You are on page 1of 1

DESCRIPTION UNIT COST

STRUCTURAL WORKS

CONCRETING 52,133
REINFORCING BARS 512,212

FORM WORKS AND FALSEWORKS 21,212,151

ARCHITECTURAL WORKS

CEILING FIBER CEMENT ON FURRING 24,561

DOORS ( FLUSH AND SOLID PANEL AND ALUMINUM) 25,000


ALUMINUM GLASS WINDOW(SLIDING AND FIXED) 39,350

WATER FROFING,CEMENT BASE 5,250


TILES (GLASZED AND UNGLAZED) 8,647

CEMENT PLASTER FINISH 32,318

MASONRY WORKS ( INCLUDING REBARS) 56,279


PAINTING WORKS 67,860
STEEL TRUSS 78,631
ROOFING 83,478

SANITARY AND PLUMBING WORKS

SEWER LINE WORKS 8,576


PLUMBING FIXTURES 11,890
WATER LINE 4,300

STORM DRAINAGE AND DOWNSPOUT 9,890

ELECTRICAL WORKS
CONDUITS, BOXES AND FITTINGS 5,798
WIRES AND WIRING DEVICES 17,000
PANEL BOARD WITH MAIN AND BRANCH BREAKERS 6,315
LIGHTING FIXTURES AND LAMPS 13,847

SUB- TOTAL 22,275,486


LABOR 262,102
GRAND TOTAL 22,537,588

You might also like