You are on page 1of 28

SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
I. Excavation items (R2-SE-1-1 to R2-SE-1-5-a) for Sewerage
Project Works only
Excavation in all types of soils (for sewerage works),such as
Earth, Marine clay, Marshy land, Running sand, Garbage, Slush,
Murum, Rock boulders etc as directed by the engineer. The rate
includes dewatering, backfilling, removing the rank vegetation and
removing the excavated materials within a lead of 150M as directed
including levelling, ramming,etc complete, and measured from the
edge of cutting including all lifts and stacking in layers and removing
R2-SE-1-1 468
the surplus excavated materials as directed for lift upto 2M{Records
to be maintained properly}.The rate also includes supporting public
utilities such as cables,drains,pipe water mains, but shall not include
the cost of shoring etc as specified and directed.
1) The rate includes the handling/supporting the existing utilities
such as cables, drains, pipes, water mains etc.
2) It also includes the royalty and other taxes if any.
cum
R2-SE-1-1-a -do-do- as per item R2-SE-1-1 for lift from 2m to 4.0m cum 638
R2-SE-1-1-b -do-do- for lift from 4.0m to6m cum 868
R2-SE-1-1-c -do-do- for lift from 6.0m to8m cum 1036
R2-SE-1-1-d -do-do- for lift from 8.0m to10m cum 1233
R2-SE-1-1-e -do-do- for lift from10m to11m cum 1360
R2-SE-1-1-f -do-do- for lift from 11m to12m cum 1497
R2-SE-1-1-g -do-do- for lift from 12m to13m cum 1646
R2-SE-1-1-h -do-do- for lift from 13m to14m cum 1807
R2-SE-1-1-i -do-do- for lift from 14m to15m cum 1983
Extra over above for item no. R2-SE-1-1 to R2-SE-1-1-i for relevant
lift of excavation in soft/ disintegrated rock, road
carriageway,sand stone, stiff clay, gravel, cobblestone, hard laterite,
R2-SE-1-1-j water bound macadam, wet mix macadam, asphalt mix carpet of 429
any type, pitching, soling, paths and hardcore, lime concrete, plain
cement concrete, stone masonry and all types of brick/ block
masonry below ground level cum
Extra over above for item no. R2-SE-1-1 to R2-SE-1-1-i for relevant
lift of excavation in hard rock by controlled blasting with necessary
R2-SE-1-1-k safety precautions as per statutory requirement, including drilling, 1130
breaking in small pieces, mucking, dressing/ trimming the sides,
leveling/ grading of bottoms, etc. cum
R2-SE-1-1-l -item deleted-
R2-SE-1-1-m -item deleted-
R2-SE-1-1-n -item deleted-
R2-SE-1-1-o -item deleted-
R2-SE-1-1-p -item deleted-
R2-SE-1-1-q -item deleted-
R2-SE-1-1-r -item deleted-
R2-SE-1-1-s -item deleted-
R2-SE-1-1-t -item deleted-
Extra over above for item no. R2-SE-1-1 to R2-SE-1-1-i for relevant
lift of excavation in hard rock and reinforced concrete by chiseling
R2-SE-1-1-u for sewerage works by manual operations, pneumatic breaker, 2100
hammer, driller, compressor breaker, etc. including
dressing/trimming the sides, leveling of bottoms, cum
R2-SE-1-1-v -item deleted-
R2-SE-1-1-w -item deleted-
R2-SE-1-1-x -item deleted-
R2-SE-1-1-y -item deleted-
R2-SE-1-1-z -item deleted-

1 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
R2-SE-1-1-aa -item deleted-
R2-SE-1-1-ab -item deleted-
R2-SE-1-1-ac -item deleted-
R2-SE-1-1-ad -item deleted-
Extra over above for item no. R2-SE-1-1 to R2-SE-1-1-i for relevant
R2-SE-1-1-ae lifts of excavation in hard rock and reinforced concrete by splitter 4970
machine cum
[Note: sanction of director/DMC (SE)/DMC(E) should be obtained for
including the item in BOQ during the approval of Draft Tender]

Providing watching fencing etc. to trench excavation per running


R2-SE-1-2 meter length of trench as per drawing and as directed by Engineer. m 410

R2-SE-1-3 Transporting surplus materials upto 3 Km. including levelling. cum R2-CS-EW-8
[Note : Prior Specific sanction of Head of Deptt. should be taken if
transportation is to be done at night i.e. between 8.00 pm. to 6
am.and the rate should be reduced by 10%] {This item will be
operated with the specific sanction of the C.E./Chief Engineer and
above}

[Note : Prior Specific sanction of Head of Deptt. should be taken if


transportation is to be done at night i.e. between 8.00 pm. to 6 am.
and the rate should be reduced by 10%]
R2-SE-1-3-a E.O. above for transporting beyond 3 km. for every 1 km. cum R2-CS-EW-9
[Note : Prior sanction of Head of Deptt. should be taken if
transportation is to be done at night i.e. between 8.00 p.m to 6 a.m.
and the rate should be reduced by 10%]
Providing and removing close shoring and strutting in the trenches/
pits for all depths as per specifications/ drawings and or as directed
R2-SE-1-4 by Engineer-in-charge by including walling, struts, open poling sq.m 715
boards, horizontal sheeting, runners, dog spikes by using timber etc.
complete.
Providing and removing closed shoring and strutting in the
trenches/ pits for all depths as per specifications/ drawings and or as
cum of
R2-SE 1-4-b directed by Engineer-in-charge by including walling, struts, open 8586
wood
poling boards, horizontal sheeting, runners, dog spikes by using
timber etc. complete.
R2-SE-1-5 Leaving shoring in trenches. (New or old) including dog spikes. sq.m 1372
Leaving shoring in trenches. (New or old) including dog spikes. cum of
R2-SE-1-5-a 15561
wood
Providing and leaving of close shoring and strutting in the trenches/
pits for all depths in running sand as per specifications/ drawings
and or as directed by Engineer-in-charge by including walling, struts,
open poling boards, horizontal sheeting, runners, dog spikes by
R2-SE-1-5b using timber (New or old) etc. complete. sq.m 1032
[Note: sanction of director/DMC (SE)/DMC(E) should be obtained for
including the item in BOQ during the approval of Draft Tender]

Providing and leaving of close shoring and strutting in the trenches/


pits for all depths in running sand as per specifications/ drawings
and or as directed by Engineer-in-charge by including walling, struts,
open poling boards, horizontal sheeting, runners, dog spikes by
cum of
R2-SE-1-5-c using timber (New or old) etc. complete. 11709
wood
[Note: sanction of director/DMC (SE)/DMC(E) should be obtained for
including the item in BOQ during the approval of Draft Tender]

2 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
Providing and fixing M.S plate shoring in trench consisting of 12mm
R2-SE-1-6 thick M.S sheet, 1.5m wide MS channel 150x75mm,at 1.5m center sq.m 2798
to centre including removal after laying sewer

3 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
II. CONCRETOR
Note : a) Unless or otherwise stated the coarse aggregate shall
consist of metal 10 mm and 20 mm size (metal No.1 & 2) mixed in
equal proportion or as directed and the rates shall cover the cost of
complete work including boxing, ramming, consolidating, watering
and curing.
b) In controlled concrete the determination of the proportions of
cement ,aggregate and water to attain the required strength shall be
made with the preliminary test by designing the concrete mix.

c) All the concrete items include vibrating by Mechanical vibrator.

d) In case controlled concrete cannot be used for want of testing due


to small quantity of work M 10 may be taken as equivalent to 1:3:6

M 15 = 1:2:4
M 20 = 1: 1 1/2 : 3
Providing & laying M 10 c.c. For foundation/bedding including
R2-SE-2-1 cum 6122
boxing, curing etc. complete as specified and as directed.
R2-SE-2-2 -do- -do- for full encasement or cradle -do- -do- cum 6822
R2-SE-2-3 -do- -do- in saddle block -do- -do- cum 7337
-do- -do- M 15 c.c. In foundation including boxing, curing etc.
R2-SE-2-4 cum 7335
complete as specified and as directed.
R2-SE-2-5 -do- -do- M 15 c.c. For full encasement or cradle -do- -do- cum 7354
R2-SE-2-6 -do- -do- in sides and haunches and/or in block coping-do- -do- cum 8067
R2-SE-2-7 do- -do- in saddle block -do- -do- cum 7850
R2-SE-2-8 -do- -do- in arch work -do- -do- cum 8355
R2-SE-2-9 Providing and laying M 20 c.c. In foundations -do- -do- cum 7863
-do- -do- in sides and haunches and /or block coping -do- -do-
R2-SE-2-10 cum 8575
R2-SE-2-11 -do- -do- in arch work -do- -do- cum 8863
REINFORCED CONCRETOR
Note: 1. Wastage in cutting will not be paid for. Only steel actually
fixed in position will be paid by linear measurement including hooks
& bends. No payment will be made for binding wires, pins be made
for binding wires, pins, chairs and laps and / or welding and this
should be noted while quoting the rates.
2. In working out the rates for .R.C.C. Items and steel
reinforcement, the basic rates for steel bars per tonne are taken as
mentioned in Basic Material Master, If steel is controlled in future
the necessary adjustment between the controlled rate and the rates
stated above will have to be made.
3. Note of concretor: (b) is applicable here(controlled concrete).
Providing M 15 R.C.C. Work in dhapas, beams and slabs etc. with
standard reinforcement of 1% including centering etc. and finished
R2-SE-2-12 cum 12407
smooth the exposed surface with cement sand plaster 12 mm thick
in the proportion 1:2 as directed.
R2-SE-2-13 -do- without reinforcement -do- do- cum 9110
R2-SE-2-14 -do- M20 RCC work-do- as per item no R2-SE-2-12 cum 12915
R2-SE-2-15 -do- without reinforcement -do- do- cum 9618

