PACE CIRCLE PROJECT, LAHORE

Concrete Compression Test Report


Hammer Hammer Test Results Required Remarks
Sr. Date Location Srtructure Type Grid Test Strenght
Valeus N/mm2 PSI PSI OK Not OK
1 11/13/2015 3rd Floor Rounded Columns PK/P3 42.8 38.5 5597.1 7000
2 11/13/2015 3rd Floor Rounded Columns PL/P3 44.0 40.25 5851.5 7000
3 11/13/2015 3rd Floor Rounded Columns PL/P2 45.7 43.7 6353.1 7000
4 11/13/2015 3rd Floor Rounded Columns PK/P2 41.2 35.9 5219.1 7000
5 11/13/2015 3rd Floor Column PM/P2,P3 43.3 39.1 5684.4 7000
6 11/13/2015 3rd Floor Column PL/P5 43.7 39.8 5786.1 7000
7 11/13/2015 3rd Floor Column PK/P5 45.2 42.25 6142.3 7000
8 11/13/2015 3rd Floor Column PJ/P5 40.9 35.9 5219.1 7000
9 11/13/2015 3rd Floor Column PJ/P2 44.2 40.25 5851.5 7000
10 11/13/2015 3rd Floor Column PJ/P1 43.8 39.75 5778.9 7000
11 11/13/2015 3rd Floor Column PK.PJ/P1 43.2 39.5 5742.5 7000
12 11/13/2015 3rd Floor Column PL,PM/P1 43.2 39.5 5742.5 7000
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Preparied by: Checked by:

Page 1 of 19
PACE CIRCLE PROJECT, LAHORE

Page 2 of 19
PACE CIRCLE PROJECT, LAHORE

Concrete Compression Test Report

Hammer Hammer Test Results Required Remarks


Sr. Date Location Srtructure Type Grid Test Strenght
Valeus N/mm2 PSI PSI OK Not OK
1 11/13/2015 2nd Floor Rounded Columns PK/P3 42.8 38.8 5640.7 7000
2 11/13/2015 2nd Floor Rounded Columns PL/P3 44.0 41 5960.6 7000
3 11/13/2015 2nd Floor Rounded Columns PL/P2 45.7 44.7 6498.5 7000
4 11/13/2015 2nd Floor Rounded Columns PK/P2 41.2 36.2 5262.8 7000
5 11/13/2015 2nd Floor Column PM/P2,P3 43.3 39.3 5713.4 7000
6 11/13/2015 2nd Floor Column PL/P5 43.7 39.7 5771.6 7000
7 11/13/2015 2nd Floor Column PK/P5 45.2 42.2 6135.0 7000
8 11/13/2015 2nd Floor Column PJ/P5* 40.9 35.9 5219.1 7000
9 11/13/2015 2nd Floor Column PJ/P2 44.2 41.2 5989.7 7000
10 11/13/2015 2nd Floor Column PJ/P1 43.8 39.8 5786.1 7000
11 11/13/2015 3rd Floor Column PK.PJ/P1 43.2 39.2 5698.9 7000
12 11/13/2015 3rd Floor Column PL,PM/P1 43.2 39.2 5698.9 7000
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Preparied by: Checked by:

Page 3 of 19
PACE CIRCLE PROJECT, LAHORE

Page 4 of 19
PACE CIRCLE PROJECT, LAHORE

Concrete Compression Test Report

Hammer Hammer Test Results Required Remarks


Sr. Date Location Srtructure Type Grid Test Strenght
Valeus N/mm2 PSI PSI OK Not OK
1 11/14/2015 1st Floor Rounded Columns PK/P3 45.3 42.3 6149.6 7000
2 11/14/2015 1st Floor Rounded Columns PL/P3 44.5 41.5 6033.3 7000
3 11/14/2015 1st Floor Rounded Columns PL/P2 47.7 46.7 6789.2 7000
4 11/14/2015 1st Floor Rounded Columns PK/P2 44.5 41.5 6033.3 7000
5 11/14/2015 1st Floor Column PM/P2,P3 46.8 45.8 6658.4 7000
6 11/14/2015 1st Floor Column PL/P5 46.8 45.8 6658.4 7000
7 11/14/2015 1st Floor Column PK/P5 44.3 40.3 5858.8 7000
8 11/14/2015 1st Floor Column PJ/P5 46.0 44 6396.7 7000
9 11/14/2015 1st Floor Column PJ/P2 44.7 41.7 6062.3 7000
10 11/14/2015 1st Floor Column PJ/P1 44.7 44.7 6498.5 7000
11 11/14/2015 1st Floor Column PK.PJ/P1 45.0 42 6106.0 7000
12 11/14/2015 1st Floor Column PL,PM/P1 45.0 42 6106.0 7000
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Preparied by: Checked by:

