Rolling blackout

A rolling blackout, also referred to as rotational load shedding or feeder rotation, is an intentionally engineered electrical
power shutdown where electricity delivery is stopped for non-overlapping periods of time over different parts of the distribution
region. Rolling blackouts are a last-resort measure used by an electric utility company to avoid a total blackout of the power
system. They are a type of demand response for a situation where the demand for electricity exceeds the power supply
capability of the network. Rolling blackouts may be localised to a specific part of the electricity network or may be more
widespread and affect entire countries and continents. Rolling blackouts generally result from two causes:
insufficient generation capacity or inadequate transmission infrastructure to deliver sufficient power to the area where it is
needed.
Rolling blackouts are a common or even a normal daily event in many developing countries where electricity generation
capacity is underfunded or infrastructure is poorly managed. In well managed under-capacity systems, blackouts are scheduled
in advance and advertised to allow people to work around them, but in most cases they happen without warning, typically
whenever the transmission frequency falls below the 'safe' limit. Rolling blackouts are also used as a response strategy to cope
with reduced output beyond reserve capacity from power stations taken offline unexpectedly such as through an extreme
weather event.
Rolling blackouts in developed countries sometimes occur due to economic forces at the expense of system reliability (such as
in the California electricity crisis of 2000-2001).

Energy policy of Pakistan

Mangla Dam.

The energy policy of Pakistan is formulated and determined by the federal, provincial, and local institutional entities
in Pakistan, which address the issues of energy production, distribution, and consumption of energy, such as gas mileage and
petroleum standards.[1] Energy policy requires the proper legislation, international treaties, subsidies and incentives to
investment, guidelines for energy conservation, taxation and other public policy techniques.
Several mandates and proposals have been called over the years to overlook the energy conservation, such as Neon
signs were banned and the official weekend was extended from one to two days in an attempt to conserve electricity (Gillani,
2010)[2] and reducing the electricity load used by industrial units by 25% during peak hours (Aziz, 2007),[3] but no comprehensive
long-term energy strategies were implemented. Since 1999, many legislative provisions were adopted for energy
conservation including the seeking energy from various renewable energy sources. There is also an intense criticism about the
unequal distribution of energy, the irresponsible usage of energy sources, and the country's new plan which is aimed to raise
country's dependence on imported oil for power generation to 50% by 2030.[4] After much public criticism, the long-term energy
security policy was announced in 2013 through the introduction of equal cutting edge energy transmission network, minimising
financial losses across the energy system and aligning the ministries involved in the energy sector as well as improving the
governance of energy sources.[5]
Studies and policy implementation recommended by AEDB, Water ministry (as policy enforcer), the NEPRA regulates the
energy sources network as well as determining the financial prices of the usage of energy. Government-specific energy-
efficiency incentive programs also play a significant role in the overall energy policy of Pakistan. As of 2013 Prime
Minister Nawaz Sharif has announced a determined and aggressive energy policy to meet the energy challenges and energy
management.[5]

Energy authorities and institutions[edit]


 Government of Pakistan
 Ministry of Water and Power
 Alternative Energy Development Board
 Industrial energy sector
 Electricity sector in Pakistan
 Electricity in Pakistan
 Energy and power regulatory authorities
 Water and Power Development Authority
 National Electric Power Regulatory Authority
 Energy corporations
 Electricity and energy corporations in Pakistan
 Karachi Electric

History[edit]
In the 1960s, a large civilian energy input and infrastructure was built by the Pakistan military, with the financial funds provided
by various countries and international monetary sources.[6] In the 1960s, much of the energy was produced by the hydroelectric
dams and thermal power stations. In the 1970s, Pakistan's energy consumption expanded to nuclear power sources with the
establishment and commissioning of first nuclear power station in Karachi. In the 1980s, the dependence on nuclear sources
further grew and the military continued engineering and building the nuclear power infrastructure.
In 1994, Prime Minister Benazir Bhutto of Pakistan Peoples Party (PPP) launched the country's first ever and largest energy
conservation program to produce 13,000MW and issues 70 Memorandum of Understandings (MOUs) and Letters of Intent
(LOIs) to Independent Power Producers (IPPs).[7] This 1994 energy policy brought a decisive shift in Pakistan's diverse energy
sources.[7] In 1994, out of the total installed capacity of 11000MW, ~60% of energy was produced from the hydroelectric power
sources while nearly ~40% was produced from the thermal and nuclear sources.[7] According to the economic statistics provided
by economist, Sartaj Aziz, this mix was reversed from 60:40 to 30:70 in favour of thermal capacity based on imported fuel.
[7]
Every year, this ratio went down further to 20:80 in winter months as hydropower generation was reduced due to lower water
flows in the rivers.[7]
Controversially, the energy policy depended less on renewable energy sources and dependence on imported oil increased that
created a permanent fault in country's energy conservationsystem. By 1995, only 27 IPPs were able to generate ~6,335MW of
electricity.[7] By 1998, the ratio was stabilised by the policies enforced by Prime Minister Nawaz Sharif. In 2001, the military
government led by President Pervez Musharraf and Prime Minister Shaukat Aziz, while contributing to the growth of domestic
demand for electricity through large-scale provision of bank loans for the purchase of air-conditioners and home appliances
(share of domestic energy consumption had jumped to 46% of the total by 2008), did not add any new capacity to the energy
system.[7]In 2012 Pakistan's first wind power installation came online at the FFCEL Wind Energy Project in Jhimpir.[8]