4 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
III. MASONRY
(A) Brick Masonry
Providing sewer brick masonry in cement mortar 1:6 as specified &
R2-SE-3-1 as directed. (For Sewerage Substructure Works only) cum 11594

R2-SE-3-2 -do- -do- 1:5 -do- do cum 11670


R2-SE-3-3 -do- -do- 1:4 -do- do cum 11723
R2-SE-3-4 -do- -do- 1:3 -do- -do- cum 11859
R2-SE-3-5 -do- -do- 1:2 -do- -do- cum 12121
R2-SE-3-6 -do- -do- 1:1 -do- -do- cum 12540
Brick work with common burnt clay F.P.S. (non modular) bricks of
class designation 7.5 in superstructure above plinth level upto floor
R2-SE-3-7 cum R2-CS-MW-3-a
five level in all shapes and sizes in :
Cement mortar 1:3 (1 cement : 3 coarse sand)
R2-SE-3-7a Cement mortar 1:4 (1 cement : 4 coarse sand) cum R2-CS-MW-3-b
R2-SE-3-7b Cement mortar 1:6 (1 cement : 6 coarse sand) cum R2-CS-MW-3-c
Brick work in cement mortar (1:3) in manholes, plastered both inside
R2-SE-3-8 cum 14142
& outside with 20mm thick cement & sand plaster(1:2).
(B) Stone Masonry

Supplying blue trap stones of approved quality and providing the


same in rubble packing 250 mm thick to the required level & camber
R2-SE-3-9 filling in voids with chips and 60 mm metal etc. including spreading sq.m R2-RW 2.01
over the rubble 60 mm metal 75mm thick compacting to a thickness
of 50 mm by any means.
R2-SE-3-10 Uncourse rubble masonry in cement mortar (1:6) first sort. cum R2-CS-MW-18
R2-SE-3-11 -do- -do- (1:5) first sort. cum 6678
R2-SE-3-12 -do- -do- (1:4) -do- -do- cum 6695
R2-SE-3-13 -do- -do- (1:3) -do- -do- cum 6740
Uncourse rubble masonry in cement mortar (1:6) first sort using
R2-SE-3-14 cum 5780
municipal rubble
R2-SE-3-15 -do- -do- in cement mortar (1:5) -do- -do- cum 5805
Providing and Laying 230mm thick Rubble Stone for Pitching on
sloping ground or wherever directed, properly arranging and placing
the rubble stones to achieve a plane top surface, set in regular line &
slope, including breaking, laying gravel, quarry spells underneath
R2-SE-3-16 sq.m R2-CS-EW-24
and manually packing the voids with rubble chips, flush pointing with
cement mortar 1:4 up to 25mm deep, etc. complete as specified &
as directed.
(Note: The rate includes the royalty and other taxes if any)
Providing and Laying 230mm thick Rubble Stone for Pitching on
sloping ground or wherever directed, properly arranging and placing
the rubble stones to achieve a plane top surface, set in regular line &
slope, including breaking, laying gravel, quarry spells underneath
R2-SE-3-17 sq.m R2-CS-EW-25
and manually packing the voids with rubble chips, tuck pointing with
cement mortar 1:2 up to 25mm deep, etc. complete as specified &
as directed.
(Note: The rate includes the royalty and other taxes if any)

5 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
IV. PLASTERER
Providing 12 mm thick cement plaster in cement mortar 1:2
R2-SE-4-1 sq.m 262
including neat cement rendering.
-do- -do- with approved water proofing compound in a proportion as
R2-SE-4-2 specified by the manufacturers, per bag of cement. sq.m 271

-do- -do- 20 mm thick -do- -do- (without water proofing compound) -


R2-SE-4-3 sq.m 376
do- -do-
-do- -do- with approved water proofing compound in a proportion as
R2-SE-4-4 specified by the manufacturer's per bag of cement. sq.m 389

-do- -do- 25 mm thick -do- -do- (without water proofing compound) .


R2-SE-4-5 sq.m 504
-do- -do- 25 mm thick -do- -do- with approved water proofing
R2-SE-4-6 compound in a proportion as specified by the manufacturers per bag sq.m 520
of cement.
Providing 12 mm thick cement plaster in cement mortar 1:1
R2-SE-4-7 sq.m 296
including neat cement rendering.
-do- -do- 12 mm thick with approved water proofing compound in a
R2-SE-4-8 proportion as specified by the manufacturers per bag of cement. sq.m 309

-do- -do- 20 mm thick -do- -do- (without water proofing


R2-SE-4-9 sq.m 436
compound).
-do- -do- 20 mm thick with approved water proofing compound in
R2-SE-4-10 a proportion as specified by the manufacturers per bag of cement. sq.m 418

-do- -do- 25 mm thick -do- -do- (without water proofing compound)


R2-SE-4-11 sq.m 595
-do- -do- 25 mm thick with approved water proofing compound in
R2-SE-4-12 a proportion as specified by the manufcturers per bag of cement. sq.m 621

Extra for using approved water proofing compound in plaster work


R2-SE-4-13 Kg 45
in the ratio as per manufacturer's specifications.

6 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
V. PIPES
A Stoneware Pipes
Providing & laying stoneware pipes of SP2 class including jointing
R2-SE-5-1 with CM(1:1), filleting etc. complete as specified & directed.

R2-SE-5-1-a 150mm dia m 657


R2-SE-5-1-b 230mm dia m 1113
R2-SE-5-1-c 300mm dia m 1586

Providing & laying stoneware pipes of SP2 class including jointing


R2-SE-5-2
with rubber rings etc. complete as specified & directed.
R2-SE-5-2-a 150mm dia m 523
R2-SE-5-2-b 230mm dia m 963
R2-SE-5-2-3 300mm dia m 1312

Providing & laying stoneware bends of SP2 class including jointing


R2-SE-5-3 with CM(1:1), filleting etc complete as specified & directed

R2-SE-5-3-a 150mm dia No 301


R2-SE-5-3-b 230mm dia No 787
R2-SE-5-3-c 300mm dia No 1536
Providing & laying stoneware single junction of SP2 class including
R2-SE-5-4 jointing with CM (1:1), filleting etc complete as specified & directed

R2-SE-5-4-a 150mm dia No 413


R2-SE-5-4-b 230mm dia No 1024
R2-SE-5-4-c 300mm dia No 7122
Providing & laying stoneware double junction of SP2 class including
R2-SE-5-5 jointing with CM (1:1), filleting etc complete as specified & directed

R2-SE-5-5-a 150mm dia No 654


R2-SE-5-5-b 230mm dia No 1389
R2-SE-5-5-c 300mm dia No 10011
Providing & laying stoneware bends/tees of SP2 class including
R2-SE-5-6 jointing with rubber rings complete as specified & directed No

R2-SE-5-6-a 150mm dia No 257


R2-SE-5-6-b 230 mm dia No 734
R2-SE-5-6-c 300 mm dia No 1476
B RCC Pipes
Providing and laying R.C.C Pipe (NP3 Class) with collar joints
R2-SE-5-7 including jointing with CM(1:1) & filleting etc. complete as specified
and directed.
R2-SE-5-7-a 150mm dia m 962
R2-SE-5-7-b 200mm dia m 1314
R2-SE-5-7-c 250mm dia m 1663
R2-SE-5-7-d 300mm dia m 2201
Providing and laying R.C.C. Pipes (NP3 Class) with rubber rings
R2-SE-5-8
jointing etc. complete as specified and directed.
R2-SE-5-8-a 300mm dia m 1823
R2-SE-5-8-b 350mm dia m 2368
R2-SE-5-8-c 400mm dia m 2617
R2-SE-5-8-d 450mm dia m 2985
R2-SE-5-8-e 500mm dia m 3427
R2-SE-5-8-f 600mm dia m 4132

7 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
R2-SE-5-8-g 700mm dia m 5052
R2-SE-5-8-h 800mm dia m 6410
R2-SE-5-8-i 900mm dia m 7366
R2-SE-5-8-j 1000mm dia m 8974
R2-SE-5-8-k 1100mm dia m 11134
R2-SE-5-8-l 1200mm dia m 11825
R2-SE-5-8-m 1400mm dia m 14138
R2-SE-5-8-n 1600mm dia m 18436
R2-SE-5-8-o 1800mm dia m 20757
R2-SE-5-8-p 2000mm dia m 28238
R2-SE-5-8-q 2200mm dia m 36150
R2-SE-5-8-r 2400mm dia m 42825
C HDPE Pipes
Providing, Laying and Jointing HDPE pipes of PE-80 grade and PN-
R2-SE-5-9 6 class with butt joints etc.complete as specified and directed