Page 5 of 19
PACE CIRCLE PROJECT, LAHORE

Page 6 of 19
PACE CIRCLE PROJECT, LAHORE

Concrete Compression Test Report

Hammer Hammer Test Results Required Remarks


Sr. Date Location Srtructure Type Grid Test Strenght
Valeus N/mm2 PSI PSI OK Not OK
1 11/14/2015 Ground Floor Rounded Columns PK/P3 45.7 43.7 6353.1 7000
2 11/14/2015 Ground Floor Rounded Columns PL/P3 47.3 46.3 6731.1 7000
3 11/14/2015 Ground Floor Rounded Columns PL/P2 45.0 42 6106.0 7000
4 11/14/2015 Ground Floor Rounded Columns PK/P2 50.3 50.3 7312.6 7000
5 11/14/2015 Ground Floor Column PM/P2,P3 45.0 42 6106.0 7000
6 11/14/2015 Ground Floor Column PL/P5 45.0 42 6106.0 7000
7 11/14/2015 Ground Floor Column PK/P5 45.8 43.8 6367.6 7000
8 11/14/2015 Ground Floor Column PJ/P5 48.8 46.8 6803.8 7000
9 11/14/2015 Ground Floor Column PJ/P2 45.8 43.8 6367.6 7000
10 11/14/2015 Ground Floor Column PJ/P1 49.0 49 7123.6 7000
11 11/14/2015 Ground Floor Column PK.PJ/P1 48.3 43.3 6295.0 7000
12 11/14/2015 Ground Floor Column PL,PM/P1 44.7 41.7 6062.3 7000
13 11/14/2015 Ground Floor Column PH/P1 43.8 40.8 5931.5 7000
14 11/14/2015 Ground Floor Column PH/P2 42.4 37.4 5437.2 7000
15 11/14/2015 Ground Floor Column PH/P3 42.4 37.4 5437.2 7000
16 11/14/2015 Ground Floor Column PH/P5 42.0 37 5379.1 7000
17 11/14/2015 Ground Floor Column PG/P1 42.5 37.5 5451.8 7000
18 11/14/2015 Ground Floor Column PG/P3 41.2 36.2 5262.8 7000
19 11/14/2015 Ground Floor Column PG/AZ 42.4 37.4 5437.2 7000
20 11/14/2015 Ground Floor Column PF/P1 43.1 40.1 5829.7 7000
21 11/14/2015 Ground Floor Column PF/P3 44.4 41.4 6018.7 7000
22 11/14/2015 Ground Floor Column PF/WP4 45.3 42.3 6149.6 7000
23 11/14/2015 Ground Floor Column PE/P3 43.6 40.6 5902.4 7000
24
25
26
27
28
29
30
31
32
33
34
35
36
Preparied by: Checked by:

Page 7 of 19
PACE CIRCLE PROJECT, LAHORE

Concrete Compression Test Report

Hammer Hammer Test Results Required Remarks


Sr. Date Location Srtructure Type Grid Test Strenght
Valeus N/mm2 PSI PSI OK Not OK
1 11/16/2015 Basment 1 Rounded Columns PK/P3 53.0 55 7995.9 7000
2 11/16/2015 Basment 1 Rounded Columns PL/P3 47.5 45.7 6643.9 7000
3 11/16/2015 Basment 1 Rounded Columns PL/P2 46.7 44 6396.7 7000
4 11/16/2015 Basment 1 Rounded Columns PK/P2 50.8 50.8 7385.3 7000
5 11/16/2015 Basment 1 Column PM/P2,P3 49.5 48.5 7050.9 7000
6 11/16/2015 Basment 1 Column PL/P5 48.8 47.8 6949.2 7000
7 11/16/2015 Basment 1 Column PK/P5 49.2 48.2 7007.3 7000
8 11/16/2015 Basment 1 Column PJ/P5 47.3 45.3 6585.7 7000
9 11/16/2015 Basment 1 Column PJ/P2 51.5 52.5 7632.5 7000
10 11/16/2015 Basment 1 Column PJ/P1 51.0 52 7559.8 7000
11 11/16/2015 Basment 1 Column PK.PJ/P1 49.7 48.7 7080.0 7000
12 11/16/2015 Basment 1 Column PL,PM/P1 45.8 42.8 6222.3 7000
13 11/16/2015 Basment 1 Column PH/P1 51.2 52.2 7588.8 7000
14 11/16/2015 Basment 1 Column PH/P2 52.3 54 7850.5 7000
15 11/16/2015 Basment 1 Column PH/P3 46.3 44.3 6440.3 7000
16 11/16/2015 Basment 1 Column PH/P5 42.7 38.7 5626.2 7000
17 11/16/2015 Basment 1 Column PG/P1 53.1 55.1 8010.4 7000
18 11/16/2015 Basment 1 Column PG/P3 42.1 38.1 5539.0 7000
19 11/16/2015 Basment 1 Column PG/AZ 44.8 40.8 5931.5 7000
20 11/16/2015 Basment 1 Column PF/P1 53.4 55.4 8054.1 7000
21 11/16/2015 Basment 1 Column PF/P3 42.3 40.3 5858.8 7000
22 11/16/2015 Basment 1 Column PF/WP4 45.3 42.3 6149.6 7000
23 11/16/2015 Basment 1 Column PE/P3 48.9 47.9 6963.7 7000
24
25
26
27
28
29
30
31
32
33
34
35
36
Preparied by: Checked by:

Page 8 of 19
PACE CIRCLE PROJECT, LAHORE

Concrete Compression Test Report

Hammer Hammer Test Results Required Remarks


Sr. Date Location Srtructure Type Grid Test Strenght
Valeus N/mm2 PSI PSI OK Not OK
1 11/16/2015 Basment 2 Rounded Columns PK/P3 54.3 55.3 8039.5 7000
2 11/16/2015 Basment 2 Rounded Columns PL/P3 51.3 52.3 7603.4 7000
3 11/16/2015 Basment 2 Rounded Columns PL/P2 51.3 52.3 7603.4 7000
4 11/16/2015 Basment 2 Rounded Columns PK/P2 51.6 52.6 7647.0 7000
5 11/16/2015 Basment 2 Column PM/P2,P3 48.0 47 6832.9 7000
6 11/16/2015 Basment 2 Column PL/P5 51.6 52.6 7647.0 7000
7 11/16/2015 Basment 2 Column PK/P5 50.5 50.5 7341.7 7000
8 11/16/2015 Basment 2 Column PJ/P5 47.6 44.6 6483.9 7000
9 11/16/2015 Basment 2 Column PJ/P2 53.0 54 7850.5 7000
10 11/16/2015 Basment 2 Column PJ/P1 52.4 53.2 7734.2 7000
11 11/16/2015 Basment 2 Column PK.PJ/P1 52.5 53.5 7777.8 7000
12 11/16/2015 Basment 2 Column PL,PM/P1 52.4 53.4 7763.3 7000
13 11/16/2015 Basment 2 Column PH/P1 52.7 53.7 7806.9 7000
14 11/16/2015 Basment 2 Column PH/P2 51.8 52.8 7676.1 7000
15 11/16/2015 Basment 2 Column PH/P3 50.0 50 7269.0 7000
16 11/16/2015 Basment 2 Column PH/P5 51.9 52.9 7690.6 7000
17 11/16/2015 Basment 2 Column PG/P1 50.8 50.8 7385.3 7000
18 11/16/2015 Basment 2 Column PG/P3 51.4 52.9 7690.6 7000
19 11/16/2015 Basment 2 Column PG/AZ 51.3 52.3 7603.4 7000
20 11/16/2015 Basment 2 Column PF/P1 52.3 53.3 7748.8 7000
21 11/16/2015 Basment 2 Column PF/P3 51.5 52.5 7632.5 7000
22 11/16/2015 Basment 2 Column PF/WP4 50.5 50.5 7341.7 7000
23 11/16/2015 Basment 2 Column PE/P3 52.1 53.1 7719.7 7000
24
25
26
27
28
29
30
31
32
33
34
35
36
Preparied by: Checked by:

Page 9 of 19
PACE CIRCLE PROJECT, LAHORE

Concrete Compression Test Report

Hammer Hammer Test Results Required Remarks


Sr. Date Location Srtructure Type Grid Test Strenght
Valeus N/mm2 PSI PSI OK Not OK
1 11/16/2015 Basment 3 Rounded Columns PK/P3 51.1 52.1 7574.3 7000
2 11/16/2015 Basment 3 Rounded Columns PL/P3 51.7 52.7 7661.5 7000
3 11/16/2015 Basment 3 Rounded Columns PL/P2 50.3 50.3 7312.6 7000
4 11/16/2015 Basment 3 Rounded Columns PK/P2 50.3 50.3 7312.6 7000
5 11/16/2015 Basment 3 Column PM/P2,P3 49.5 48.5 7050.9 7000
6 11/16/2015 Basment 3 Column PL/P5 49.8 48.8 7094.5 7000
7 11/16/2015 Basment 3 Column PK/P5 50.7 50.7 7370.8 7000
8 11/16/2015 Basment 3 Column PJ/P5 46.3 42.3 6149.6 7000
9 11/16/2015 Basment 3 Column PJ/P2 52.3 53.3 7748.8 7000
10 11/16/2015 Basment 3 Column PJ/P1 45.0 42 6106.0 7000
11 11/16/2015 Basment 3 Column PK.PJ/P1 47.8 46.8 6803.8 7000
12 11/16/2015 Basment 3 Column PL,PM/P1 53.3 54.3 7894.1 7000
13 11/16/2015 Basment 3 Column PH/P1 46.7 43.7 6353.1 7000
14 11/16/2015 Basment 3 Column PH/P2 51.3 52.3 7603.4 7000
15 11/16/2015 Basment 3 Column PH/P3 51.8 52.8 7676.1 7000
16 11/16/2015 Basment 3 Column PH/P5 47.7 46.7 6789.2 7000
17 11/16/2015 Basment 3 Column PG/P1 50.4 50.4 7327.2 7000
18 11/16/2015 Basment 3 Column PG/P3 49.7 48.7 7080.0 7000
19 11/16/2015 Basment 3 Column PG/AZ 49.3 48.3 7021.9 7000
20 11/16/2015 Basment 3 Column PF/P1 50.3 50.3 7312.6 7000
21 11/16/2015 Basment 3 Column PF/P3 50.5 50.5 7341.7 7000
22 11/16/2015 Basment 3 Column PF/WP4 51.0 52 7559.8 7000
23 11/16/2015 Basment 3 Column PE/P3 51.8 52.8 7676.1 7000
24
25
26
27
28
29
30
31
32
33
34
35
36
Preparied by: Checked by:

Page 10 of 19
PACE CIRCLE PROJECT, LAHORE

Concrete Compression Test Report

Hammer Hammer Test Results Required Remarks


Sr. Date Location Srtructure Type Grid Test Strenght
Valeus N/mm2 PSI PSI OK Not OK
1 11/16/2015 Basment 4 Rounded Columns PK/P3 50.6 50.6 7356.2 7000
2 11/16/2015 Basment 4 Rounded Columns PL/P3 50.4 50.4 7327.2 7000
3 11/16/2015 Basment 4 Rounded Columns PL/P2 51.0 52 7559.8 7000
4 11/16/2015 Basment 4 Rounded Columns PK/P2 50.0 50 7269.0 7000
5 11/16/2015 Basment 4 Column PM/P2,P3 50.3 50.3 7312.6 7000
6 11/16/2015 Basment 4 Column PL/P5 47.3 44.3 6440.3 7000
7 11/16/2015 Basment 4 Column PK/P5 45.5 42.5 6178.7 7000
8 11/16/2015 Basment 4 Column PJ/P5 43.4 46.4 6745.6 7000
9 11/16/2015 Basment 4 Column PJ/P2 52.3 53.3 7748.8 7000
10 11/16/2015 Basment 4 Column PJ/P1 52.1 53.1 7719.7 7000
11 11/16/2015 Basment 4 Column PK.PJ/P1 51.4 52.4 7617.9 7000
12 11/16/2015 Basment 4 Column PL,PM/P1 51.6 52.6 7647.0 7000
13 11/16/2015 Basment 4 Column PH/P1 51.1 52.1 7574.3 7000
14 11/16/2015 Basment 4 Column PH/P2 51.5 52.5 7632.5 7000
15 11/16/2015 Basment 4 Column PH/P3 50.3 50.3 7312.6 7000
16 11/16/2015 Basment 4 Column PH/P5 47.3 44.3 6440.3 7000
17 11/16/2015 Basment 4 Column PG/P1 52.2 53.2 7734.2 7000
18 11/16/2015 Basment 4 Column PG/P3 46.0 43 6251.3 7000
19 11/16/2015 Basment 4 Column PG/AZ 48.7 46.7 6789.2 7000
20 11/16/2015 Basment 4 Column PF/P1 46.4 43.4 6309.5 7000
21 11/16/2015 Basment 4 Column PF/P3 47.1 44.1 6411.3 7000
22 11/16/2015 Basment 4 Column PF/WP4 48.5 46.5 6760.2 7000
23 11/16/2015 Basment 4 Column PE/P3 48.5 46.5 6760.2 7000
24
25
26
27
28
29
30
31
32
33
34
35
36
Preparied by: Checked by:

Page 11 of 19
PACE CIRCLE MIXED DEVELOPMENT PROJECT LAHORE:

Schmmit Hammer Test Results.

Project:- Pace circle Lahore.


Rebond Hammer Test Readings
Sr. Date Location Srtructure Type Grid
1 2 3 4 5 6 7 8 9 10 11 12 Avg.
1 11/13/2015 3rd Floor Rounded Columns PK/P3 50 54 49 44 52 42 52 52 52 50 53 53 50.3

2 11/13/2015 3rd Floor Rounded Columns PL/P3 38 56 46 50 48 48 45 32 44 49 52 46 46.2

3 11/13/2015 3rd Floor Rounded Columns PL/P2 53 46 34 44 42 44 43 45 38 42 36 44 42.6

4 11/13/2015 3rd Floor Rounded Columns PK/P2 40 46 38 52 46 48 40 46 44 46 44 42 44.3

5 11/13/2015 3rd Floor Column PM/P2,P3 48 38 52 44 46 40 48 54 48 46 46 46 46.3

6 11/13/2015 3rd Floor Column PL/P5 46 52 46 48 40 44 50 48 44 36 46 44 45.3

7 11/13/2015 3rd Floor Column PK/P5 52 44 45 48 40 44 50 48 44 36 46 44 45.1

8 11/13/2015 3rd Floor Column PJ/P5 40 46 50 50 46 52 38 46 44 44 44 46 45.5

9 11/13/2015 3rd Floor Column PJ/P2 40 48 40 42 44 40 48 32 32 40 38 30 39.5

10 11/13/2015 3rd Floor Column PJ/P1 40 52 48 30 54 44 50 48 32 48 40 42 44.0

11 11/13/2015 3rd Floor Column PK.PJ/P1 44 42 40 34 50 40 42 44 40 48 46 42 42.7

12 11/13/2015 3rd Floor Column PL,PM/P1 44 46 50 52 44 36 42 42 46 42 44 40 44.0

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36
PACE CIRCLE MIXED DEVELOPMENT PROJECT LAHORE:

Schmmit Hammer Test Results.

Project:- Pace circle Lahore.


