Problem
The Mazar Hydroelectric project is part of Ecuador’s energy
plan to generate power from the middle section of the Paute
River in South-East Ecuador. A first phase was completed in
1983, providing over 1000MW. This second phase was to be
constructed upstream of Phase 1, and would provide nearly
200MW.
Client:
HIDROPAUTE S.A.
Main contractor:
IMPREGLIO / HERDOIZA CRESPO JV
Designer / Engineer:
CAMINOSA / TRACTEBEL
Products used:
WIRAND FS3N
Date of project: Diversion tunnel under construction
2005 to 2007
Detail of shotcrete face in conjunction with soil nails
Project Details
Tunnel length: 1.2km diversion tunnel
Internal dimensions: 12m x 12m
Wirand FF3N SFRC solution: 45 kg/m³