Professional Documents
Culture Documents
1 Sewerage Schedule
SE SCHEDULE 2018
R2-SE-1-3 Transporting surplus materials upto 3 Km. including levelling. cum R2-CS-EW-8
[Note : Prior Specific sanction of Head of Deptt. should be taken if
transportation is to be done at night i.e. between 8.00 pm. to 6
am.and the rate should be reduced by 10%] {This item will be
operated with the specific sanction of the C.E./Chief Engineer and
above}
2 Sewerage Schedule
SE SCHEDULE 2018
3 Sewerage Schedule
SE SCHEDULE 2018
M 15 = 1:2:4
M 20 = 1: 1 1/2 : 3
Providing & laying M 10 c.c. For foundation/bedding including
R2-SE-2-1 cum 6122
boxing, curing etc. complete as specified and as directed.
R2-SE-2-2 -do- -do- for full encasement or cradle -do- -do- cum 6822
R2-SE-2-3 -do- -do- in saddle block -do- -do- cum 7337
-do- -do- M 15 c.c. In foundation including boxing, curing etc.
R2-SE-2-4 cum 7335
complete as specified and as directed.
R2-SE-2-5 -do- -do- M 15 c.c. For full encasement or cradle -do- -do- cum 7354
R2-SE-2-6 -do- -do- in sides and haunches and/or in block coping-do- -do- cum 8067
R2-SE-2-7 do- -do- in saddle block -do- -do- cum 7850
R2-SE-2-8 -do- -do- in arch work -do- -do- cum 8355
R2-SE-2-9 Providing and laying M 20 c.c. In foundations -do- -do- cum 7863
-do- -do- in sides and haunches and /or block coping -do- -do-
R2-SE-2-10 cum 8575
R2-SE-2-11 -do- -do- in arch work -do- -do- cum 8863
REINFORCED CONCRETOR
Note: 1. Wastage in cutting will not be paid for. Only steel actually
fixed in position will be paid by linear measurement including hooks
& bends. No payment will be made for binding wires, pins be made
for binding wires, pins, chairs and laps and / or welding and this
should be noted while quoting the rates.
2. In working out the rates for .R.C.C. Items and steel
reinforcement, the basic rates for steel bars per tonne are taken as
mentioned in Basic Material Master, If steel is controlled in future
the necessary adjustment between the controlled rate and the rates
stated above will have to be made.
3. Note of concretor: (b) is applicable here(controlled concrete).
Providing M 15 R.C.C. Work in dhapas, beams and slabs etc. with
standard reinforcement of 1% including centering etc. and finished
R2-SE-2-12 cum 12407
smooth the exposed surface with cement sand plaster 12 mm thick
in the proportion 1:2 as directed.
R2-SE-2-13 -do- without reinforcement -do- do- cum 9110
R2-SE-2-14 -do- M20 RCC work-do- as per item no R2-SE-2-12 cum 12915
R2-SE-2-15 -do- without reinforcement -do- do- cum 9618
4 Sewerage Schedule
SE SCHEDULE 2018
5 Sewerage Schedule
SE SCHEDULE 2018
6 Sewerage Schedule
SE SCHEDULE 2018
7 Sewerage Schedule
SE SCHEDULE 2018
8 Sewerage Schedule
SE SCHEDULE 2018
9 Sewerage Schedule
SE SCHEDULE 2018
10 Sewerage Schedule
SE SCHEDULE 2018
R2-SE-6-4-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 20912
Constructing on sewer brick masonary trapezoidal manhole 1.5M x
1.2M at bottom and 0.9M x 0.6M at top, including C.I. EHD airtight
R2-SE-6-5 rectangular frame and cover weighing minimum 270 kg . complete No 72618
as per description in Item No.R2-SE-6-1 depth upto 1.2M
R2-SE-6-5-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 22899
11 Sewerage Schedule
SE SCHEDULE 2018
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-6-a including safety chain and extra C.I steps on other side of benching- m.depth 44019
do-do-
R2-SE-6-6-b Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 63597
R2-SE-6-6-c Do- -do- above 9M and upto 11M depth -do- -do- m.depth 89292
R2-SE-6-6-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 122826
R2-SE-6-6-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 161111
Constructing brick masonary trapezoidal manhole on sewer 2.4M x
1.5M at bottom and 0.9M x 0.6M at top built in brick masonary in
C.M. 1:3 plastered both inside and outside with 20 mm thick cement
plaster in C.M. 1:2 and neat cement rendering so as to give a
smooth surface 300 mm thick M 20 cement concrete in foundation
and in haunches and channels finished smooth with 20 mm cement
plaster in C.M. 1:1 and providing C.I. steps (approximately weighing
5.4 kg each)staggered at 300mm c/c. including 75 mm wide vata all
round the external portion of the manhole and the foundation
concrete in cement mortar 1:1 and supporting the incoming pipes
R2-SE-6-7 with brick masonary wherever necessary including 0.9m x 0.6M C.I. No 239650
EHD airtight rectangular frame and cover weighing minimum 270 kg
resting on 300mm high cement concrete M20 cap with necessary
centering including cement plaster (1:2) on both sides neat cement
rendering so as to give a smooth surface in line and level including
safety chain and extra C.I steps on other side benching complete as
per standard specifications & directions and as per drawing in
Dy.Ch.E. (SP) P&D's office without excavation depth upto
4.5M
Extra per metre depth of the above manhole -do- -do- as per above
R2-SE-6-7-a m.depth 71930
item -do- -do- from 4.5 to 9M depth.
