You are on page 1of 15

Republic of the Philippines

BATANGAS STATE UNIVERSITY


Gov. Pablo Borbon Campus II, Alangilan Batangas City, Philippines 4200
College of Engineering, Architecture & Fine Arts
www.batstate-u.edu.ph Tel. No. (043) 425-0139 loc. 118

Civil & Sanitary Engineering Department

Masterlist
1. Ablan, April Joy G.
2. Advincula, Darwin Clyde E.
3. Albina, Mariana V.
4. Ampil, Irish Vera R.
5. Asi, Mariane K.
6. Arguelles Vince Lorenz
7. Babao, Sydney G.
8. Benedicto, Marvin S.
9. Blay, Allen Joy D.
10. Buenviaje, Jessica Mae M.
11. Caber, Jainelyn Dee S.
12. Canonoy, Lyndsey Ruth D.
13. Carandang, Aerol M.
14. Chavez, Maria Nilen D.
15. Concepcion, Nichol Arron C.
16. Delfin, Aira Joy S.
17. De Torres, John Revin L.
18. Enriquez, Floriedhel
19. Fameronag, Johann P.
20. Fiscal, Edu Nichol S.
21. Geron, Glecy R.
22. Guico, Trixia Abigail Q.
23. Gutierrez, Ma. Jamie Belle A.
24. Hernoso, Ian Paul C.
25. Laredo, Kevin Judd P.
26. Lascano, Eirol Joel D.
27. Lualhati, Christopher Lloyd O.
28. Macatangay, Mary Rose D.
29. Matienzo, Arlou Jane D.
30. Medrano, Janet B.
31. Nabua, Rosabel D.
32. Osanastre, Xer Zes C.
33. Palas, Alyanna Kate
34. Panopio, Mark Angelo D.
35. Porlaje, Nelmar P.
36. Recinto, Jesusa T.
37. Tiemsim, Renjill A.
38. Vardaraju, Sahkeina B.
39. Villafranca, Klarabelle B.
40. Villanueva, Jimlovell V.
Republic of the Philippines
BATANGAS STATE UNIVERSITY
Gov. Pablo Borbon Campus II, Alangilan Batangas City, Philippines 4200
College of Engineering, Architecture & Fine Arts
www.batstate-u.edu.ph Tel. No. (043) 425-0139 loc. 118

GROUP 2

Location: Ralph G. Recto Building.

4 3

2
5
6 1
7 9

10

8
Minimum Maximum Average
Location Temperature
Remarks Temperature Temperature Temperature
Point (ᵒC)
(ᵒC) (ᵒC) (ᵒC)
Left front of RGR
1 beside Octagon 34.5 34.5 34.9 34.9
(near tree, soil)
Walkway ( going to
RGR in front of
2 40.6 39.6 40.7 40.7
STAAD Comp.
Lab./concrete)
Walkway
( approximately 7
3 36.8 34.6 37.7 37.7
meters away from
Point 2 / concrete)
Open space (near
4 tree beside CICS 31.3 30.9 31.5 31.5
study hall / soil)
Near or just across
5 Hydraulics and Soil 32.9 32.9 33.1 33.1
Lab. / soil)
Near tree in Front
6 of Hydraulics Lab. 27.0 26.9 27.0 27.0
(gravel)
Near ramp railings
7 on the right side of 25.6 25.4 26.0 26.0
RGR (soil)
Right side of RGR
8 near deep well 25.4 25.4 25.8 25.8
(grass)
Front of STAAD
9 Comp. Lab. near 24.3 24.1 24.5 24.5
trash bin (soil)
Beside CE/SE
Universal Testing
10 27.7 26.8 27.7 27.7
Machine Room
(sand)

LOCATION POINTS
Location Point 1
Location Point 2

Location Point 3 Location Point 4


Location Point 5 Location Point 6

Location Point 7 Location Point 8


Location Point 9 Location Point 10
GROUP 3

Location: Back of Ralph G. Recto Building.