R2-SE-5-9-a 160 mm dia (OD) m 983


R2-SE-5-9-b 200 mm dia (OD) m 1484
R2-SE-5-9-c 250 mm dia (OD) m 2232
R2-SE-5-9-d 280 mm dia (OD) m 2772
R2-SE-5-9-e 315 mm dia (OD) m 3470
R2-SE-5-9-f 355 mm dia (OD) m 4386
R2-SE-5-9-g 400 mm dia (OD) m 5655
R2-SE-5-9-h 450 mm dia (OD) m 7319
R2-SE-5-9-i 500 mm dia (OD) m 8999
R2-SE-5-9-j 560 mm dia (OD) m 11238
R2-SE-5-9-k 630mm dia (OD) m 14167
R2-SE-5-9-l 710 mm dia (OD) -do-do- but of PE-100 and PN6 class m 17964
R2-SE-5-9-m 800 mm dia (OD)-do-do- but of PE-100 and PN6 class m 19520
R2-SE-5-9-n 900 mm dia (OD)-do-do- but of PE-100 and PN6 class m 24162
R2-SE-5-9-m 1000 mm dia (OD)-do-do- but of PE-100 and PN6 class m 29383
Providing, Laying and Jointing HDPE bends/tees of PE-80 grade and
R2-SE-5-10 PN-6 class with butt joints etc.complete as specified and directed

R2-SE-5-10-a 160 mm dia (OD) No 1527


R2-SE-5-10-b 200 mm dia (OD) No 3003
R2-SE-5-10-c 250 mm dia (OD) No 5230
R2-SE-5-10-d 280 mm dia (OD) No 7266
R2-SE-5-10-e 315 mm dia (OD) No 10593
R2-SE-5-10-f 355 mm dia (OD) No 13924
R2-SE-5-10-g 400 mm dia (OD) No 18910
R2-SE-5-10-h 450 mm dia (OD) No 20760
R2-SE-5-10-i 500 mm dia (OD) No 30909
R2-SE-5-10-j 560 mm dia (OD) No 44380
R2-SE-5-10-k 630mm dia (OD) No 90474
D DWC PE Pipes
Providing, Laying and Jointing Double Wall Corrugated (DWC) PE
R2-SE-5-11 pipes of SN 8 class with R/R joint with PE coupler as per ISO21138-
3 complete as specified and directed
R2-SE-5-11-a 160 mm dia (OD) m 702
R2-SE-5-11-b 200 mm dia (OD) m 805
R2-SE-5-11-c 250 mm dia (OD) m 1100
R2-SE-5-11-d 315 mm dia (OD) m 1781
R2-SE-5-11-e 400 mm dia (OD) m 3778
R2-SE-5-11-f 500 mm dia (OD) m 6135
R2-SE-5-11-g 630mm dia (OD) m 8765

8 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
R2-SE-5-11-h 800 mm dia (OD) m 14399
R2-SE-5-11-i 1000mm dia (OD) m 17222

Providing, Laying and Jointing bends/tees of Double wall corrugated


(DWC) PE pipes of SN 8 class with R/R joints with PE coupler joints
R2-SE-5-12
as per ISO 21138-3 complete as specified and directed

R2-SE-5-12-a 160 mm dia (OD) No 983


R2-SE-5-12-b 200 mm dia (OD) No 1400
R2-SE-5-12-c 250 mm dia (OD) No 2109
R2-SE-5-12-d 315 mm dia (OD) No 3047
R2-SE-5-12-e 400 mm dia (OD) No 3859
R2-SE-5-12-f 500 mm dia (OD) No 4809
R2-SE-5-12-g 630mm dia (OD) No 6049
E Transportation of Pipes and Fittings
Transporting stoneware pipe from municipal stores or factory
stores anywhere in City/H&K/L&M/P&R/N S & T Wards to the work
R2-SE-5-13
site including, loading unloading & stacking near the work site as
directed.
R2-SE-5-13-a 150mm dia m 46
R2-SE-5-13-b 230mm dia m 61
R2-SE-5-13-c 300mm dia m 91

Transporting stoneware bends,single T,double T from municipal


stores or factory stores anywhere in City/H&K/L&M/P&R/N S & T
R2-SE-5-14
Wards to the work site including, loading unloading & stacking near
the work site as directed.
R2-SE-5-14-a 150mm dia m 15
R2-SE-5-14-b 230mm dia m 23
R2-SE-5-14-c 300mm dia m 46

Transporting R.C.C(NP3 CLASS )pipes and collars from Municipal


stores anywhere in City /H&K /P&R /L&M /N&S&T wards to the work
R2-SE-5-15
site including loading unloading and stacking near the work site as
directed.
R2-SE-5-15-a 150mm dia m 38
R2-SE-5-15-b 200mm dia m 50
R2-SE-5-15-c 250mm dia m 61
R2-SE-5-15-d 300mm dia m 76

Transporting R.C.C pipe (NP3 CLASS) with rubber rings from


Municipal stores or factory stores anywhere in City /H&K /P&R /L&M
R2-SE-5-16
/N&S&T wards to the work site including loading unloading and
stacking near the work site as directed.
R2-SE-5-16-a 300mm dia m 484
R2-SE-5-16-b 350mm dia m 490
R2-SE-5-16-c 400mm dia m 508
R2-SE-5-16-d 450mm dia m 531
R2-SE-5-16-e 500mm dia m 555
R2-SE-5-16-f 600mm dia m 694
R2-SE-5-16-g 700mm dia m 826
R2-SE-5-16-h 800mm dia m 1157
R2-SE-5-16-i 900mm dia m 1505
R2-SE-5-16-j 1000mm dia m 2026
R2-SE-5-16-k 1100mm dia m 2085
R2-SE-5-16-l 1200mm dia m 2085

9 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
R2-SE-5-16-m 1400mm dia m 3246
R2-SE-5-16-n 1600mm dia m 3246
R2-SE-5-16-o 1800mm dia m 3992
R2-SE-5-16-p 2000mm dia m 4192
R2-SE-5-16-q 2200mm dia m 4392
R2-SE-5-16-r 2400mm dia m 4692

10 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
VI. MANHOLES
Constructing on sewer brick masonry conical manholes 1.2M dia. at
bottom 0.56 M. dia. at top, built in brick masonry in cement mortar
1:3, plastered both inside and outside with 20 mm thick cement
mortar 1:2 and neat cement rendering so as to give a smooth
surface, including 300 mm thick M.15 cement concrete in
foundation and in haunches and channels finished smooth with
20mm thick cement plaster in cement mortar 1:1 and providing C.I.
steps (weighing 5.4 kg each) staggered at 300 mm. c/c including
75mm wide vata all round the external portion of the manhole and
R2-SE-6-1 No 62019
the foundation concrete in cement mortar 1:1 and supporting the
incoming pipes with brick masonry wherever necessary including
C.I. extra heavy duty (EHD) air-tight circular frame & cover
(minimum 230 Kg.) with hinge/chain resting on 30 cm high cement
concrete M.20 cap with necessary centering etc. all complete as per
standard specifications and directions including finishing the cap
with cement plaster on both sides 1:2 and neat cement rendering so
as to give a smooth surface in line and level with the brick masonry
surface and as per drawing inDyCh.E.(Sewerage)P&D's office
Extra over above per metre depth above 1.5 M. and upto 2.3 M.
R2-SE-6-1-a m.depth 18654
depth -do- -do-
Constructing on sewer brick masonry conical manhole 1.5 M. dia. at
bottom and 0.56 M dia. at top including C.I. Extra.Heavy Duty
R2-SE-6-2-b No 90305
circular air tight frame and cover etc. complete as per description in
item No.R2-SE-6-1 depth upt0 2.3 M.
Extra for above manhole per metre depth above 2.3M and upto 5 M
R2-SE-6-2-c including safety chain and extra C.I. steps on other side of benching- m.depth 34099
do-do-
R2-SE-6-2-d Do- -do- above 5 M & upto 9 M -do- -do- m.depth 48097
R2-SE-6-2-e Do- -do- above 9.M & upto 11 M -do- -do- m.depth 67802
R2-SE-6-2-f Do- -do- above 11M & upto 12 M -do- -do- m.depth 93521
R2-SE-6-2-g Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 122713
Constructing on sewer brick masonary conical manhole 1.8M dia.
at bottom 0.56M dia at top, including C.I. Extra heavy Duty airtight
R2-SE-6-3 No 118400
circular frame and cover etc. complete as per description in Item
No.R2-SE-6-1 depth upto2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-3-a including safety chain and extra C.I. steps on other side of benching- m.depth 39365
do-do-
R2-SE-6-3-b Do- -do- above 5 M. and upto 9M -do- -do- m.depth 54724
R2-SE-6-3-c Do- -do- above 9 M. and upto 11M -do- -do- m.depth 77319
R2-SE-6-3-d Do- -do- above 11M and upto 12M -do- -do- m.depth 105651
R2-SE-6-3-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 137556
Constructing on sewer brick masonary trapezoidal manhole 1.5M x
0.9M at bottom and 0.9M x 0.45M at top, including C.I. EHD
R2-SE-6-4 airtight rectangular frame and cover weighing minimun 225 kg . No 63963
complete as per description in Item No.R2-SE-6-1 depth upto 1.2M