Rebond Hammer Test Readings
Sr. Date Location Srtructure Type Grid
1 2 3 4 5 6 7 8 9 10 11 12 Avg.
1 11/13/2015 2nd Floor Rounded Columns PK/P3 44 32 40 50 46 46 40 42 44 40 44 46 42.8

2 11/13/2015 2nd Floor Rounded Columns PL/P3 42 46 40 48 44 46 42 48 40 48 42 42 44.0

3 11/13/2015 2nd Floor Rounded Columns PL/P2 46 44 44 48 48 44 42 44 48 50 46 44 45.7

4 11/13/2015 2nd Floor Rounded Columns PK/P2 46 40 40 40 42 40 38 40 42 42 36 48 41.2

5 11/13/2015 2nd Floor Column PM/P2,P3 46 42 42 42 42 42 46 40 48 44 42 44 43.3

6 11/13/2015 2nd Floor Column PL/P5 42 44 38 46 48 40 48 46 42 42 44 44 43.7

7 11/13/2015 2nd Floor Column PK/P5 48 48 44 44 46 44 44 46 42 46 46 44 45.2

8 11/13/2015 2nd Floor Column PJ/P5* 42 42 40 38 38 42 37 42 42 44 42 42 40.9

9 11/13/2015 2nd Floor Column PJ/P2 40 42 36 42 44 48 46 48 50 48 38 48 44.2

10 11/13/2015 2nd Floor Column PJ/P1 42 42 46 50 46 46 42 46 46 38 40 42 43.8

11 11/13/2015 2nd Floor Column PK.PJ/P1 48 44 40 44 46 42 46 40 42 44 40 42 43.2

12 11/13/2015 2nd Floor Column PL,PM/P1 42 48 42 44 44 40 42 46 44 44 42 40 43.2

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36
PACE CIRCLE MIXED DEVELOPMENT PROJECT LAHORE:

Schmmit Hammer Test Results.

Project:- Pace circle Lahore.


Rebond Hammer Test Readings
Sr. Date Location Srtructure Type Grid
1 2 3 4 5 6 7 8 9 10 11 12 Avg.
1 11/14/2015 1st Floor Rounded Columns PK/P3 46 44 44 40 40 50 50 46 52 44 44 44 45.3

2 11/14/2015 1st Floor Rounded Columns PL/P3 40 52 42 46 44 50 46 48 46 40 40 40 44.5

3 11/14/2015 1st Floor Rounded Columns PL/P2 50 46 44 44 46 48 50 50 48 50 48 48 47.7

4 11/14/2015 1st Floor Rounded Columns PK/P2 44 44 50 44 42 46 42 44 46 42 46 44 44.5

5 11/14/2015 1st Floor Column PM/P2,P3 50 52 48 44 42 46 52 46 46 44 42 50 46.8

6 11/14/2015 1st Floor Column PL/P5 52 52 48 46 50 46 42 44 42 38 52 50 46.8

7 11/14/2015 1st Floor Column PK/P5 48 42 44 42 44 42 44 46 46 44 44 46 44.3

8 11/14/2015 1st Floor Column PJ/P5 48 44 40 50 46 50 48 42 50 42 44 48 46.0

9 11/14/2015 1st Floor Column PJ/P2 46 46 44 40 48 46 42 44 42 46 48 44 44.7

10 11/14/2015 1st Floor Column PJ/P1 44 46 48 42 46 40 42 46 46 44 48 44 44.7

11 11/14/2015 1st Floor Column PK.PJ/P1 44 44 44 42 36 48 46 44 48 50 46 48 45.0

12 11/14/2015 1st Floor Column PL,PM/P1 46 42 50 50 44 46 38 46 46 42 46 44 45.0

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36
PACE CIRCLE MIXED DEVELOPMENT PROJECT LAHORE:

Schmmit Hammer Test Results.

Project:- Pace circle Lahore.


Rebond Hammer Test Readings
Sr. Date Location Srtructure Type Grid
1 2 3 4 5 6 7 8 9 10 11 12 Avg.
1 11/14/2015 Ground Floor Rounded Columns PK/P3 44 48 40 44 48 46 42 48 44 46 48 50 45.7

2 11/14/2015 Ground Floor Rounded Columns PL/P3 46 50 42 46 48 46 52 50 50 46 46 46 47.3

3 11/14/2015 Ground Floor Rounded Columns PL/P2 42 48 46 40 44 44 46 42 46 44 46 52 45.0

4 11/14/2015 Ground Floor Rounded Columns PK/P2 52 50 52 50 50 52 52 54 42 50 50 50 50.3

5 11/14/2015 Ground Floor Column PM/P2,P3 42 48 44 48 46 46 46 46 42 40 44 48 45.0

6 11/14/2015 Ground Floor Column PL/P5 42 50 48 44 42 44 40 50 50 40 44 46 45.0

7 11/14/2015 Ground Floor Column PK/P5 50 50 44 46 46 44 46 48 48 42 44 42 45.8

8 11/14/2015 Ground Floor Column PJ/P5 52 54 46 48 52 44 50 46 46 48 52 48 48.8

9 11/14/2015 Ground Floor Column PJ/P2 48 46 52 48 44 44 50 38 48 46 44 42 45.8

10 11/14/2015 Ground Floor Column PJ/P1 50 50 44 50 48 50 52 50 52 50 46 46 49.0

11 11/14/2015 Ground Floor Column PK.PJ/P1 52 52 46 46 42 48 54 50 50 48 44 48 48.3

