RCC MIXTURE DESIGN : COMBINED AGGREGATE GRADATION Tx2MixDes.xls::38014.

585162
Steps to Follow
PROJECT NAME: MIX DESIGN DATE: 1. Enter in Aggregate information and gradation information in Columns D through Q and Lines 13 through 36
PROJECT DESCRIPTION: LETTING DATE: 2. Enter in the Combined Grading Specification in Columns AJ through AO. 12 is for 1/2" Maximum rock, 34 3/4" m
CITY: MIX DESIGN STATUS: 3. Enter in Column T, Line 17 the Aggregate Size gradation specification you want to follow, either 12, 34, or 1
COUNTY: MIX DESCRIPTION: 4. In Columns D through J, and Lines 40-46 enter in up to 7 different combinations of aggregates you would like to
STATE: PLANT TYPE: 5. In Column G, Line 37 Enter the Aggregate combination (1 through 7) that you would like to see plotted.
OWNER: MATERIAL USE: 6. Once you decided on the final combination, Put that number in according to Step #5, and move to Mix Design Ta
COURSE\LIFT:

BIN FRACTIONS
Bin Number Bin No.1 Bin No.2 Bin No.3 Bin No.4 Bin No.5 Bin No.6 Bin No.7
Aggregate Producer: Producer 1 Producer 1
Quarry Location: A A
Aggregate Type: #67, limestone #89, limestone
Aggregate Name / Size: 3/4 L 3/8 L Top Agg Size
Additional Description: Combined Gradation 34
Total Bin

Cumulative %
Individual %
Retained

Retained
Individual Bin (%): 25.0 Percent 30.0 Percent 0.0 Percent 0.0 Percent 45.0 Percent 0.0 Percent 0.0 Percent 100.0%
Lower & Upper
Specification Limits Sieve Size
Sieve Size: Cum.% Wtd Cum. Cum.% Wtd Cum. Cum.% Wtd Cum. Cum.% Wtd Cum. Cum.% Wtd Cum. Cum.% Wtd Cum. Cum.% Wtd Cum. Cum. % Within
Sieve Size: (mm) Passing % Passing % Passing % Passing % Passing % Passing % Passing % Passing Spec's

1" 25.000 100.0 25.0 100.0 30.0 0.0 0.0 0.0 0.0 0.0 55.0 No 100.0 100.0 45.0 45.0 1"
3/4" 19.000 93.0 23.3 100.0 30.0 0.0 0.0 0.0 0.0 0.0 53.3 No 90.0 100.0 1.8 46.8 3/4"
1/2" 12.500 50.0 12.5 100.0 30.0 0.0 0.0 0.0 0.0 0.0 42.5 No 70.0 90.0 10.8 57.5 1/2"
3/8" 9.500 23.0 5.8 98.0 29.4 0.0 0.0 0.0 0.0 0.0 35.2 No 60.0 85.0 7.4 64.9 3/8"
No. 4 4.750 9.0 2.3 53.0 15.9 0.0 0.0 0.0 0.0 0.0 18.2 No 40.0 65.0 17.0 81.9 No. 4
No. 8 2.360 6.0 1.5 10.0 3.0 0.0 0.0 0.0 0.0 0.0 4.5 No 30.0 52.0 13.7 95.5 No. 8
No. 16 1.180 2.5 0.6 8.0 2.4 0.0 0.0 0.0 0.0 0.0 3.0 No 20.0 40.0 1.5 97.0 No. 16
No. 30 0.600 1.5 0.4 6.0 1.8 0.0 0.0 0.0 0.0 0.0 2.2 No 14.0 31.0 0.9 97.8 No. 30
No. 50 0.300 0.5 0.1 5.0 1.5 0.0 0.0 0.0 0.0 0.0 1.6 No 8.0 22.0 0.5 98.4 No. 50
No. 100 0.150 0.3 0.1 3.0 0.9 0.0 0.0 0.0 0.0 0.0 1.0 No 6.0 18.0 0.7 99.0 No. 100
No. 200 0.075 0.2 0.1 1.0 0.3 0.0 0.0 0.0 0.0 0.0 0.4 No 2.0 8.0 0.6 99.7 No. 200
LA Abrasion
Sodium Soundness Power 45 Statistics Sum Avg Max
Bulk SSD SG 1" Difference 266.5 24.2 45.0
Apparent SG 3/4" Difference 316.9 27.2 46.8
Aggregate Combination Selection 1 1/2" Difference 294.3 32.7 57.5
Aggregate Combination Recommendations RCC Aggregate 45 Power Gradation
Percent Passing (%)

Bin # Aggregate Name 1 2 3 4 5 6 7


100.0

Percent Passing (%)


1 3/4 L 25.0 RCC 100.0
2 3/8 L 30.0 90.0
Spec Upper Limit
3 0 Spec Lower Limit
90.0
80.0
4 0 3/4 in Power 45 80.0
5 0 45.0 70.0
1/2 in Power 45
6 0 70.0
60.0 1 in Power 45
7 0 60.0
Sum 100 0 0 0 0 0 0 50.0
50.0
40.0
Recommendations Combination # 40.0
Recommendation #1 30.0
30.0
Recommendation #2 20.0
Recommendation #3 20.0
10.0
10.0
Prepared By: Completed Date: 0.0
# 50 # 30 #16 #8 #4 3/8" 1/2" 3/4" 1" 0.0
#200 #100
1
#

