You are on page 1of 6

MARITIME INFRASTRUCTURE ESTABLISHMENT PROJECT 2 (MIEP 2)

REQUEST FOR INSPECTION

RFI Date : 27. 12. 2019


Inspection Date : 28. 12. 2019 Onshore Works RFI No. : YUIL/MIEP2/FWP-001
Work Decipline Civil X Building Mechanical Electrical Instruction Others
Work Area : Fire Water Pump
INSPECTION Hold
No. DESCRIPTION DWG/SPEC REF. REMARKS
TIME Point
1 For Lean Concrete (FT-502 Foam Tank) MIEP - 2 - PR - PID - 023 15:30
2 For Lean Concrete (FT-502 Fire Water Pump) MIEP - 2 - PR - PID - 020 15:30
3 For Lean Concrete (FT-501 Fire Water Pump) MIEP - 2 - PR - PID - 020 15:30
4 For Lean Concrete (FP-503A/B Fire Water Jockey Pump) MIEP - 2 - PR - PID - 020 15:30
5 For Lean Concrete (TK-402 Disel Oil Tank For E.Pump) MIEP - 2 - PR - PID - 010 15:30

Engineer Comments :

Date Name Signature


YUIL 27 . 12 . 2019 Kim Yeo Jun
. Requested
SAMWOO 28 . 12 . 2019 Seo Byung Kwon
by Contractor
SAMSUNG

Approved
YEDAHM 28th Dec 2019 Kim Yang Kuen
by Consultant
FIELD INTER FACE CLEARANCE
INSPECTION BEFORE PLACING OF CONCRETE

RFI NO. : YUIL/MIEP2/ FWP-001

PROJECT NAME : MIEP 2 DATE : 27/Dec/2019

DWG NO. : MIEP-PR-PID 010,020,023 REV. NO. : A

AREA / LOCATION : ONSHORE Fire Water Pump SUB CONTRACTOR : YUIL

SIGNATURE
Inspection Date Checked Check(V) REMARKS
Item Approved by Applicable Rating

( ) GOOD
Rebar Work none none
( ) POOR

( ) GOOD
Form Work none none
( ) POOR

( ) GOOD
Clean Out
( ) POOR

( ) GOOD

( ) POOR

( ) GOOD

( ) POOR

( ) GOOD

( ) POOR

( ) GOOD

( ) POOR

( ) GOOD

( ) POOR

Remarks

WITNESSED BY DATE NAME, SIGNATURE

27. 12 . 2019 Kim Yeo Jun

Requested by Contractor 28. 12 . 2019 Seo Byung Kwon

Approved by Consultant 28th Dec 2019 Kim yang Kuen


FIELD TEST / INSPECTION REPORT
CONCRETE POURING PERMIT

RFI NO. : YUIL/MIEP2/FWP-001

PROJECT NAME : MIEP 2 DATE : 27/Dec/2019

DWG NO. : MIEP-PR-PID 010,020,023 REV. NO. : A

AREA / LOCATION : ONSHORE Fire Water Pump SUB CONTRACTOR YUIL

Foam Tank(FT-502),FireWaterTank(FT-501,502)
1 AREA ,Fire Water Jockey Pump(FP-503A/B) ,Disel Oil Tank For E.Pump(TK-402)

2 LOCATION OF POUR LEAN CONCRETE

3 DATE OF POUR 28/Dec/2019

4 VOLUME OF CONCRETE 8.0 ㎥ ( 4.8 by DWG )

5 MIXING PROCESS - SITE MIXING - TRANSIT - OTHERS

6 CONCRETE SPECIFICATION STRENGTH REQUIRED 18 MPA

SLUMP REQUIRED

TEMPERATURE REQ'D

8 COMMENTS

TIME START 9H00mm

GRADE OF CONCRET18MPA

TIME FINISH 11H30mm

Remarks

WITNESSED BY DATE NAME, SIGNATURE

27. 12 . 2019 Kim Yeo Jun

Requested by Contractor 28. 12 . 2019 Seo Byung Kwon

Approved by Consultant 28th Dec 2019 Kim yang Kuen


GENERAL CHECK FORMAT

RFI NO. : YUIL/MIEP2/FT_501-001

PROJECT NAME : MIEP 2 DATE : 08/11/2019 & …../….../2019

DWG NO. : MIEP2_C-230_(FT-501) FOUNDATION PLAN & SECTION REV. NO. :

AREA / LOCATION : ONSHORE FT_501 SUB CONTRACTOR YUIL

Remarks

WITNESSED BY DATE NAME, SIGNATURE

Requested by Contractor

Approved by Consultant
SUB-PREPARATION FORMS

PASSED FAILED PASSED FAILED P

SUB-PREPARATION FORMS

PASSED FAILED PASSED


A-BOLT /
FORMS RE-BAR
EMBEDDED STEEL

PASSED FAILED PASSED FAILED PASSED FAILED

FORMS RE-BAR ACCESSORY

FAILED PASSED FAILED PASSED FAILED