12 11/14/2015 Ground Floor Column PL,PM/P1 48 46 48 42 40 50 42 42 40 48 46 44 44.7

13 11/14/2015 Ground Floor Column PH/P1 46 40 40 40 50 39 40 42 52 46 44 46 43.8

14 11/14/2015 Ground Floor Column PH/P2 44 42 42 48 40 50 46 40 40 39 39 39 42.4

15 11/14/2015 Ground Floor Column PH/P3 42 42 41 36 40 40 46 48 40 46 46 42 42.4

16 11/14/2015 Ground Floor Column PH/P5 48 47 48 38 46 38 34 34 42 48 42 39 42.0

17 11/14/2015 Ground Floor Column PG/P1 41 44 44 46 36 42 39 44 42 44 46 42 42.5

18 11/14/2015 Ground Floor Column PG/P3 40 40 38 42 44 40 38 46 38 44 46 38 41.2

19 11/14/2015 Ground Floor Column PG/AZ 40 39 44 40 42 44 44 44 40 46 44 42 42.4

20 11/14/2015 Ground Floor Column PF/P1 38 44 45 48 46 38 40 38 46 42 52 40 43.1

21 11/14/2015 Ground Floor Column PF/P3 44 46 46 45 44 48 38 38 46 48 48 42 44.4

22 11/14/2015 Ground Floor Column PF/WP4 46 44 44 48 42 42 42 46 46 50 46 48 45.3

23 11/14/2015 Ground Floor Column PE/P3 40 42 48 42 40 46 45 40 41 48 45 46 43.6

24

25

26

27

28

29

30

31

32

33

34

35

36
PACE CIRCLE MIXED DEVELOPMENT PROJECT LAHORE:

Schmmit Hammer Test Results.

Project:- Pace circle Lahore.


Rebond Hammer Test Readings
Sr. Date Location Srtructure Type Grid
1 2 3 4 5 6 7 8 9 10 11 12 Avg.
1 11/16/2015 Basment 1 Rounded Columns PK/P3 52 54 48 56 56 52 50 54 56 52 52 54 53.0

2 11/16/2015 Basment 1 Rounded Columns PL/P3 52 48 52 44 34 50 52 52 48 46 46 46 47.5

3 11/16/2015 Basment 1 Rounded Columns PL/P2 40 44 46 46 48 52 52 48 48 48 44 44 46.7

4 11/16/2015 Basment 1 Rounded Columns PK/P2 54 55 50 48 52 52 48 52 42 50 55 52 50.8

5 11/16/2015 Basment 1 Column PM/P2,P3 44 44 50 50 52 48 50 52 54 54 46 50 49.5

6 11/16/2015 Basment 1 Column PL/P5 46 50 52 48 52 48 50 50 50 48 46 46 48.8

7 11/16/2015 Basment 1 Column PK/P5 48 50 52 50 46 46 54 52 42 52 52 46 49.2

8 11/16/2015 Basment 1 Column PJ/P5 46 50 46 52 52 48 50 40 46 46 50 42 47.3

9 11/16/2015 Basment 1 Column PJ/P2 54 52 46 54 54 52 52 50 50 52 50 52 51.5

10 11/16/2015 Basment 1 Column PJ/P1 54 46 52 50 52 52 54 52 52 52 44 52 51.0

11 11/16/2015 Basment 1 Column PK.PJ/P1 50 50 46 48 52 50 40 52 56 52 48 52 49.7

12 11/16/2015 Basment 1 Column PL,PM/P1 44 48 42 46 42 46 48 48 48 44 50 44 45.8

13 11/16/2015 Basment 1 Column PH/P1 52 52 46 50 52 54 52 52 50 48 52 54 51.2

14 11/16/2015 Basment 1 Column PH/P2 54 52 52 52 52 49 53 52 51 58 52 51 52.3

15 11/16/2015 Basment 1 Column PH/P3 46 48 40 44 46 46 46 45 49 48 47 50 46.3

16 11/16/2015 Basment 1 Column PH/P5 46 42 44 44 45 45 40 40 40 40 44 42 42.7

17 11/16/2015 Basment 1 Column PG/P1 52 56 54 55 53 52 52 54 56 53 48 52 53.1

18 11/16/2015 Basment 1 Column PG/P3 38 48 46 46 37 42 44 42 44 42 39 37 42.1

19 11/16/2015 Basment 1 Column PG/AZ 46 46 42 46 44 45 44 45 42 48 45 44 44.8

20 11/16/2015 Basment 1 Column PF/P1 52 52 51 54 55 49 53 59 55 52 54 55 53.4

21 11/16/2015 Basment 1 Column PF/P3 46 42 46 44 36 44 42 46 42 40 40 39 42.3

22 11/16/2015 Basment 1 Column PF/WP4 42 42 46 50 46 46 48 45 44 44 42 49 45.3

23 11/16/2015 Basment 1 Column PE/P3 52 53 52 49 51 46 54 46 44 48 46 46 48.9

24

25

26

27

28

29

30

31

32

33

34

35

36
PACE CIRCLE MIXED DEVELOPMENT PROJECT LAHORE:

Schmmit Hammer Test Results.