R2-SE-6-7-b Do- -do- above from 9M and upto 11M depth -do- -do- m.depth 100672
R2-SE-6-7-c Do- -do- above from 11 M and upto 12 M depth -do -do- m.depth 137910
R2-SE-6-7-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing on sewer brick masonry scraper manhole 1.5M x 1.5
M at bottom and 1.2 M x 0.9M at top, including C.I. EHD airtight
R2-SE-6-8 No 226634
rectangular frame and cover weighing minimum 900 kg . complete
as per description in Item No.R2-SE-6-1 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-8-a including safety chain and extra C.I steps on other side of benching- m.depth 40863
do-do-
R2-SE-6-8-b Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 59228
R2-SE-6-8-c Do- -do- above 9M and upto 11M depth -do- -do- m.depth 83497
R2-SE-6-8-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 115356
R2-SE-6-8-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 151870
Constructing on sewer brick masonry scraper manhole 1.8M x 1.5M
at bottom and 1.2M x 0.9M at top , including C.I. EHD airtight
R2-SE-6-9 rectangular frame and cover weighing minimum 900 kg etc. No 236136
complete as per description in item No. R2-SE-6-1 depth upto 2.9M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-9-a including safety chain and extra C.I steps on other side of benching- m.depth 44019
do-do-
R2-SE-6-9-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 63597
12 Sewerage Schedule
SE SCHEDULE 2018
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-10-a including safety chain and extra C.I steps on other side of benching- m.depth 47050
do-do-
R2-SE-6-10-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 67830
R2-SE-6-10-c Do- -do- above 9 M and upto 11M depth -do- -do- m.depth 94947
R2-SE-6-10-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 130149
R2-SE-6-10-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 170352
Constructing brick masonary scraper type manhole on sewer 2.4M x
1.5M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item No. R2-SE-6-8 including C.I.
R2-SE-6-11 No 335566
Rectangular EHD air tight frame and cover ( weighing minimum
900 kg ), safety chain and extra C.I. steps, depth upto 4.5M
Extra for above manhole per metre depth above 4.5M and upto 9M
R2-SE-6-11-a m.depth 71930
depth.
R2-SE-6-11-b do- -do- 9 M to 11M depth m.depth 100672
R2-SE-6-11-c do- -do- 11 M to 12M depth m.depth 137910
R2-SE-6-11-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing brick masonary scraper type manhole on sewer 2.4M x
2.4M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no. R2-SE-6-8 including C.I.
R2-SE-6-12 No 386962
Rectangular EHD airtight frame and cover weighing minimum 900
kg, safety chain and extra C.I. steps, depth upto 4.5 M.
R2-SE-6-12-a Extra for above manhole above 4.5M to 9M depth m.depth 84820
R2-SE-6-12-b -do- -do- 9 M to 11 M depth m.depth 117848
R2-SE-6-12-c -do- -do- 11 M to 12 M depth m.depth 159733
R2-SE-6-12-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 207317
Constructing brick masonary scraper type manhole on sewer 3M x
2M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no. R2-SE-6-8 including C.I.
R2-SE-6-13 No 373794
Rectangular EHD aritight frame and cover weighing minimum 900
kg safety chain and extra C.I steps, depth upto 4.5 M.