R2-SE-6-4-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 20912
Constructing on sewer brick masonary trapezoidal manhole 1.5M x
1.2M at bottom and 0.9M x 0.6M at top, including C.I. EHD airtight
R2-SE-6-5 rectangular frame and cover weighing minimum 270 kg . complete No 72618
as per description in Item No.R2-SE-6-1 depth upto 1.2M

R2-SE-6-5-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 22899

11 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
Constructing on sewer brick masonry trapezoidal manhole 1.8M x
1.5 M at bottom and 0.9 M x 0.6M at top, including C.I. EHD
R2-SE-6-6 airtight rectangular frame and cover weighing minimum 270 kg . No 133637
complete as per description in Item No.R2-SE-6-1 depth 2.9 M

Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-6-a including safety chain and extra C.I steps on other side of benching- m.depth 44019
do-do-
R2-SE-6-6-b Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 63597
R2-SE-6-6-c Do- -do- above 9M and upto 11M depth -do- -do- m.depth 89292
R2-SE-6-6-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 122826
R2-SE-6-6-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 161111
Constructing brick masonary trapezoidal manhole on sewer 2.4M x
1.5M at bottom and 0.9M x 0.6M at top built in brick masonary in
C.M. 1:3 plastered both inside and outside with 20 mm thick cement
plaster in C.M. 1:2 and neat cement rendering so as to give a
smooth surface 300 mm thick M 20 cement concrete in foundation
and in haunches and channels finished smooth with 20 mm cement
plaster in C.M. 1:1 and providing C.I. steps (approximately weighing
5.4 kg each)staggered at 300mm c/c. including 75 mm wide vata all
round the external portion of the manhole and the foundation
concrete in cement mortar 1:1 and supporting the incoming pipes
R2-SE-6-7 with brick masonary wherever necessary including 0.9m x 0.6M C.I. No 239650
EHD airtight rectangular frame and cover weighing minimum 270 kg
resting on 300mm high cement concrete M20 cap with necessary
centering including cement plaster (1:2) on both sides neat cement
rendering so as to give a smooth surface in line and level including
safety chain and extra C.I steps on other side benching complete as
per standard specifications & directions and as per drawing in
Dy.Ch.E. (SP) P&D's office without excavation depth upto
4.5M

Extra per metre depth of the above manhole -do- -do- as per above
R2-SE-6-7-a m.depth 71930
item -do- -do- from 4.5 to 9M depth.
R2-SE-6-7-b Do- -do- above from 9M and upto 11M depth -do- -do- m.depth 100672
R2-SE-6-7-c Do- -do- above from 11 M and upto 12 M depth -do -do- m.depth 137910
R2-SE-6-7-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing on sewer brick masonry scraper manhole 1.5M x 1.5
M at bottom and 1.2 M x 0.9M at top, including C.I. EHD airtight
R2-SE-6-8 No 226634
rectangular frame and cover weighing minimum 900 kg . complete
as per description in Item No.R2-SE-6-1 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-8-a including safety chain and extra C.I steps on other side of benching- m.depth 40863
do-do-
R2-SE-6-8-b Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 59228
R2-SE-6-8-c Do- -do- above 9M and upto 11M depth -do- -do- m.depth 83497
R2-SE-6-8-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 115356
R2-SE-6-8-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 151870
Constructing on sewer brick masonry scraper manhole 1.8M x 1.5M
at bottom and 1.2M x 0.9M at top , including C.I. EHD airtight
R2-SE-6-9 rectangular frame and cover weighing minimum 900 kg etc. No 236136
complete as per description in item No. R2-SE-6-1 depth upto 2.9M

Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-9-a including safety chain and extra C.I steps on other side of benching- m.depth 44019
do-do-
R2-SE-6-9-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 63597

12 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
R2-SE-6-9-c Do- -do- above 9 M and upto 11M depth -do- -do- m.depth 89292
R2-SE-6-9-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 122826
R2-SE-6-9-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 161111
Constructing on sewer brick masonry scraper manhole 1.8M x 1.8M
at bottom and 1.2M x 0.9M at top , including C.I. Rectangular EHD
R2-SE-6-10 airtight frame and cover weighing minimum 900 kg etc. complete as No 244834
per description in item No. R2-SE-6-1 depth upto 2.9M

Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-10-a including safety chain and extra C.I steps on other side of benching- m.depth 47050
do-do-
R2-SE-6-10-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 67830
R2-SE-6-10-c Do- -do- above 9 M and upto 11M depth -do- -do- m.depth 94947
R2-SE-6-10-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 130149
R2-SE-6-10-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 170352
Constructing brick masonary scraper type manhole on sewer 2.4M x
1.5M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item No. R2-SE-6-8 including C.I.
R2-SE-6-11 No 335566
Rectangular EHD air tight frame and cover ( weighing minimum
900 kg ), safety chain and extra C.I. steps, depth upto 4.5M

Extra for above manhole per metre depth above 4.5M and upto 9M
R2-SE-6-11-a m.depth 71930
depth.
R2-SE-6-11-b do- -do- 9 M to 11M depth m.depth 100672
R2-SE-6-11-c do- -do- 11 M to 12M depth m.depth 137910
R2-SE-6-11-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing brick masonary scraper type manhole on sewer 2.4M x
2.4M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no. R2-SE-6-8 including C.I.
R2-SE-6-12 No 386962
Rectangular EHD airtight frame and cover weighing minimum 900
kg, safety chain and extra C.I. steps, depth upto 4.5 M.

R2-SE-6-12-a Extra for above manhole above 4.5M to 9M depth m.depth 84820
R2-SE-6-12-b -do- -do- 9 M to 11 M depth m.depth 117848
R2-SE-6-12-c -do- -do- 11 M to 12 M depth m.depth 159733
R2-SE-6-12-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 207317
Constructing brick masonary scraper type manhole on sewer 3M x
2M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no. R2-SE-6-8 including C.I.
R2-SE-6-13 No 373794
Rectangular EHD aritight frame and cover weighing minimum 900
kg safety chain and extra C.I steps, depth upto 4.5 M.

R2-SE-6-13-a Extra for above manhole above 4.5M to 9M depth m.depth 85452
R2-SE-6-13-b -do- -do- 9 M to 11 M depth m.depth 121679
R2-SE-6-13-c -do- -do- 11 M to 12 M depth m.depth 164664
R2-SE-6-13-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 213494
Constructing brick masonary scraper type manhole on sewer 3M x
3M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no.R2-SE-6-10 including C.I.
R2-SE-6-14 No 427473
Rectangular EHD aritight frame and cover weighing minimum 900
kg, safety chain extra C.I. steps depth upto 4.5 M.

R2-SE-6-14-a Extra for above manhole above 4.5M to 9M depth m.depth 99556
R2-SE-6-14-b -do- -do- 9 M to 11 M depth m.depth 140884
R2-SE-6-14-c -do- -do- 11 M to 12 M depth m.depth 189438
R2-SE-6-14-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 244432

13 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
Constructing on sewer brick masonry conical manholes 1.2M dia. at
bottom 0.56 M. dia. at top, built in brick masonry in cement mortar
1:3, plastered both inside and outside with 20 mm thick cement
mortar 1:2 and neat cement rendering so as to give a smooth
surface, including 300 mm thick M.15 cement concrete in
foundation and in haunches and channels finished smooth with
20mm thick cement plaster in cement mortar 1:1 and providing
copolymer steps staggered at 300 mm. c/c including 75mm wide
vata all round the external portion of the manhole and the foundation
R2-SE-6-15 concrete in cement mortar 1:1 and supporting the incoming pipes No 35173
with brick masonry wherever necessary including Steel Fibre
Reinforced Concrete (SFRC) EHD circular frame and cover resting
on 30 cm high cement concrete M.20 cap with necessary centering
etc. all complete as per standard specifications and directions
including finishing the cap with cement plaster on both sides 1:2 and
neat cement rendering so as to give a smooth surface in line and
level with the brick masonry surface and as per drawing in DyCh.E.
(Sewerage) P&D's office without excavation depth upto 1.5
M.(Depth of Manhole measured from top of manhole cover to Invert
Extra over above per metre depth above 1.5 M. and upto 2.3 M.
R2-SE-6-15-a m.depth 18654
depth -do- -do-
Constructing on sewer brick masonry conical manhole 1.5 M. dia. at
bottom and 0.56 M dia. at top including SFRC. EHD circular frame
R2-SE-6-15-b No 62533
and cover and copolymer steps etc. complete as per description in
item No.R2-SE-6-15 depth upto 2.3 M.
Extra for above manhole per metre depth above 2.3M and upto 5 M
R2-SE-6-15-c including safety chain and extra copolymer steps on other side of m.depth 34099
benching-do-do-
R2-SE-6-15-d Do- -do- above 5 M & upto 9 M -do- -do- m.depth 48097
R2-SE-6-15-e Do- -do- above 9.M & upto 11 M -do- -do- m.depth 67802
R2-SE-6-15-f Do- -do- above 11M & upto 12 M -do- -do- m.depth 93521
R2-SE-6-15-g Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 122713
Constructing on sewer brick masonary conical manhole 1.8M dia.
at bottom 0.56M dia at top, including SFRC EHD circular frame and
R2-SE-6-16 No 90002
cover and copolymer steps etc. complete as per description in Item
No.R2-SE-6-15 depth upto 2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-16-a including safety chain and extra copolymer steps on other side of m.depth 39365
benching-do-do-
R2-SE-6-16-b Do- -do- above 5 M. and upto 9M -do- -do- m.depth 54724
R2-SE-6-16-c Do- -do- above 9 M. and upto 11M -do- -do- m.depth 77319
R2-SE-6-16-d Do- -do- above 11M and upto 12M -do- -do- m.depth 105651
R2-SE-6-16-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 137556
Constructing on sewer brick masonary trapezoidal manhole 1.5M x
0.9M at bottom and 0.9M x 0.45M at top, including SFRC. EHD
R2-SE-6-17 airtight rectangular frame and cover and copolymer steps complete No 38961
as per description in Item No.R2-SE-6-15 depth upto 1.2M

