Cl. 5.5.5.1 (c) of Spec
fracture, shall not be less than 400 mm (min. one No. RDSO /PE/ SPEC
time drop) for each side before and after High /AC /0058-2005
voltage test. The design will provide for adequate (Rev.-0) except
safety margins for achieving the required strength sampling. In Electrical
so that containers do not bulge / crack during Dte. Spec. It is 05
service. samples. Here, 02
(b) Checking of container strength on assembled samples have been
battery shall be done by dropping a ball as per specified in
clause 7.6 IS: 1146-1981. The container should pass consonance of
as defined in para 7.16 (a) above. This test shall be sampling plan (Min-
conducted on two nos. of assembled batteries for 02 samples –
each lot. Annexure-A)

7.17 (New -- -- Material And Component Verification Test for PPCP New clause added in
Clause) container battery:- line with Cl. No. 5.22
of RDSO Spec No.
The cell/battery shall be examined in the dismantled RDSO/ PE / SPEC /AC
condition to see that the manufacturing is as per /0058-2005 (Rev.-0).
approved outline and assembly drawing and the various
components are conforming to the specification as
detailed in the specification.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 11 of 13


Existing Cl. Description of IRS:S:88/04 Ver.1 Remarks of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
of Minutes of
IRS:S:88/04 meetings
Ver.1
8 MAINTENANCE TOOLS AND No change MAINTENANCE TOOLS AND INSTRUCTIONS Already incorporated
INSTRUCTIONS in previous draft
A wall mounting type "Tool Board" of suitable material spec. & also
A wall mounting type "Tool Board" of and protected against acid fumes shall be supplied along modified.
suitable material and protected against with set of 12 nos. each battery as per requirement of
acid fumes shall be supplied along with set the Railways. Railway to specify the quantity. The tool
of 12 nos. each battery. The tool board board shall comprises:
shall comprises:
iii) One cell- testing-voltmeter, 0-3 V of -- iii) One cell- testing-voltmeter, 0-3 V of accuracy, class Replaced by Digital
accuracy, class 0.5 in accordance with IS: 0.5 in accordance with IS: 1248-1968. The resistance of Multimeter as it has
1248-1968. The resistance of the Voltmeter the Voltmeter shall be 1000 ohms/Volt Digital better accuracy than
shall be 1000 ohms/Volt. Multimeter (3½ digit). analog meter.
9.1 C) Part drawings with sectional details of- -- - Container Container may be
- Terminal post (Positive and Negative) added.
- Container lid
- Pole (Positive and Negative)
- Plates (Positive and Negative groups assembly)
- Separator
- Sealed float guide
- Micro porous vent plug
- Inter cell /unit and end cell connectors
10 INFORMATION TO BE SUPPLIED BY THE -- INFORMATION TO BE SUPPLIED BY THE PURCHASER Already incorporated
PURCHASER i) Nominal voltage of the cell / battery (Cl. 3.1) in previous draft
i) Nominal voltage of the cell / battery (Cl. ii) Capacity (in AH at the 10 hr. rate) spec. and also
3.1) iii) Transparent Translucent PPCP (Polypropylene co- modified.
ii) Capacity (in AH at the 10 hr. rate) polymer) container /Hard rubber container.
iii) Transparent container iv) Accessories and spares, required if any if required.
(Polypropylene)/Hard rubber container. v) Total number of Tool kits sets requirement may be
iv) Accessories and spares required if any. indicated by the purchaser.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 12 of 13


Existing Cl. Description of IRS:S:88/04 Ver.1 Remarks of Minutes of Final Draft IRS:S:88 Version 2.0-d1 RDSO’s Remarks
of meetings
IRS:S:88/04
Ver.1
11.0 -- -- All the provisions contained in RDSO’s ISO New clause added, in
(New procedures laid down in Document No. compliance to
Clause) QO-D-7.1-11 dated 19.07.2016 (titled “Vendor- Vigilance Cell, RDSO’s
Changes in approved status”) and subsequent note no. 13/Vig/
versions/amendments thereof, shall be binding Policy dtd. 26.07.16.
and applicable on the successful vendor/vendors
in the contracts floated by Railways to maintain
quality of products supplied to Railways.’
Annexure A In the consignment, all the cells of the -- In the consignment, all the cells of the same May be modified as
A.1.1 same rating manufactured from the same rating manufactured from the same material specified in Cl. G-1.1,
material under similar conditions of under similar conditions of production shall be Appendix- G of IS:
production shall be grouped together to grouped together to constitute a lot. All the 6848-1979.
constitute a lot. batteries of the same type, design and rating
manufactured from the same material by the
same factory under similar conditions of
production shall constitute a lot as specified in
Cl. G-1.1, Appendix- G of IS: 6848-1979.
Annexure These cells in the sample shall be drawn -- These cells in the sample shall be drawn from Year of IS : 4905
A.1.2 from the lot a random. For the purpose of the lot a random. For the purpose of random incorporated.
random selection, reference may be made selection, reference may be made to IS: 4905-
to IS: 4905-1968. 1968 2015.
A2.1 The acceptance tests shall be conducted on The acceptance tests shall be conducted on May be modified.
minimum two samples up to a maximum of minimum two samples up to a maximum of 1% Random selection for
1% of each type in a lot. the samples being of each type in a lot. the samples being drawn drawing the samples
drawn at random by the purchasing or at random by the purchasing or inspecting is already covered in
inspecting authority as specified in Cl. authority as specified in Cl. 5.1.3.1. Appendix 'G' above A.1.
5.1.3.1. Appendix 'G' in Amendment No. 1 in Amendment No. 1 of IS 6848-79 latest.
of IS 6848-79 latest.

SSE/D/Signal ADE/Signal-VIII Director/Signal-VIII Page 13 of 13