L/UL Bay 1 - New Canopy - 1

Metal roof Area 48.59262 m2

L/UL Bay 2 - New Canopy - 2

Metal roof Area 28.64676 m2

Submission price on 11 Ma

Appointed PE fee

Processing fee

Contractor is required to engage only accredited fabricator by SSSS


to carry out the work,
Quality plan shall be submitted to structural QP for verification & approval

Insurance

All steel used shall be class 1 material


(shall be obtained from reputable manufacturer with factory production control (FPC)
compliance certificate to BC1:2012 or latest edition.

All structural sections except hollow sections shall be hot rolled steel of grade s355 steel conforming to B.S. EN 100
B.S. 4-1 & B.S. EN 10056 unless otherwise stated.

All structural hollow sections shall be hot-finished conforming to BS EN 10210,


unless otherwise specified.

Unless otherwise stated, all structural steel shall be hot dipped galvanised to
80 microns and two coats of compatible zinc-rich paint shall be applied to exposed steel surfaces

Bolts

Steel - testing work


Visual inspection to be carried out on all atructural members & 100% on weld & joints
All welds shall be visually inspected in accordance with BS EN 970 before chosen for testing
Minimum of 10% of the total number of fillet welded joint shall be chosen for testing.

All butt welded joints shall be tested, especially for key structural members.
Painting work
All structural steel delivered to site must be prepared against corrosion
with 1 coat of priner and 2 coats of epoxy paint/ PU paint subjected to
Architect/ Structural QP's selection/approval

Structural drawings

M&E works

Fire Protection

Modification of existing sprinkler points

Relocation sprinkler points

Additional new sprinkler points

Drain-off water and recharge water for the affected fire sprinkler system

Site coordination with main / sub-contractor and client

PE endorsement, authority submission and RI fee


and other necessary works to get FSC/TOP

(e.g. update existing mimic panel….)

Fire drawings

Lighting

LED light fittings for the extended part of canopy c/w new wiring, conduits, truking and termination to existing DB
LED light fittings shall match with existing light fittings (recessed downlight) type in the canopy
both canopies shall be connected to existing lighting DB's,
DB-01-LP1 & LP2 respectively
Provisions shall be made for additional breakers if there no sufficient spare
breakers at existing lighting DB's.

Lighting drawings

LEW services - Endorsed as built drawings, supervision and turn on power supply

Existing building LEW fee to paid


Lightning

Earth pit and bond to steel structure affested by canopy extension (include excavation)

PE certified design approval and certificate of supervision of lightning


protection required

Man power 2 man 2 days

Lightning drawings

Architectural requirements

Metal roofing system from a single manufacturee have a proven track record and relevant ISO 9000 certification
(Aluminium profiled roofing)
(Movements, dead loads, live loads, deflections, weather and water resistance, wind pressure,
fire safety, testing, deviation from lines, planes and verticallity shall be limited to long wave formations of averag
2mm for every 1000mm run, with maximum amplitude of 3mm at any single point.

(copies of quality certification for the company e.g. ISO 9001.


detail and track record of the installer who should be an approved installer
for the proposed manufacturer.)

Shall include all other aluminium extrusions, including tolerance clips, gable and clips,
channels, drip angles, zed spacers and any other components necessary for total roofing system
Extruded profiles shall be aluminium alloy to 6061-T6 or 6063-T5.

Seal all penetration with an appropriate proprietary pipe sleeve flashing for water-
tightness as recommended by the manufacturer
match the existing canopy at loading/ unloading bay in terms of color and finish, so Provide a seamless connection
in addition, the protective coating shall meet the requirements of SS 631

Bracings to be added to the supporting frame around all openings and penetrations
e.g. skylights, M7E services, etc.

All accessories e.g, ridge capping, flashing, pipe sleeves, clamps, purlins, insulation,etc., necessary for a complete m

Deeds of indemnity and warranty


Metal roofing system 10 years
Painting System doe structural works 11 years
$ 76,800.00

$ 48,316.20 $ 48,300.00

77.23938 $ 28,483.80 $ 28,400.00

ubmission price on 11 Mar 2020 $ 76,700.00

conforming to B.S. EN 10025,


1 lot $ 2,500.00

1 lot $ 1,000.00

13 nos. $ 180.00

1 lot $ 800.00

1 lot $ 1,000.00

1 lot $ 1,500.00

1 lot

rmination to existing DB 12 $ 150.00

1 lot

1 lot

1 lot
2 lot $ 2,000.00

1 lot

1 lot $ 720.00

1 lot

nt ISO 9000 certification 77.2393751 m2 $ 250.00

wave formations of average

de a seamless connection

ecessary for a complete metal roof is deemed included in the tender.


1 lot
1 lot

90%

85%
$ 994.31

$ 10,000.00

$ 7,500.00

$ 2,000.00

$ 2,000.00

$ 15,000.00

$ 2,000.00

$ 500.00
$ 3,000.00

$ 2,500.00

$ 1,000.00

$ 2,340.00

$ 800.00

$ 1,000.00

$ 1,500.00

Included

$ 1,500.00

$ 1,800.00

$ 1,500.00

$ 2,000.00

$ 1,000.00
$ 4,000.00

$ 2,000.00

$ 720.00

$ 1,000.00

$ 19,309.84
$ 3,000.00
$ 1,500.00

$ 90,469.84 $ 1,171.29

$ 81,422.86 $ 1,054.16

$ 76,899.37 $ 995.60