Policy overview[edit]
Energy policy: 2008–10[edit]
In 2005, Prime Minister Shaukat Aziz announced the long-term energy security program which was aimed to the development
of the power infrastructure from all energy sources.[9] This policy relied on privatising the energy sector by international mega
energy corporations.[10] Controversially, this program was aimed to raise dependence on imported oil from the Arab countries for
power generation to be increased by 50.1% by 2013.[10]
In 2006, Prime Minister Aziz held conversation with the officials of the Saudi Ministry of Petroleum and invited Ali Al-Naimi to
invest in country's energy sector.[11] In 2007, Prime Minister Azizallocated ₨. 12.5 billion for power production-related projects
which remained unused. In his last policy statement, Prime Minister Aziz further called for banning the Neon lights, Neon signs,
and to close the market places by 9 pm; such policy enforcement was harshly resisted by the left-wing parties, such as Pakistan
Peoples Party, Communist Party and the labour unions.[12]
Energy Policy: 2010–13[edit]
After the general elections held in 2008, the mismanagement and weak policies led to an intense repetitive cycle
of loadshedding in the country. Responding to a massive demonstration against the loadshedding and the growing power
shortages in the country, Prime Minister, Yousaf Gilani announced the "energy policy" on 22 April 2010.[13]
The policy was announced after the Prime Minister, Gilani had held a three-day national energy conference in Islamabad with
energy experts that discussed the causes of the power crisis in Pakistan and possible steps to relieve it.[2] On an immediate
effects, the gaseous Neon lights and the signs were banned and the official weekend was extended from one to two days in an
attempt to conserve electricity.[14] Under this policy, several attempts were made by Gilani government to privatise the energy
sector.[15] Devised by the Finance Minister Abdul Hafeez Shaikh, the programme failed to resolve electricity shortage, which
private energy companies failed to maintain and upgrade despite being part of their contract.[15] After much criticism and public
demonstration in 2012, the PPP government decided to nationalised the energy sector and issued clear directives to regulate
the energy corporations to produce the power generations.[16]
Energy Policy: 2013–18[edit]
Musadik Masood Malik was appointed Federal Minister, Water and Power of the Pakistan Government in May, 2013.[17] Within
two months, he was replaced by Abid Sher Ali who served in the role until the ministry was abolished in September, 2017.[18] In
its place a Ministry of Energy was created. Awais Leghari served as the first energy minister of the country until the end of the
government's tenure.[19]
The 2010 amendment to Pakistan’s Constitution (para. 3), empowered each province to formulate the policy framework for the
development of public and private sector power generation. This has led to the formation of dedicated provincial departments
and empowered public sector companies specialized in renewables to foster and execute power projects through public, private
and public–private partnership modes using indigenous power resources.[20]
This tenure's energy policy was aimed at aggressively building power generation capacity through early-harvest projects
in CPEC. A total of 10,973 MW of power was added by the government during its tenure, mostly via private sector investments.
[21]
 In terms of public sector projects conducted by provincial governments in view of the 2010 amendment, KPK government led
with the addition of 1,670 MW to the national grid.[22] It was followed by Sindh and Punjab governments which contributed 935
MW and 580 MW respectively.[23][24] Balochistan government didn't inaugurate any public sector power project during its tenure.[25]
However, despite the massive addition of power to the national grid, glaring issues existed in the power sector. There was no
viable overhaul done to the electricity transport infrastructure which lead to episodes of plant tripping and extended blackouts
during the summer months.[26] Furthermore, there was still a wide demand and supply gap during high temperature months
which led to periodic, planned load-shedding.[27] Finally, the issue of circular debt was still attached to the power sector and
reached a record high of Rs. 922 billion in March, 2018.[28]