R2-SE-6-13-a Extra for above manhole above 4.5M to 9M depth m.depth 85452
R2-SE-6-13-b -do- -do- 9 M to 11 M depth m.depth 121679
R2-SE-6-13-c -do- -do- 11 M to 12 M depth m.depth 164664
R2-SE-6-13-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 213494
Constructing brick masonary scraper type manhole on sewer 3M x
3M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no.R2-SE-6-10 including C.I.
R2-SE-6-14 No 427473
Rectangular EHD aritight frame and cover weighing minimum 900
kg, safety chain extra C.I. steps depth upto 4.5 M.
R2-SE-6-14-a Extra for above manhole above 4.5M to 9M depth m.depth 99556
R2-SE-6-14-b -do- -do- 9 M to 11 M depth m.depth 140884
R2-SE-6-14-c -do- -do- 11 M to 12 M depth m.depth 189438
R2-SE-6-14-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 244432
13 Sewerage Schedule
SE SCHEDULE 2018
R2-SE-6-17-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 20912
Constructing on sewer brick masonary trapezoidal manhole 1.5M x
1.2M at bottom and 0.9M x 0.6M at top, including SFRC. EHD
R2-SE-6-18 rectangular frame and cover and copolymer steps complete as per No 43047
description in Item No.R2-SE-6-15 depth upto 1.2M
R2-SE-6-18-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 22899
14 Sewerage Schedule
SE SCHEDULE 2018
Extra per metre depth of the above manhole -do- -do- as per above
R2-SE-6-20-a m.depth 71930
item -do- -do- from 4.5 to 9Mdepth.
R2-SE-6-20-b Do- -do- above from 9M and upto 11M depth -do- -do- m.depth 100672
R2-SE-6-20-c Do- -do- above from 11 M and upto 12 M depth -do -do- m.depth 137910
R2-SE-6-20-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing on sewer brick masonry scraper manhole 1.5M x 1.5
M at bottom and 1.2 M x 0.9M at top, including SFRC EHD
R2-SE-6-21 No 116759
rectangular frame and cover and copolymer steps. complete as per
description in Item No.R2-SE-6-15 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-21-1 including safety chain and extra copolymer steps on other side of m.depth 40863
benching-do-do-
R2-SE-6-21-2 Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 59228
R2-SE-6-21-3 Do- -do- above 9M and upto 11M depth -do- -do- m.depth 83497
R2-SE-6-21-4 Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 115356
R2-SE-6-21-5 Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 151870
Constructing on sewer brick masonry scraper manhole 1.8M x 1.5M
at bottom and 1.2M x 0.9M at top , including SFRC Rectangular
R2-SE-6-22 EHD frame and cover and copolymer steps. complete as per No 126253
description in item No. R2-SE-6-15 depth upto 2.9M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-22-a including safety chain and extra co-polymer steps on other side of m.depth 44019
benching-do-do-
R2-SE-6-22-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 63597
R2-SE-6-22-c Do- -do- above 9 M and upto 11M depth -do- -do- m.depth 89292
R2-SE-6-22-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 122826
15 Sewerage Schedule
SE SCHEDULE 2018
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-23-a including safety chain and extra copolymer steps on other side of m.depth 47050
benching-do-do-
R2-SE-6-23-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 67830
R2-SE-6-23-c Do- -do- above 9 M and upto 11M depth -do- -do- m.depth 94947
R2-SE-6-23-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 130149
R2-SE-6-23-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 170352
Constructing brick masonary scraper type manhole on sewer 2.4M x
1.5M at bottom 1.2M x 0.9M at top built in brick masonary in C.M.
R2-SE-6-24 1:3 -do- -do- as per item No. R2-SE-6-8 including SFRC. No 225119
Rectangular EHD frame and cover and copolymer steps, safety
chain and extra steps, depth upto 4.5M
Extra for above manhole per metre depth above 4.5M and upto 9M
R2-SE-6-24-a m.depth 71930
depth.
R2-SE-6-24-b -do- -do- 9 M to 11M depth m.depth 100672
R2-SE-6-24-c -do- -do- 11 M to 12M depth m.depth 137910
R2-SE-6-24-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing brick masonary scraper type manhole on sewer 2.4M x
2.4M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no. R2-SE-6-17 including SFRC
R2-SE-6-25 No 274749
Rectangular EHD frame and cover with copolymer steps, safety
chain and extra steps, depth upto 4.5M.
