This document contains a network diagram for a proposed 18-storey mixed use building project. The diagram outlines 17 activities from invitation to bid through testing and commissioning. Key activities include preparation of bids, evaluation and comparison, award of contract, installation of plumbing fixtures, vent system, cold water system, and testing and commissioning of the plumbing works. The contractor is Yomeco Cons. & Dev. Corporation and the project is located in Paranaque City.
This document contains a network diagram for a proposed 18-storey mixed use building project. The diagram outlines 17 activities from invitation to bid through testing and commissioning. Key activities include preparation of bids, evaluation and comparison, award of contract, installation of plumbing fixtures, vent system, cold water system, and testing and commissioning of the plumbing works. The contractor is Yomeco Cons. & Dev. Corporation and the project is located in Paranaque City.
This document contains a network diagram for a proposed 18-storey mixed use building project. The diagram outlines 17 activities from invitation to bid through testing and commissioning. Key activities include preparation of bids, evaluation and comparison, award of contract, installation of plumbing fixtures, vent system, cold water system, and testing and commissioning of the plumbing works. The contractor is Yomeco Cons. & Dev. Corporation and the project is located in Paranaque City.
5CE-1 MEMBERS: BROTONEL, ANDIE L. ILAGAN, MA. MONICA V. MALABANAN,GIAN MICKEL C.
PROJECT: PROPOSED 18-STOREY MIXED USED BUILDING
LOCATION: DIOSDADO MACAPAGAL BLVD. PARANAQUE CITY SCOPE OF WORKS: PLUMBING WORKS CONTRACTOR : YOMECO CONS. & DEV. CORPORATION SUBJECT : BILL OF QUANTITIES
ACTIVITY PREDECESSOR DURATION (WEEKS)
A. INVITATION TO BID NONE 1 B. INSTRUCTIONS TO BIDDERS A 3 C. PREPARATION OF BIDS B 17 D. SUBMISSION AND OPENING OF BIDS C 17 E. EVALUATION AND COMPARISON D 2 F. AWARD OF CONTRACT E 8 PROJECT G.EQUIPMENTS Q 32 H.CONDENSATE DRAIN SYSTEM N 116 I. STORM DRAIN SYSTEM NONE 128 J. SUMP PIT / ELEVATOR PIT DISCHARGE Q 40 K. SEWER SYSTEM NONE 134 L. SEWAGE PIT DISCHARGE PIPE O 96 M. KITCHEN WASTE SYSTEM L 65 N.VENT SYSTEM R 124 O. COLD WATER SYSTEM H 112 P. VALVES AND ANCILLARIES O and Q 112 Q.PLUMBING FIXTURES R 36 R. PRELIMINARIES I and K 152 S.TESTING AND COMMISSIONING Q 108 NETWORK DIAGRAM ACTIVITY ON NODES A