R2-SE-6-17-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 20912
Constructing on sewer brick masonary trapezoidal manhole 1.5M x
1.2M at bottom and 0.9M x 0.6M at top, including SFRC. EHD
R2-SE-6-18 rectangular frame and cover and copolymer steps complete as per No 43047
description in Item No.R2-SE-6-15 depth upto 1.2M

R2-SE-6-18-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 22899

14 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
Constructing on sewer brick masonry trapezoidal manhole 1.8M x
1.5 M at bottom and 1.2 M x 0.9M at top, including SFRC EHD
R2-SE-6-19 No 102027
rectangular frame and cover . complete as per description in Item
No.R2-SE-6-15 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-19-a including safety chain and extra copolymer steps on other side of m.depth 44019
benching-do-do-
R2-SE-6-19-b Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 63597
R2-SE-6-19-c Do- -do- above 9M and upto 11M depth -do- -do- m.depth 89292
R2-SE-6-19-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 122826
R2-SE-6-19-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 161111
Constructing brick masonary trapezoidal manhole on sewer 2.4M x
1.5M at bottom and 0.9M x 0.6M at top built in brick masonary in
C.M. 1:3 plastered both inside and outside with 20 mm thick cement
plaster in C.M. 1:2 and neat cement rendering so as to give a
smooth surface 300 mm thick M 15 cement concrete in foundation
and in haunches and channels finished smooth with 20 mm cement
plaster in C.M. 1:1 and providing SFRC steps (approximately
weighing 5.4 kg each)staggered at 300mm c/c. including 75 mm
wide vata all round the external portion of the manhole and the
R2-SE-6-20 foundation concrete in cement mortar 1:1 and supporting the No 205745
incoming pipes with brick masonary wherever necessary including
0.9m x 0.6M SFRC EHD rectangular frame and cover resting on
300mm high cement concrete M15 cap with necessary centering
including cement plaster (1:2) on both sides neat cement rendering
so as to give a smooth surface in line and level including safety
chain and extra copolymer steps on other side benching complete as
per standard specifications & directions and as per drawing in
Dy.Ch.E. (SP) P&D's office without excavation depth upto 4.5M

Extra per metre depth of the above manhole -do- -do- as per above
R2-SE-6-20-a m.depth 71930
item -do- -do- from 4.5 to 9Mdepth.
R2-SE-6-20-b Do- -do- above from 9M and upto 11M depth -do- -do- m.depth 100672
R2-SE-6-20-c Do- -do- above from 11 M and upto 12 M depth -do -do- m.depth 137910
R2-SE-6-20-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing on sewer brick masonry scraper manhole 1.5M x 1.5
M at bottom and 1.2 M x 0.9M at top, including SFRC EHD
R2-SE-6-21 No 116759
rectangular frame and cover and copolymer steps. complete as per
description in Item No.R2-SE-6-15 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-21-1 including safety chain and extra copolymer steps on other side of m.depth 40863
benching-do-do-
R2-SE-6-21-2 Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 59228
R2-SE-6-21-3 Do- -do- above 9M and upto 11M depth -do- -do- m.depth 83497
R2-SE-6-21-4 Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 115356
R2-SE-6-21-5 Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 151870
Constructing on sewer brick masonry scraper manhole 1.8M x 1.5M
at bottom and 1.2M x 0.9M at top , including SFRC Rectangular
R2-SE-6-22 EHD frame and cover and copolymer steps. complete as per No 126253
description in item No. R2-SE-6-15 depth upto 2.9M

Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-22-a including safety chain and extra co-polymer steps on other side of m.depth 44019
benching-do-do-
R2-SE-6-22-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 63597
R2-SE-6-22-c Do- -do- above 9 M and upto 11M depth -do- -do- m.depth 89292
R2-SE-6-22-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 122826

15 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
R2-SE-6-22-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 161111
Constructing on sewer brick masonry scraper manhole 1.8M x 1.8M
at bottom and 1.2M x 0.9M at top , including SFRC. Rectangular
R2-SE-6-23 EHD frame and cover and copolymer steps complete as per No 134943
description in item No. R2-SE-6-15 depth upto 2.9M

Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-23-a including safety chain and extra copolymer steps on other side of m.depth 47050
benching-do-do-
R2-SE-6-23-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 67830
R2-SE-6-23-c Do- -do- above 9 M and upto 11M depth -do- -do- m.depth 94947
R2-SE-6-23-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 130149
R2-SE-6-23-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 170352
Constructing brick masonary scraper type manhole on sewer 2.4M x
1.5M at bottom 1.2M x 0.9M at top built in brick masonary in C.M.
R2-SE-6-24 1:3 -do- -do- as per item No. R2-SE-6-8 including SFRC. No 225119
Rectangular EHD frame and cover and copolymer steps, safety
chain and extra steps, depth upto 4.5M
Extra for above manhole per metre depth above 4.5M and upto 9M
R2-SE-6-24-a m.depth 71930
depth.
R2-SE-6-24-b -do- -do- 9 M to 11M depth m.depth 100672
R2-SE-6-24-c -do- -do- 11 M to 12M depth m.depth 137910
R2-SE-6-24-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing brick masonary scraper type manhole on sewer 2.4M x
2.4M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no. R2-SE-6-17 including SFRC
R2-SE-6-25 No 274749
Rectangular EHD frame and cover with copolymer steps, safety
chain and extra steps, depth upto 4.5M.

R2-SE-6-25-a Extra for above manhole above 4.5M to 9M depth m.depth 84820
R2-SE-6-25-b -do- -do- 9 M to 11 M depth m.depth 117848
R2-SE-6-25-c -do- -do- 11 M to 12 M depth m.depth 159733
R2-SE-6-25-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 207317
Constructing brick masonary scraper type manhole on sewer 3M x
2M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no. R2-SE-6-25 including SFRC
R2-SE-6-26 No 263600
Rectangular EHD frame and cover with copolymer steps, safety
chain and extra steps, depth upto 4.5 M.

R2-SE-6-26-a Extra for above manhole above 4.5M to 9M depth m.depth 85452
R2-SE-6-26-b -do- -do- 9 M to 11 M depth m.depth 121679
R2-SE-6-26-c -do- -do- 11 M to 12 M depth m.depth 164664
R2-SE-6-26-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 213494
Constructing brick masonary scraper type manhole on sewer 3M x
3M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no.R2-SE-6-25 including SFRC
R2-SE-6-27 No 317279
Rectangular EHD frame and coverwith copolymer steps, safety
chain and extra steps, depth upto 4.5 M.

R2-SE-6-27-a Extra for above manhole above 4.5M to 9M depth m.depth 99556
R2-SE-6-27-b -do- -do- 9 M to 11 M depth m.depth 140884
R2-SE-6-27-c -do- -do- 11 M to 12 M depth m.depth 189438
R2-SE-6-27-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 244432

16 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
VII. DROP ARRANGEMENT
Providing 150 mm dia stoneware pipes of SP2 class in vertical drop
of 0.6M including 150 mm dia stone ware pipe fixed in brick
masonary of the manhole at required level & providing 150 mm dia
stone ware right angled bend, 150 mm x 150 mm x 150 mm S.W.
double tee junction including cutting, jointing & filleting as per
detailed specifications, encased in half brick thick masonary in
cement mortar (1:3) all round the pipes double tee, bend and extra
R2-SE-7-1 No 4220
brick work below bend upto the foundation of the manhole and
tapering portion of the manhole, plastering the exposed surfaces
after raking out the joints of the masonary to a depth of 20 mm in
C.M. (1:2) 20 mm thick and neat cement rendering so as to give a
smooth surface, including plugging the openings etc. complete as
directed and as per drawing in Dy.Ch.E.(S.P.) P&D's office.

Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-1-a m.depth 3234
item.
Do- -do- 230 mm dia stone ware pipe of SP2 class in vertical drop
R2-SE-7-2 No 7818
upto 0.6M -do- -do- as per item R2-SE-7-1
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-2-a m.depth 4992
item.
Do- -do- 300 mm dia stone ware pipe of SP2 class in vertical drop
R2-SE-7-3 No 18198
of 0-6m -do- -do- as per item R2-SE-7-1
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-3-a m.depth 6211
item.
Providing 160 mm dia HDPE pipes of PE-80 grade and PN-6 class
in vertical drop of 0.6m including 160mm dia HDPE pipes fixed in
brick masonary of the manhole at required level and providing
160mm dia HDPE right angled bend, 160mmx160mmx160mm
HDPE double tee junction including cutting and jointing as per
detailed specifications,encased in half brick thick masonary in
cement mortar (1:3) all round the pipes,double tee,bend and extra
R2-SE-7-4 No 5862
brickwork below bend upto the foundation of the manhole and
tapering portion of the manhole plastering,plastering the exposed
surfaces after raking out the joints of the masonary to a depth of
20mm in CM(1:2) 20mm thick and neat cement rendering so as to
give smooth surface,including plugging the openings etc complete
as directed and asper drawing in Dy CE(SP)P&D's office

Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-4-a m.depth 3409
item
Do- -do- 200 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-5 vertical drop of 0.6M -do- -do- as in item No.R2-SE-7-4 No 9509

Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-5-a m.depth 5178
item
Do- -do- 250 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-6 vertical drop of 0.6M -do- -do- as in item No.R2-SE-7-4 No 14022

Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-6-a m.depth 6643
item
Do- -do- 280 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-7 vertical drop of 0.6M -do- -do- as in item No.R2-SE-7-4 No 18809

Extra over above per additional meter depth 7167


R2-SE-7-7-a m.depth
Do-do -as per above item

17 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
Do- -do- 315 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-8 vertical drop of 0.6M -do- -do- as in item No.R2-SE-7-4 No 33371

Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-8-a m.depth 8171
item
Do- -do- 355 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-9 vertical drop of 0.9M -do- -do- as in item No.R2-SE-7-4 No 42759

Extra over above per additional meter depth 30545


R2-SE-7-9-a
Do-do -as per above item m.depth
Do- -do- 400 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-10 vertical drop of 0.9M -do- -do- as in item No.R2-SE-7-4 No 54496

Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-10-a m.depth 12089
item
Do- -do- 450 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-11 vertical drop of 0.9M -do- -do- as in item No.R2-SE-7-4 No 63971

Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-11-a m.depth 14220
item
Do- -do- 500 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-12 vertical drop of 1.2M -do- -do- as in item No.R2-SE-7-4 No 84842

Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-12-a m.depth 16473
item
Do- -do- 560 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-13 vertical drop of 1.2M -do- -do- as in item No.R2-SE-7-4 No 111442

Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-13-a m.depth 18644
item
Do- -do- 630 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-14 vertical drop of 1.2M -do- -do- as in item No.R2-SE-7-4 No 193961

Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-14-a m.depth 22644
item

18 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
VIII. INSPECTION CHAMBER
Constructing brick masonary inspection chamber rectangular 0.9M x
0.45M and0.6M deep on sewer with 230mm brick walls in cement
mortar 1:3 plastered both inside & outside with 20 mm thick
cement mortar 1:2 and neat cement rendering so as to give a
smooth surface including 230mm cement concrete bedding (M 15)
and cement concrete (M 15) in haunches and channels finished
smooth with 20 mm thick cement mortar( 1:1) and fixing C.I. extra
R2-SE-8-1 heavy duty airtight rectangular frame & cover of size 0.9M x 0.45M No 40697
weighing minimum 225Kg. resting on 300 mm high c.c. cap M 20
with (1:1) cement plaster on both the sides & necessary C.I. steps (
weighing 5.4 kg each)staggered at 300mm c/c. including 75 mm
wide vata all round the external portion of the chamber and the
foundation concrete in C.M. 1:1 etc. complete as per plan in
Dy.Ch.E.(SP)P&D's office( without excavation ) .

Extra over above for every additional metre depth upto 2.5M -do- -
R2-SE-8-1-a m.depth 13531
do-etc. complete as specified and directed.
Constructing brick masonary inspection chamber rectangular 0.9M x
0.6M and 0.6M deep -do- including M 20, 30 cm thick cap c.c.
Bedding & including C.I. extra heavy duty air tight frame and cover
R2-SE-8-2 No 49457
weighing minimum 270kg complete as per description in item No.
R2-SE-8-1 with necessary centering etc. all complete as per plan
and directed.
Extra over above for every additional metre depth upto 2.5M -do- -
R2-SE-8-2-a m.depth 15442
do- etc. complete as specified and directed.
Constructing brick masonary inspection chamber rectangular 0.75M
x 0.75M and 0.6M deep -do- -do- as per description in item no R2-
R2-SE-8-3 SE-8-1 including CI extra heavy duty air tight frame and cover No 46928
weighing minimum 275 kg complete as per plan and directed

Extra over above for every additional metre depth upto 2.M -do- -do-
R2-SE-8-3-a m.depth 15412
with necessary centering etc. all complete as per direction.
Constructing brick masonary inspection chamber rectangular 0.6M x
0.6M and 0.6M deep -do- -do- etc. complete as per description in
R2-SE-8-4 item no R2-SE-8-1 including CI extra heavy duty air tight frame and No 39418
cover weighing minimum 200 kg complete as per plan and directed.

Extra over above for every additional metre depth upto 2.M -do- -do-
R2-SE-8-4-a m depth 13456
with necessary centering etc. all complete as per direction.
Constructing brick masonary inspection chamber rectangular 0.9M x
0.45M and0.6M deep on sewer with 230mm brick walls in cement
mortar 1:3 plastered both inside & outside with 20 mm thick
cement mortar 1:2 and neat cement rendering so as to give a
smooth surface including 230mm cement concrete bedding (M 15)
and cement concrete (M 15) in haunches and channels finished
smooth with 20 mm thick cement mortar( 1:1) and fixing SFRC
R2-SE-8-5 No 16604
extra heavy dutyrectangular frame & cover of size 0.9M x 0.45M.
resting on 300 mm high c.c. cap M 20 with (1:1) cement plaster on
both the sides & necessary co-polymer. steps staggered at 300mm
c/c. including 75 mm wide vata all round the external portion of the
chamber and the foundation concrete in C.M. 1:1 etc. complete as
per plan in Dy.Ch.E.(SP)P&D's office( without excavation ) .

Extra over above for every additional metre depth upto 2.5M -do- -
R2-SE-8-5-a m.depth 12482
do- etc. complete as specified and directed.

19 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
Constructing brick masonary inspection chamber rectangular 0.9M x
0.6M and 0.6M deep -do- including M 20, 30 cm thick cap c.c.
R2-SE-8-6 Bedding & including SFRC extra heavy duty frame and cover No 19654
complete as per description in item No. R2-SE-8-5 etc. all complete
as specified and directed.
Extra over above for every additional metre depth upto 2.5M -do- -
R2-SE-8-6-a m.depth 16173
do-.
Constructing brick masonary inspection chamber rectangular 0.75M
x 0.75M and 0.6M deep -do- -do- as per description in item no R2-
R2-SE-8-7 No 35742
SE-8-5 including SFRC extra heavy duty frame and cover complete
as specified and directed.
Extra over above for every additional metre depth upto 2.M -do- -do-
R2-SE-8-7-a m.depth 14464
with necessary centering etc. all complete as per direction.
Constructing brick masonary inspection chamber rectangular 0.6M x
0.6M and 0.6M deep -do- -do- etc. complete as per description in
R2-SE-8-8 No 30439
item no R2-SE-8-5 ncluding SFRC extra heavy duty frame and cover
complete as specified and directed.
Extra over above for every additional metre depth upto 2.M -do- -do-
R2-SE-8-8-a m.depth 12507
with necessary centering etc. all complete as per direction.