R2-SE-6-25-a Extra for above manhole above 4.5M to 9M depth m.depth 84820
R2-SE-6-25-b -do- -do- 9 M to 11 M depth m.depth 117848
R2-SE-6-25-c -do- -do- 11 M to 12 M depth m.depth 159733
R2-SE-6-25-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 207317
Constructing brick masonary scraper type manhole on sewer 3M x
2M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no. R2-SE-6-25 including SFRC
R2-SE-6-26 No 263600
Rectangular EHD frame and cover with copolymer steps, safety
chain and extra steps, depth upto 4.5 M.
R2-SE-6-26-a Extra for above manhole above 4.5M to 9M depth m.depth 85452
R2-SE-6-26-b -do- -do- 9 M to 11 M depth m.depth 121679
R2-SE-6-26-c -do- -do- 11 M to 12 M depth m.depth 164664
R2-SE-6-26-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 213494
Constructing brick masonary scraper type manhole on sewer 3M x
3M at bottom and 1.2M x 0.9M at top built in brick masonary in
C.M. 1:3 -do- -do- as per item no.R2-SE-6-25 including SFRC
R2-SE-6-27 No 317279
Rectangular EHD frame and coverwith copolymer steps, safety
chain and extra steps, depth upto 4.5 M.
R2-SE-6-27-a Extra for above manhole above 4.5M to 9M depth m.depth 99556
R2-SE-6-27-b -do- -do- 9 M to 11 M depth m.depth 140884
R2-SE-6-27-c -do- -do- 11 M to 12 M depth m.depth 189438
R2-SE-6-27-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 244432
16 Sewerage Schedule
SE SCHEDULE 2018
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-1-a m.depth 3234
item.
Do- -do- 230 mm dia stone ware pipe of SP2 class in vertical drop
R2-SE-7-2 No 7818
upto 0.6M -do- -do- as per item R2-SE-7-1
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-2-a m.depth 4992
item.
Do- -do- 300 mm dia stone ware pipe of SP2 class in vertical drop
R2-SE-7-3 No 18198
of 0-6m -do- -do- as per item R2-SE-7-1
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-3-a m.depth 6211
item.
Providing 160 mm dia HDPE pipes of PE-80 grade and PN-6 class
in vertical drop of 0.6m including 160mm dia HDPE pipes fixed in
brick masonary of the manhole at required level and providing
160mm dia HDPE right angled bend, 160mmx160mmx160mm
HDPE double tee junction including cutting and jointing as per
detailed specifications,encased in half brick thick masonary in
cement mortar (1:3) all round the pipes,double tee,bend and extra
R2-SE-7-4 No 5862
brickwork below bend upto the foundation of the manhole and
tapering portion of the manhole plastering,plastering the exposed
surfaces after raking out the joints of the masonary to a depth of
20mm in CM(1:2) 20mm thick and neat cement rendering so as to
give smooth surface,including plugging the openings etc complete
as directed and asper drawing in Dy CE(SP)P&D's office
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-4-a m.depth 3409
item
Do- -do- 200 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-5 vertical drop of 0.6M -do- -do- as in item No.R2-SE-7-4 No 9509
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-5-a m.depth 5178
item
Do- -do- 250 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-6 vertical drop of 0.6M -do- -do- as in item No.R2-SE-7-4 No 14022
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-6-a m.depth 6643
item
Do- -do- 280 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-7 vertical drop of 0.6M -do- -do- as in item No.R2-SE-7-4 No 18809
17 Sewerage Schedule
SE SCHEDULE 2018
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-8-a m.depth 8171
item
Do- -do- 355 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-9 vertical drop of 0.9M -do- -do- as in item No.R2-SE-7-4 No 42759
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-10-a m.depth 12089
item
Do- -do- 450 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-11 vertical drop of 0.9M -do- -do- as in item No.R2-SE-7-4 No 63971
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-11-a m.depth 14220
item
Do- -do- 500 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-12 vertical drop of 1.2M -do- -do- as in item No.R2-SE-7-4 No 84842
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-12-a m.depth 16473
item
Do- -do- 560 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-13 vertical drop of 1.2M -do- -do- as in item No.R2-SE-7-4 No 111442
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-13-a m.depth 18644
item
Do- -do- 630 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-14 vertical drop of 1.2M -do- -do- as in item No.R2-SE-7-4 No 193961
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-14-a m.depth 22644
item
18 Sewerage Schedule
SE SCHEDULE 2018
Extra over above for every additional metre depth upto 2.5M -do- -
R2-SE-8-1-a m.depth 13531
do-etc. complete as specified and directed.