Minimum Maximum Average


Location Temperature
Remarks Temperature Temperature Temperature
Point (ᵒC)
(ᵒC) (ᵒC) (ᵒC)
Wood chips, leaves
1 29.5 29.2 30.1
and Conrete
Under the tree,
2 28.2 28.2 28.4
Concrete
Concrete with
3 31.5 31.1 31.7
wood chips
Near tree, sunlight,
4 36.9 36.2 37.3
soil
5 Dried leaves 31.7 31.7 31.9
Vegetation, Soil,
6 32.4 32.0 32.6
sunlight
Dried leaves with
7 28 28.0 28.6
vegetation
8 Pile of cut woods 33.1 32.6 33.3
Grass, cut woods,
9 27.4 27.4 27.6
soil
MRF, Dried Leaves
10 26.8 26.7 26.9
and concrete
GROUP 5 – Temperature Sensor
Location: CICS Building
Minimum Maximum Average
Location Temperature
Remarks Temperatur Temperature Temperature
Point (ᵒC)
e (ᵒC) (ᵒC) (ᵒC)
Under the trees,
1 25.9 26.4 26.4
with rocks and soil
Near maroon
tables and chair,
2 27.1 27.5 27.3
with rocks, under
the covered area
With wet land,
3 24.6 26.2 24.9
near a licking pipe
With direct
sunlight, under the
4 35.6 35.8 35.8
water tank, near
many trees
At the back of the
CICS Building,
with a grassy area,
5 29.9 30.2 30.0
with the light of
the sun and a
muddy place
At the back of the
CICS Building,
near air condition,
6 28.8 28.4 28.4
with the light of
the sun and a
grassy area
At the concrete
7 pathway, with 27.1 29.3 29.1
pebbles and dusts
Grass area with
8 25.5 25.7 25.5
flowers
Concrete stairs,
9 under the roof of 26.7 27.3 26.9
the building
CICS Building,
middle portion of
10 26.9 27.1 26.9
the ground floor
with white tiles
GROUP 6 – Temperature Sensor
Location: CIT
Time started: 5:46 pm Time ended:
5:56 pm

10

8 7

5
4

Minimum Maximum Average


Location Temperature
Remarks Temperature Temperature Temperature
Point (ᵒC)
(ᵒC) (ᵒC) (ᵒC)
Maroon
pavement
near the trees
1 30.0 29.9 30.0 30.0
(formerly
lightened by
the sun)
Grass area,
2 near the 25.0 24.6 25.1 24.9
machine room
3 Small 25.0 24.9 25.2 25.0
flowering
plants with
rocks
Corner of the
4 stairs, grassy 25.7 25.2 26.1 25.7
area
Maroon tiles
5 at stairs (3rd 29.2 29.1 29.2 29.2
step)
Gray tiles at
middle portion
6 of front of CIT 29.4 29.2 29.5 29.4
Bldg. stair (1st
step)
Maroon
7 pavement 28.6 28.5 28.7 28.6
with grass
Grass area
8 (wetted 24.2 24.2 24.7 24.4
grass)
Parking area
with red-
9 28.7 28.3 28.7 28.6
brownish
rocks
White sand
10 29.2 29.2 29.6 29.3
with gravels

LOCATION POINTS

Location Point 1 Location Point 2


Location Point 3 Location Point 4

Location Point 5 Location Point 6


Location Point 7 Location Point 8

Location Point 9 Location Point 10


GROUP 7 – Temperature Sonar
Location: Along the garden outside of Batangas State University, Alangilan Campus

Time Started: 5:10 pm Time Finished: 5:25 pm

Minimum Maximum Average


Temperature
Location Point Remarks Temperature Temperature Temperature
(°C)
(°C) (°C) (°C)
Cement
1 33.7 33.3 33.7 33.4
Pavement
Soil, Garden
2 27.8 27.7 28 27.8
Plants
Cement
3 34.7 34.6 34.7 34.7
Pavement
Soil, Garden
4 Plants, Tree, 31 30.6 32.6 31.8
Shaded
Cement
5 25.3 25.2 25.4 25.3
Pavement
Cement
6 31.3 31.1 31.3 31.2
Pavement
Cement
7 28.1 27.9 28.2 28.1
Pavement
Cement
8 28.5 28.4 28.7 28.6
Pavement
Cement
9 Pavement, Tree, 29.6 29.6 29.7 29.7
Shade
Cement
10 Pavement, 31.7 31.5 31.8 31.7
Shaded