Conservation and consumption[edit]


Due to rising demand and a failing power infrastructure severe electricity shortages have occurred in Pakistan. This has led to
widespread rolling blackouts that have paralysed industry and led to protests and rioting.[13] Power outages can last 6–8 hours a
day in the cities and many more in the rural areas.[29] According to Mahnaz Parach of Network for Consumer Protection
"Children can't do their homework. Housework doesn't get done, as washing machines and other appliances cannot work.
When you go home from work, you have no idea whether there will be electricity at home. Your whole life is disturbed."[30]
Experts have warned of an impending energy crisis since 2006.[31] Speaking at a Seminar 'Fueling the Future: Meeting
Pakistan's Energy Needs in the 21st Century' held in Washington, D.C. in June 2006 then energy adviser to the prime minister
of Pakistan Mukhtar Ahmed stated that the country was taking steps to address the energy shortage.[32] Pakistan Electric Power
Companyestimates that there is a shortage of 6 gigawatts or about 60% of its total generation.[33] One of the main reasons of the
shortage is thought to be the failure of past governments to anticipate growth in need and the delay in implementation of
projects to increase power production. In addition there is widespread power theft and lack of investment in the existing power
grid.[34]
The United States has made improving Pakistan's power infrastructure one of its top priorities.[35] US special envoy Richard
Holbrooke, while describing the power situation in Pakistan as "unacceptable," has stated that the US would go to its "absolute
limits" to help Pakistan overcome the crisis.[36]
Power sources and electrical energy[edit]
Measures are aimed at cutting consumption by 500 megawatts. The official weekend has been extended from one to two
days. Neon signs and decorative lights have been banned. Power has been cut to government offices by 50% and air
conditioners will only be allowed to be switched on after 11 am. Street markets have been asked to close early.[13] Commercial
centres except drug stores will be closed at 8 pm and wedding celebrations will be limited to three hours. The government will
pay off its $1.38 billion debt to power producers allowing them to pay fuel suppliers.[37] Power supply to Pakistan's commercial
capital Karachi will be decreased by 300 megawatts to allow fairer distribution of power to the remaining parts of the country.
[38]
 Tube wellswill not be allowed to operate from 7 pm to 11 pm.[2] The measures will be reviewed on 30 July 2010.[39]
Consumption by computers[edit]
Main articles: Computing in Pakistan and Green computing

Since the early 1990s, the country has observed the highest growth rate in usage of computers that effect the supply of the
electricity produced in the system.[40] In a survey published by the Express Tribune, around ~30 million citizens (out
of 180 million), uses the internet on daily basis; the internet penetration in the country has reached 16% as of 2013.[41]
Variations by regions[edit]
In the days following the announcement, traders in Lahore rejected the government's decision and kept the markets open
after 8 pm in defiance of the ban.[42] Shops were kept open in other cities also after 8 pm. Kashif Shabbir, president of
the Rawalpindi Chamber of Commerce warned the situation would get worse if authorities used force to implement the decision.
[43]
 There was confusion over implementation of the two-day weekend, and many banks and educational institutions remained
open.[44] Commenting on the defiant mood of the traders, an editorial in Dawnurged everybody to find middle ground.[45]
Reacting to the decision to curtail power supply to Karachi, the "City of Lights", leaders of various political parties in
the Provincial Assembly of Sindh condemned the decision and some of them called it "a conspiracy to create a law and order
situation." Former Nazim of Karachi, Naimatullah Khan warned that curtailing the power supply of the city could lead to street
battles between protesters and law enforcement.[46]
Some analysts have predicted that reduction in the banks' workweek to 5 days will result in revenue losses.[47]
The prevailing energy crisis in Pakistan is taking away 2 percent (or Rs 380 billion) of the economy, despite the government has
spent Rs 1.1 trillion as subsidies on the sector in the last four-year which accounts for 2.5 percent of the total volume of
economy.[48]
During June 2012, President Asif Ali Zardari had said that the government realised the enormity of the challenge of energy
shortage and was determined to overcome it in the shortest possible time.[49]

International co-operation[edit]
Pakistan is already importing small quantity of electricity from Iran to supply power to Gwadar town. Pakistan is also actively
considering to import electricity from India and Tajikistan. World Bankoffered to finance for conducting the feasibility study to
import 1200 MW power from India.[50][51]
Pakistan is also exploring to import PNG via pipe line through Wagha border from India. India would import the
required LNG and re-gasified LNG (RLNG) would be pumped through its pipelines up to the border point.[52] Iran–Pakistan gas
pipeline is pending for a long time to receive PNG from Iran for the needs of both Pakistan and India