Constructing brick masonary inspection chamber rectangular 0.9M x
0.6M and 0.6M deep -do- including M 20, 30 cm thick cap c.c.
Bedding & including C.I. extra heavy duty air tight frame and cover
R2-SE-8-2 No 49457
weighing minimum 270kg complete as per description in item No.
R2-SE-8-1 with necessary centering etc. all complete as per plan
and directed.
Extra over above for every additional metre depth upto 2.5M -do- -
R2-SE-8-2-a m.depth 15442
do- etc. complete as specified and directed.
Constructing brick masonary inspection chamber rectangular 0.75M
x 0.75M and 0.6M deep -do- -do- as per description in item no R2-
R2-SE-8-3 SE-8-1 including CI extra heavy duty air tight frame and cover No 46928
weighing minimum 275 kg complete as per plan and directed
Extra over above for every additional metre depth upto 2.M -do- -do-
R2-SE-8-3-a m.depth 15412
with necessary centering etc. all complete as per direction.
Constructing brick masonary inspection chamber rectangular 0.6M x
0.6M and 0.6M deep -do- -do- etc. complete as per description in
R2-SE-8-4 item no R2-SE-8-1 including CI extra heavy duty air tight frame and No 39418
cover weighing minimum 200 kg complete as per plan and directed.
Extra over above for every additional metre depth upto 2.M -do- -do-
R2-SE-8-4-a m depth 13456
with necessary centering etc. all complete as per direction.
Constructing brick masonary inspection chamber rectangular 0.9M x
0.45M and0.6M deep on sewer with 230mm brick walls in cement
mortar 1:3 plastered both inside & outside with 20 mm thick
cement mortar 1:2 and neat cement rendering so as to give a
smooth surface including 230mm cement concrete bedding (M 15)
and cement concrete (M 15) in haunches and channels finished
smooth with 20 mm thick cement mortar( 1:1) and fixing SFRC
R2-SE-8-5 No 16604
extra heavy dutyrectangular frame & cover of size 0.9M x 0.45M.
resting on 300 mm high c.c. cap M 20 with (1:1) cement plaster on
both the sides & necessary co-polymer. steps staggered at 300mm
c/c. including 75 mm wide vata all round the external portion of the
chamber and the foundation concrete in C.M. 1:1 etc. complete as
per plan in Dy.Ch.E.(SP)P&D's office( without excavation ) .
Extra over above for every additional metre depth upto 2.5M -do- -
R2-SE-8-5-a m.depth 12482
do- etc. complete as specified and directed.
19 Sewerage Schedule
SE SCHEDULE 2018
20 Sewerage Schedule
SE SCHEDULE 2018
C.I. Shoe bend 150 mm dia fixed complete including cutting through
R2-SE-9-2 masonary, cornices etc. and making good the same including No 1670
painting as directed.
R2-SE-9-3 Collar for C.I.pipes 150mm.dia.fixed complete including painting. No 4885
Removing zinc galvanised sheet /cast iron vent shafts including all
fittings and appliances and making good the masonary work
R2-SE-9-4 m 309
including cornices painting and stacking the material wherever
directed etc.complete.
Removing and refixing -do-do-on the same site (for galvanised
R2-SE-9-5 m 682
sheet/cast iron vent shaft).
R2-SE-9-5-a -do- -do- on different site in the same locality -do- -do- m 904
Brick masonary flue chamber for vent shaft 0.375M x 0.375M x 0.6M
deep of 230 mm brick wall in C.M.1:3 and 20 mm cement and sand
plaster on both sides in C.M. 1:2 finished smooth including 150 mm
R2-SE-9-6 No 7273
M15 cement concrete bedding and 150 mm thick reinforcement
concrete dhapas built complete including excavation etc. as
specified and directed
Removing & refixing of C.I. Vent shaft complete as directed including
R2-SE-9-7 transporting to municipal stores anywhere in City/suburbs. No 4440
21 Sewerage Schedule
SE SCHEDULE 2018
22 Sewerage Schedule
SE SCHEDULE 2018
23 Sewerage Schedule
SE SCHEDULE 2018
24 Sewerage Schedule
SE SCHEDULE 2018
25 Sewerage Schedule
SE SCHEDULE 2018
26 Sewerage Schedule
SE SCHEDULE 2018
27 Sewerage Schedule
SE SCHEDULE 2018
28 Sewerage Schedule