Professional Documents
Culture Documents
Engineer Comments :
Approved
YEDAHM 28th Dec 2019 Kim Yang Kuen
by Consultant
FIELD INTER FACE CLEARANCE
INSPECTION BEFORE PLACING OF CONCRETE
SIGNATURE
Inspection Date Checked Check(V) REMARKS
Item Approved by Applicable Rating
( ) GOOD
Rebar Work none none
( ) POOR
( ) GOOD
Form Work none none
( ) POOR
( ) GOOD
Clean Out
( ) POOR
( ) GOOD
( ) POOR
( ) GOOD
( ) POOR
( ) GOOD
( ) POOR
( ) GOOD
( ) POOR
( ) GOOD
( ) POOR
Remarks
Foam Tank(FT-502),FireWaterTank(FT-501,502)
1 AREA ,Fire Water Jockey Pump(FP-503A/B) ,Disel Oil Tank For E.Pump(TK-402)
SLUMP REQUIRED
TEMPERATURE REQ'D
8 COMMENTS
GRADE OF CONCRET18MPA
Remarks
Remarks
Requested by Contractor
Approved by Consultant
SUB-PREPARATION FORMS
SUB-PREPARATION FORMS