20 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
IX. VENT SHAFTS
Providing R.C.C. Spun vent shaft 7.3M in height embedded in M15
cement concrete Including flue chamber etc. complete without
R2-SE-9-1 excavation.The height of the vent shaft to be measured from its No 52114
bottom upto the top as per the drawing and as specified and directed

C.I. Shoe bend 150 mm dia fixed complete including cutting through
R2-SE-9-2 masonary, cornices etc. and making good the same including No 1670
painting as directed.
R2-SE-9-3 Collar for C.I.pipes 150mm.dia.fixed complete including painting. No 4885
Removing zinc galvanised sheet /cast iron vent shafts including all
fittings and appliances and making good the masonary work
R2-SE-9-4 m 309
including cornices painting and stacking the material wherever
directed etc.complete.
Removing and refixing -do-do-on the same site (for galvanised
R2-SE-9-5 m 682
sheet/cast iron vent shaft).
R2-SE-9-5-a -do- -do- on different site in the same locality -do- -do- m 904
Brick masonary flue chamber for vent shaft 0.375M x 0.375M x 0.6M
deep of 230 mm brick wall in C.M.1:3 and 20 mm cement and sand
plaster on both sides in C.M. 1:2 finished smooth including 150 mm
R2-SE-9-6 No 7273
M15 cement concrete bedding and 150 mm thick reinforcement
concrete dhapas built complete including excavation etc. as
specified and directed
Removing & refixing of C.I. Vent shaft complete as directed including
R2-SE-9-7 transporting to municipal stores anywhere in City/suburbs. No 4440

Removing & refixing of R.C.C Vent shaft complete as directed


R2-SE-9-8 including transporting to municipal stores anywhere in City/suburbs. No 16902

Removing CI vent shaft complete as directed including transporting


R2-SE-9-9 No 2598
to municipal stores/anywhere in City/Suburbs.
R2-SE-9-10 -Do-do-RCC vent shaft-do-do No 3439

21 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
X. IRON WORKS
NOTE
Wastage in cutting will not be paid for. Only steel actually fixed in
position will be paid by linear measurement including hooks and
bends. No payment will be made for binding wire, pins, chairs and
laps and/or welding. The contractors should note this while quoting
the rates. All iron work shall be free from rust, scale and the rate
shall be inclusive of painting with 3 coats of approved make over
one coat of primer to iron work.
Supplying and fixing C.I. Steps weighing 5.4 kg each wherever
R2-SE-10-1 No 790
directed.
Supply and fixing orange colour foot rest of minumum 6mm thick
plastic encapsulated on 12mm square steel bar having minimum
R2-SE-10-2 cross section of 24mm square and overall minimum length of No 385
375mm and width of 150mm as per drawing etc complete as
specified and directed
Supplying and fixing 0.56M dia C.I. Circular extra heavy duty (EHD)
R2-SE-10-3 airtight frame and cover weighing minimum 230 kg fixed complete No 29935
to manholes.
-do- -do- 1.2M x 0.9M rectangular C.I. frame and cover. -do- -do-
R2-SE-10-4 No 127497
weighing minimum 900 kg -do- -do-with 2 nos of C.I. covers
-do- -do- 0.9M x 0.45M rectangular C.I. frame and cover. -do- -do-
R2-SE-10-5 No 29782
weighing minimum 225 kg.-do-do
-do- -do- 0.9M x 0.6M rectangular C.I. frame and cover. -do- -do-
R2-SE-10-6 No 35786
weighing minimum 270 kg.-do-do
-do- -do- 0.75M x 0.75M rectangular C.I. frame and cover. -do- -do-
R2-SE-10-7 No 35691
weighing minimum 275 kg.-do-do
-do- -do- 0.6M x 0.6M rectangular CI frame and cover. -do- -do-
R2-SE-10-8 No 30239
weighing minimum 200 kg.-do-do
Supplying and fixing 0.56m dia circular extra heavy duty (EHD)
R2-SE-10-9 SFRC frame and cover as per drawing fixed complete to manhole as No 5194
specified and directed
-do-do- 1.2m x 0.9m rectangular SFRC frame and cover with 2 nos.
R2-SE-10-10 No 21868
of SFRC covers -do-do-
-do-do- 0.9m x 0.45m rectangular SFRC frame and cover -do-do-
R2-SE-10-11 No 6989
R2-SE-10-12 -do- -do- 0.9M x 0.6M rectangular frame and cover. -do- -do- No 7875
Mild steel in flat, round and square bar, angle tee including all bolts
R2-SE-10-13 washers nuts and screws, fastenings, fittings etc. Including forming, M.T. 64046
brackets corners, treading etc. complete.
Providing 12mm thick M.S plate of required size over the trench and
R2-SE-10-14 M.T. 67238
removing after completion of work as directed by Engineer

22 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
XI. DESILTING
Desilting functioning/non-functioning of sewers of any size and
shape upto any depth by any means including pumping out liquid
waste or sewage,plugging, diverting the flow in the drain if necessary
and stacking the removed silt in the depots as directed within radius
of 300 meters including taking precautionary and safety measures
R2-SE-11-1 cum 1525
such as test for gases spreading bleaching powder on the depot of
the removed silt etc. complete or as directed(For payment purpose
30% voids for silt would be deducted and for stone or boulders 40%
would be deducted on the depot measurement).

Systematically cleaning /functioning/ non-functioning sewer of


150mm dia to 230 mm dia sewer by passing ropes knots, bamboo
kamti and disc. of required size as directed and specified including
R2-SE-11-2 safety measures such as tests for gases, use of safety belts, dry cell, m 77
tourches, or lighting in manholes & drains as directed and specified -
do- -do- as per item No. R2-SE-11-1

Systematically cleaning /functioning/ non-functioning sewer of300


mm dia to 600 mm dia sewer by passing ropes knots, bamboo kamti
and disc. of required size as directed and specified including safety
R2-SE-11-3 measures such as tests for gases, use of safety belts, dry cell, m 108
tourches, or lighting in manholes & drains as directed and specified -
do- -do- as per item No. R2-SE-11-1

Systematically cleaning / functioning / non-functioning sewer of 700


mm dia to 1200 mm dia sewer by passing ropes knots, bamboo
kamti and disc. of required size as directed and specified including
taking necessary precautionary safety measures such as tests for
R2-SE-11-4 m 314
gases, use of safety belts, dry cell, tourches, for lighting in manholes
& drains etc. complete including sprinkling bleaching powder on the
silt removed to avoid bad smell -do- -do- as per item No.R2-SE-11-
1
-do- -do- 1400 mm dia to 1800 mm dia -do- -do- as per item no R2-
R2-SE-11-5 m 453
SE-11-2
-do- -do- 2000 mm dia to 2400 mm dia -do- -do- as per item no R2-
R2-SE-11-6 m 708
SE-11-2

23 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
XII. MISCELLANEOUS
Providing and applying solution of sodium silicate for digestion tank
and/or wherever directed in 3 coats prepared from silicate of soda
R2-SE-12-1 mixed with potable water in the proportion of 1:4 including spraying sq.m 68
cleaning the surface etc. all complete as directed.

Providing and applying polyurea coating for digestion tank and/or


wherever directed in 1.2mm thick as per manufacturers
R2-SE-12-2 sq.m 2230
specifications including necessary tools, surface preparation etc. all
complete as specified and directed.
R2-SE-12-3 Providing strut holes with set stones in manholes Pair 1092
Providing and Fixing150 mm intercepting stoneware sewer trap laid
R2-SE-12-4 No 1033
complete
R2-SE-12-5 do-do-230 mm dia -do- -do- No 2579
100 mm dia to 150 mm dia pipe hole cut into masonry of manhole of
R2-SE-12-6 sewer and the pipe stopped round with cement and sand filletings. No 258

R2-SE-12-7 230 mm to 300 mm dia -do- -do- No 407


R2-SE-12-8 350 mm to 450 mm dia -do- -do- No 619
R2-SE-12-9 500 mm to 600 mm dia -do- -do- No 777
Cutting down masonary work in lime or cement mortar plaster etc.
R2-SE-12-10 cum 471
complete
Removing and cutting down completely R.C.C.slab, R.C.C. Beams
R2-SE-12-11 R.C.C. Columns etc. in any thickness and size and removing away cum 1178
the debris.
Providing and fixing shahabad ladi (0.7m x 0.7m x 75mm thick) over
manhole opening where frame and cover are not provided, including
R2-SE-12-12 No 1103
fixing the same over brick masonary or concrete cap with C.M.(1:2)
all round as directed etc. complete.
Pumping out water from drainage trenches by 5 H.P. pump per shift
R2-SE-12-13 Per shift 1995
of 8 hours.
R2-SE-12-14 -do--do- 10 H.P. -do- -do- Per shift 2394
Extra for providing locking arrangement to C.I. EHD Circular
R2-SE-12-15 manhole frame and cover above the rate of providing and fixing C.I. No 1038
EHD Circular manhole frame and cover.
Providing and laying 100 mm dia stoneware pipes including jointing,
R2-SE-12-16 m 463
filleting etc. complete.
Constructing coffer dams of puddle bags of 30 litres each completely
new with clay/silt/impervious materials core including diversion of
flow removing and pumping out water etc. complete to keep working
R2-SE-12-17 Bag. 121
space dry as specified and as directed.(This item includes
maintenance during the work in progress and removal of the same
after completion of work.).
Constructing coffer dams of puddle bags completely new with
clay/silt/impervious materials core including diversion of flow
removing and pumping out water etc. complete to keep working
R2-SE-12-18 cum 2742
space dry as specified and as directed.(This item includes
maintenance during the work in progress and removal of the same
after completion of work.).
Breaking the pardi by any means, including safety measure,
provided in the existing non-functioning sewer and removal of the
R2-SE-12-19 cum 1007
debris finishing the surface and cleaning etc. complete as directed.