Project:- Pace circle Lahore.


Rebond Hammer Test Readings
Sr. Date Location Srtructure Type Grid
1 2 3 4 5 6 7 8 9 10 11 12 Avg.
1 11/17/2015 Basment 2 Rounded Columns PK/P3 56 56 54 55 56 54 52 55 54 53 52 55 54.3

2 11/17/2015 Basment 2 Rounded Columns PL/P3 54 49 51 51 52 54 51 49 50 53 48 53 51.3

3 11/17/2015 Basment 2 Rounded Columns PL/P2 53 56 49 54 49 51 51 50 51 54 49 49 51.3

4 11/17/2015 Basment 2 Rounded Columns PK/P2 51 52 54 54 56 50 53 55 48 47 46 53 51.6

5 11/17/2015 Basment 2 Column PM/P2,P3 53 49 49 46 51 52 30 52 50 49 43 52 48.0

6 11/17/2015 Basment 2 Column PL/P5 54 54 56 50 43 52 52 52 49 50 53 54 51.6

7 11/17/2015 Basment 2 Column PK/P5 54 54 46 43 43 46 54 54 50 56 54 52 50.5

8 11/17/2015 Basment 2 Column PJ/P5 47 50 51 46 48 43 54 51 42 51 44 44 47.6

9 11/17/2015 Basment 2 Column PJ/P2 56 56 54 56 53 48 52 56 49 48 54 54 53.0

10 11/17/2015 Basment 2 Column PJ/P1 48 56 55 46 52 53 56 54 52 46 58 53 52.4

11 11/17/2015 Basment 2 Column PK.PJ/P1 52 54 52 56 52 51 52 46 53 52 56 54 52.5

12 11/17/2015 Basment 2 Column PL,PM/P1 54 52 53 49 50 50 52 52 54 55 54 54 52.4

13 11/17/2015 Basment 2 Column PH/P1 52 55 54 54 57 54 52 46 48 54 54 52 52.7

14 11/17/2015 Basment 2 Column PH/P2 52 53 51 51 49 53 48 49 57 56 52 50 51.8

15 11/17/2015 Basment 2 Column PH/P3 44 45 48 49 53 55 53 51 51 49 48 54 50.0

16 11/17/2015 Basment 2 Column PH/P5 51 52 53 52 54 54 53 52 46 53 53 50 51.9

17 11/17/2015 Basment 2 Column PG/P1 54 49 48 49 54 53 54 50 53 46 50 50 50.8

18 11/17/2015 Basment 2 Column PG/P3 51 50 50 52 50 54 51 50 54 52 50 53 51.4

19 11/17/2015 Basment 2 Column PG/AZ 46 51 52 52 51 54 53 54 52 49 52 50 51.3

20 11/17/2015 Basment 2 Column PF/P1 54 52 52 54 46 56 53 49 52 51 53 55 52.3

21 11/17/2015 Basment 2 Column PF/P3 48 52 49 52 54 53 53 46 55 51 53 52 51.5

22 11/17/2015 Basment 2 Column PF/WP4 49 53 52 50 49 53 44 52 50 53 51 50 50.5

23 11/17/2015 Basment 2 Column PE/P3 54 54 53 52 52 54 53 49 51 51 54 48 52.1

24

25

26

27

28

29

30

31

32

33

34

35

36
PACE CIRCLE MIXED DEVELOPMENT PROJECT LAHORE:

Schmmit Hammer Test Results.

Project:- Pace circle Lahore.


Rebond Hammer Test Readings
Sr. Date Location Srtructure Type Grid
1 2 3 4 5 6 7 8 9 10 11 12 Avg.
1 11/17/2015 Basment 3 Rounded Columns PK/P3 49 49 54 50 50 54 49 52 53 55 50 48 51.1

2 11/17/2015 Basment 3 Rounded Columns PL/P3 53 55 53 54 52 54 44 46 54 51 46 58 51.7

3 11/17/2015 Basment 3 Rounded Columns PL/P2 55 46 50 52 52 49 48 49 52 54 52 45 50.3

4 11/17/2015 Basment 3 Rounded Columns PK/P2 50 49 56 44 49 52 53 49 46 51 51 53 50.3