Page 1 Sieve Size


Percent Passing (%) RCC Aggregate 45 Power Gradation

100.0

RCC
90.0 Spec Upper
Limit
Spec Lower
80.0 Limit
3/4 in Power
45
70.0 1/2 in Power
45
1 in Power 45
60.0

50.0

40.0

30.0

20.0

10.0

0.0
#200 #100 # 30 #16 #8 #4 3/8" 1/2" 3/4" 1"
# 50
Sieve Size
RCC Aggregate Gradation Chart

#16 #4 3/8" 1/2" 3/4" 1"


100.0

90.0
Percent Passing (%)

80.0

70.0

60.0

50.0
RCC
Upper Limit
40.0 Lower Limit

30.0

20.0

10.0

0.0
0.0 3.0 6.0 9.0 12.0 15.0 18.0 21.0 24.0
Sieves (mm)
RCC MIXTURE DESIGN : VOLUME CALCULATIONS

PROJECT NAME:
MIX DESCRIPTION:
PLANT TYPE:
MATERIAL USE:

Mix Quantities Calculated


Max Dry Density (lbs/CF) 145.0 Input
Max Wet Density (lbs/CF) 152.8
Optimum % Moisture 5.4% Per CY (lbs)
Coarse Aggregate absorption % 1.1% 9.5 Bin # Aggregate Name
Intermediate Aggregate absorption % 1.1% 11.4 1 3/4 L
Sand #1 absorption % 1.7% 26.5 2 3/8 L
Sand #2 absorption % 0.0% 0.0 Per Test Batch (lbs) 3 0
Coarse Aggregate Moisture % 1.8% 15.6 15.6 4 0
Intermediate Aggregate Moisture % 1.8% 18.7 18.7 5 0
Sand #1 Moisture % 5.8% 90.4 90.4 6 0
Sand #2 Moisture % 0.0% 0.0 0.0 7 0
% Cementitious 11.5% 13.0%
% Cement 11.5% 13.0%
% Fly Ash (of cement replace) 0.0% 0.0%
Target CA % 3/4 L 25 1
Target Intermediate % 3/8 L 30 2
Target Sand #1 % 0 45 5
Target Sand #2 % 0 0 6
Sand / Agg 30% 30%

Batch Size (CF) 27 Initial Mix Design Adjusted Mix (Manual Input)

Batch Weight Batch Weight Specific Gravity Absolute Volume Batch Weight (SSD) Absolute Volume
Ingredient (Dry) (lbs/CY) (SSD) (lbs/CY) (SSD) (CF) (lbs/CY) (CF)
Cement 450 450 3.150 2.289 450 2.289
Fly Ash 0 0 2.910 0.000 0 0.000
Coarse 3/4 L 866 876 2.680 5.237 876 5.237
Intermediate 3/8 L 1040 1051 2.630 6.404 1051 6.404
Sand #1 0 1559 1586 2.650 9.590 1586 9.590
Sand #2 0 0 0 2.570 0.000 0 0.000
Total Water content (lbs) 211 211 211
Total Water content (Gal) 25.4 25.4 25.4
Water in Aggregates (lbs) 124.7 47.5 47.5
Water in Aggregates (Gal) 15.0 5.7 5.7

Water added by Plant (Free Water) (lbs) 86.7 163.9 1.000 2.627 163.9 2.627
Water added by Plant (Gal) 10.4 19.7 19.7
Additional Water added by plant % 0.00%
Final Water content by Plant (%) 5.40% 5.40% 5.40%
Additional Water by plant (Gal) 0.0
Additional Water by plant (lbs) 0.0 1.000 0.000
Final water by Plant (lbs) 86.7
Final Water by Plant (Gal) 10.4
Total Water (lbs) 211.41

Total Wet Weight (lbs/CF) 152.8 152.8 152.8


Total Dry Weight (lbs/CF) 145.0 145.0 145.0
Total Final Volume (CF) 26.147 26.147
Calculated Air Volume (CF) 0.853 0.853
Calculated % Air Volume 3.16% 3.16%
Water absorbed in Aggregates 47.47 48.15
Free Water 164 163
W/CM Ratio 0.36 0.36
Aggregate / Cement Ratio 7.70 7.81
S

% % Density Density
25 98 149.8
30 97 148.2
0 96 146.7
0 95 145.2
45 94 143.7
0 93 142.1
0 92 140.6
91 139.1

Test Batch Size (CY)


1
Test Batch Size (CF)
Mix (Manual Input) 27
Test Batch Test Batch Test Batch
Batch Weight (Dry) Weight Dry Absolute Wet Weight
(lbs/CY) (lbs) Volume (CF) (lbs)
450 450.0 2.289 450.0
0 0 0.000 0.0
866 866 5.180 881.8
1040 1040 6.334 1058.2
1559 1559 9.429 1649.7
0 0 0.000 0.0
211 211 211.4
25.4 25.4
124.7 124.74
15.0 15.0

86.7 86.67
10.4 10.4
5.40%

0.0 0.000 0.0


86.7 86.7
10.4 10.4
211.4 211.4

152.8
145.000 145.0
23.233
3.767
13.95%
47
164
0.36
4.24