24 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
XIII. MICROTUNNELING AND PIPE JACKING
Excavate in tunnel by micro tunnel boring machine for installing
600mm diameter sleeve or carrier for sewer line or water main to
correct grade and alignment using slurry or mixed shields in any
R2-SE-13-1 type of strata including marshy land, soft clay, murum, soft/hard m 87678
rock and/ or boulders of any strength and hardness, dewatering, etc.
but excluding muck disposal from shaft site complete as per
specifications and as directed by the Engineer.
R2-SE-13-1-a 800 mm dia -do- -do- m 93507
R2-SE-13-1-b 1000mm dia -do- -do- m 109556
R2-SE-13-1-c 1200 mm dia -do- -do- m 132199
R2-SE-13-1-d 1400 mm dia -do- -do- m 152412
R2-SE-13-1-e 1600 mm dia -do- -do- m 179939
R2-SE-13-1-f 1800 mm dia -do- -do- m 188622
R2-SE-13-1-g 2000 mm dia -do- -do- m 197304
R2-SE-13-1-h 2200 mm dia -do- -do- m 204511
R2-SE-13-1-i 2400 mm dia -do- -do- m 210904

Approved 600mm diameter reinforced concrete pipe conforming to


jacking pipe standards like JSWAS A-6, ASTM C-76 SS 183 or AS
1342 but not less than NP4 class under IS 458; supplied, jointed and
R2-SE-13-2 m 38142
installed to correct line and grade by pipe jacking works etc.
complete as per specifications and as directed by the Engineer

R2-SE-13-2-a 800 mm dia -do- -do- m 40577


R2-SE-13-2-b 1000mm dia -do- -do- m 43449
R2-SE-13-2-c 1200 mm dia -do- -do- m 46641
R2-SE-13-2-d 1400 mm dia -do- -do- m 49866
R2-SE-13-2-e 1600 mm dia -do- -do- m 56049
R2-SE-13-2-f 1800 mm dia -do- -do- m 61513
R2-SE-13-2-g 2000 mm dia -do- -do- m 67337
R2-SE-13-2-h 2200 mm dia -do- -do- m 75903
R2-SE-13-2-i 2400 mm dia -do- -do- m 86698
Excavation to form horizontal bore manually for installing
1200mm(ID) RCC sewer line by pipe jacking method for maximum
drive length of 30 m, to correct grade and alignment in any type of
strata including marshy land, soft clay, murum, rock and/ or
R2-SE-13-3 m 66582
boulders of any strength and hardness. Item includes dewatering,
safety arrangements, ventilation in bore etc. but excluding muck
disposal from shaft site complete as per specifications and as
directed by the Engineer.
R2-SE-13-3-a 1400 mm dia -do- -do- m 89743
R2-SE-13-3-b 1600 mm dia -do- -do- m 117322
R2-SE-13-3-c 1800 mm dia -do- -do- m 137051
R2-SE-13-3-d 2000 mm dia -do- -do- m 154163
R2-SE-13-3-e 2200 mm dia -do- -do- m 172021
R2-SE-13-3-f 2400 mm dia -do- -do- m 190222
Approved 1200 mm diameter mild steel (M.S) pipe (16mm
thickness) sleeveconforming to jacking pipe as per IS
3589/ASTM/BS ; supplied, jointed and installed to correct line and
R2-SE-13-4 m 65056
grade by pipe jacking for providing sewer by trenchless technology
etc. complete as per specifications and as directed by the Engineer

R2-SE-13-4-a 1400 mm dia (20mm thickness) -do- -do- m 82109


R2-SE-13-4-b 1500 mm dia (22mm thickness) -do- -do- 88234
R2-SE-13-4-c 1600 mm dia (22 mm thickness)-do- -do- m 94358
R2-SE-13-4-d 1700 mm dia (22 mm thickness)-do- -do- 98070

25 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
R2-SE-13-4-e 1800 mm dia (22 mm thickness)-do- -do- m 101783
Grouting in annular spaces for between carrier and casing pipe with
R2-SE-13-5 cement mortar (1:3) including necessary additive,equipment etc cum 6938
complete as per specification and as directed by Engineer

26 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
XIV HORIZONTAL DIRECTIONAL DRILLING AND PIPE
INSTALLATION
Providing, Laying and Jointing of 280mm dia (OD) HDPE pipe (PN 6
Class-PE 80 grade: IS 14333) to correct grade and alingnment from
3m upto 5m depth including boring, Pilot inclined dilling from
exisitng ground level upto required depth (invert level) on rig side of
proposed gravity sewer line (i.e. entry side) and Final inclined boring
from exisitng ground level upto required depth (invert level) or
R2-SE-14-1 m 48431
vicecversa on pipe side (i.e. exit side) of proposed gravity sewer line
using Horizontal Directional Drilling method in any type of ground
including soft soil, mixed ground and soft/hard rock. Length of
gravity sewer line between inner faces of two consecutive proposed
manholes will be considered for measurement.

R2-SE-14-1-a 315 mm dia -do- -do- m 49128


R2-SE-14-1-b 355mm dia -do- -do- m 58606
R2-SE-14-1-c 400 mm dia -do- -do- m 59875
R2-SE-14-1-d 450 mm dia -do- -do- m 61539
R2-SE-14-1-e 500 mm dia -do- -do- m 76062
R2-SE-14-1-f 560 mm dia -do- -do- m 78301
R2-SE-14-1-g 630 mm dia -do- -do- m 81230
Providing, Laying and Jointing of 710mm dia (OD) HDPE pipe (PN 6
Class-PE 100 grade: IS 14333) to correct grade and alingnment
from 3m upto 5m depth including boring, Pilot inclined dilling from
exisitng ground level upto required depth (invert level) on rig side of
proposed gravity sewer line (i.e. entry side) and Final inclined boring
from exisitng ground level upto required depth (invert level) or
R2-SE-14-2 m 104850
vicecversa on pipe side (i.e. exit side) of proposed gravity sewer line
using Horizontal Directional Drilling method in any type of ground
including soft soil, mixed ground and soft/hard rock. Length of
gravity sewer line between inner faces of two consecutive proposed
manholes will be considered for measurement.

R2-SE-14-2-a 800mm dia -do- -do- m 106380


R2-SE-14-2-b 900mm dia -do- -do- m 119140
R2-SE-14-2-c 1000mm dia -do- -do- m 123656
Providing, Laying and Jointing of 280mm dia (OD) HDPE pipe (PN 6
Class-PE 80 grade: IS 14333) to correct grade and alingnment
above 5m upto 8m depth including boring, Pilot inclined dilling from
exisitng ground level upto required depth (invert level) on rig side of
proposed gravity sewer line (i.e. entry side) and Final inclined boring
from exisitng ground level upto required depth (invert level) or
R2-SE-14-3 m 52591
vicecversa on pipe side (i.e. exit side) of proposed gravity sewer line
using Horizontal Directional Drilling method in any type of ground
including soft soil, mixed ground and soft/hard rock. Length of
gravity sewer line between inner faces of two consecutive proposed
manholes will be considered for measurement.

R2-SE-14-3-a 315 mm dia -do- -do- m 53288


R2-SE-14-3-b 355mm dia -do- -do- m 63377
R2-SE-14-3-c 400 mm dia -do- -do- m 64646
R2-SE-14-3-d 450 mm dia -do- -do- m 66311
R2-SE-14-3-e 500 mm dia -do- -do- m 81751
R2-SE-14-3-f 560 mm dia -do- -do- m 83990
R2-SE-14-3-g 630 mm dia -do- -do- m 86919

27 Sewerage Schedule
SE SCHEDULE 2018

Schedule Item Description Unit /


Rate (Rs.)
No. Per
Providing, Laying and Jointing of 710mm dia (OD) HDPE pipe (PN 6
Class-PE 100 grade: IS 14333) to correct grade and alingnment
above 5m upto 8m depth including boring, Pilot inclined dilling from
exisitng ground level upto required depth (invert level) on rig side of
proposed gravity sewer line (i.e. entry side) and Final inclined boring
from exisitng ground level upto required depth (invert level) or
R2-SE-14-4 m 113597
vicecversa on pipe side (i.e. exit side) of proposed gravity sewer line
using Horizontal Directional Drilling method in any type of ground
including soft soil, mixed ground and soft/hard rock. Length of
gravity sewer line between inner faces of two consecutive proposed
manholes will be considered for measurement.

R2-SE-14-4-a 800mm dia -do- -do- m 115127


R2-SE-14-4-b 900mm dia -do- -do- m 120147
R2-SE-14-4-c 1000mm dia -do- -do- m 124662
XIV HORIZONTAL DIRECTIONAL DRILLING AND PIPE
INSTALLATION FOR STREET CONNECTIONS
Providing, Laying and Jointing of 160mm dia (OD) HDPE pipe (PN 6
Class-PE 80 grade: IS 14333) to correct grade and alingnment upto
2.1m depth including boring, Pilot inclined dilling from exisitng
ground level upto required depth (invert level) on rig side of
R2-SE-14-5 proposed gravity sewer line (i.e. entry side) using Horizontal m 33362
Directional Drilling method in any type of ground including soft soil,
mixed ground and soft/hard rock. Length of gravity sewer line i.e.
actual pipe laid will be considered for measurement.

R2-SE-14-5-a 200 mm dia -do- -do- m 33863

28 Sewerage Schedule

You might also like