5 11/17/2015 Basment 3 Column PM/P2,P3 50 53 51 49 52 53 45 47 53 52 44 45 49.5

6 11/17/2015 Basment 3 Column PL/P5 47 51 54 51 47 55 52 51 53 50 42 44 49.8

7 11/17/2015 Basment 3 Column PK/P5 50 54 50 51 44 50 54 52 54 55 48 46 50.7

8 11/17/2015 Basment 3 Column PJ/P5 36 44 50 50 46 40 46 41 52 50 48 53 46.3

9 11/17/2015 Basment 3 Column PJ/P2 51 51 50 54 50 54 56 52 56 48 53 53 52.3

10 11/17/2015 Basment 3 Column PJ/P1 40 44 56 44 49 44 38 46 42 47 52 38 45.0

11 11/17/2015 Basment 3 Column PK.PJ/P1 49 47 44 49 50 49 48 47 50 48 46 47 47.8

12 11/17/2015 Basment 3 Column PL,PM/P1 54 53 54 54 55 54 51 52 53 56 50 53 53.3

13 11/17/2015 Basment 3 Column PH/P1 49 39 50 50 40 45 50 46 44 49 50 48 46.7

14 11/17/2015 Basment 3 Column PH/P2 54 46 58 49 49 58 56 42 40 56 54 53 51.3

15 11/17/2015 Basment 3 Column PH/P3 54 49 51 56 50 56 52 50 51 50 54 49 51.8

16 11/17/2015 Basment 3 Column PH/P5 50 52 54 52 54 50 46 36 52 46 50 30 47.7

17 11/17/2015 Basment 3 Column PG/P1 51 51 54 52 44 51 49 54 47 48 48 56 50.4

18 11/17/2015 Basment 3 Column PG/P3 54 52 54 42 50 48 41 50 51 51 50 53 49.7

19 11/17/2015 Basment 3 Column PG/AZ 51 50 46 50 51 46 44 52 52 50 49 50 49.3

20 11/17/2015 Basment 3 Column PF/P1 50 54 53 46 53 51 49 51 47 47 50 53 50.3

21 11/17/2015 Basment 3 Column PF/P3 52 42 42 54 47 50 56 54 52 53 51 53 50.5

22 11/17/2015 Basment 3 Column PF/WP4 50 46 51 49 50 52 54 55 52 51 50 52 51.0

23 11/17/2015 Basment 3 Column PE/P3 55 52 51 52 54 51 52 51 52 54 51 46 51.8

24

25

26

27

28

29

30

31

32

33

34

35

36
PACE CIRCLE MIXED DEVELOPMENT PROJECT LAHORE:

Schmmit Hammer Test Results.

Project:- Pace circle Lahore.


Rebond Hammer Test Readings
Sr. Date Location Srtructure Type Grid
1 2 3 4 5 6 7 8 9 10 11 12 Avg.
1 11/18/2015 Basment 4 Rounded Columns PK/P3 47 52 52 53 50 52 54 49 48 50 51 49 50.6

2 11/18/2015 Basment 4 Rounded Columns PL/P3 52 53 53 47 52 49 50 51 46 52 50 50 50.4

3 11/18/2015 Basment 4 Rounded Columns PL/P2 54 51 42 52 48 52 54 52 54 53 49 51 51.0

4 11/18/2015 Basment 4 Rounded Columns PK/P2 50 54 50 51 54 52 51 40 46 50 52 50 50.0

5 11/18/2015 Basment 4 Column PM/P2,P3 52 49 49 48 52 50 51 50 49 54 46 53 50.3

6 11/18/2015 Basment 4 Column PL/P5 49 50 49 48 45 50 46 41 46 50 48 46 47.3

7 11/18/2015 Basment 4 Column PK/P5 44 48 42 49 48 49 42 44 42 44 46 48 45.5

8 11/18/2015 Basment 4 Column PJ/P5 48 49 47 42 48 39 43 45 40 40 40 40 43.4

9 11/18/2015 Basment 4 Column PJ/P2 53 53 50 50 56 47 56 53 50 54 54 51 52.3

10 11/18/2015 Basment 4 Column PJ/P1 50 56 52 56 50 50 51 53 50 50 53 54 52.1

11 11/18/2015 Basment 4 Column PK.PJ/P1 52 54 56 52 51 54 48 53 50 50 52 45 51.4

12 11/18/2015 Basment 4 Column PL,PM/P1 51 50 50 50 55 50 56 52 50 50 51 54 51.6

13 11/18/2015 Basment 4 Column PH/P1 52 51 54 52 52 52 54 54 49 42 50 51 51.1

14 11/18/2015 Basment 4 Column PH/P2 50 50 50 52 50 50 52 52 52 56 54 50 51.5

15 11/18/2015 Basment 4 Column PH/P3 50 55 53 54 37 47 51 50 50 50 54 53 50.3

16 11/18/2015 Basment 4 Column PH/P5 54 49 50 44 49 49 49 44 41 51 46 41 47.3

17 11/18/2015 Basment 4 Column PG/P1 55 54 50 51 52 52 53 53 51 52 52 51 52.2

18 11/18/2015 Basment 4 Column PG/P3 51 44 42 49 45 50 45 44 41 50 50 41 46.0

19 11/18/2015 Basment 4 Column PG/AZ 50 51 49 51 46 46 49 54 45 46 47 50 48.7

20 11/18/2015 Basment 4 Column PF/P1 49 49 40 42 51 55 41 45 45 49 41 50 46.4

21 11/18/2015 Basment 4 Column PF/P3 49 40 45 50 54 53 43 40 49 51 46 45 47.1

22 11/18/2015 Basment 4 Column PF/WP4 48 55 50 52 45 51 49 50 51 49 41 41 48.5

23 11/18/2015 Basment 4 Column PE/P3 47 42 52 50 49 48 48 49 48 49 51 49 48.5