The document provides marks and feedback for Civil Engineering group 1 on their project definition and delivery system assignment. The group scored 13.5 out of 15 total marks. For their project definition, they received 6 out of 6 marks for good work defining the key elements. For their project delivery system and contract section, they received 5.5 out of 6 marks with feedback that including a figure or flowchart explaining roles would have improved it. They received 2 out of 3 marks for report quality with notes on missing figure captions and relocating table captions.
The document provides marks and feedback for Civil Engineering group 1 on their project definition and delivery system assignment. The group scored 13.5 out of 15 total marks. For their project definition, they received 6 out of 6 marks for good work defining the key elements. For their project delivery system and contract section, they received 5.5 out of 6 marks with feedback that including a figure or flowchart explaining roles would have improved it. They received 2 out of 3 marks for report quality with notes on missing figure captions and relocating table captions.
The document provides marks and feedback for Civil Engineering group 1 on their project definition and delivery system assignment. The group scored 13.5 out of 15 total marks. For their project definition, they received 6 out of 6 marks for good work defining the key elements. For their project delivery system and contract section, they received 5.5 out of 6 marks with feedback that including a figure or flowchart explaining roles would have improved it. They received 2 out of 3 marks for report quality with notes on missing figure captions and relocating table captions.
Group number WM3 Total marks (Out of 15) 13.5 No Student Name Student ID 1 2 3 4 5 6 7 Criteria Comments Marks (Out of 15) Project Definition (6 marks) Good work 6 What are the circumstances that led to the project? Who are the project stakeholders? What are the interests of each project stakeholder? What are the goals of the project? To achieve the goals of the project, what are the main products or services the project will need to create? What products/services related to this project is excluded from the project scope? Of the projects performance objectives (T,Q,C), which are likely to be the most important for the owner? What are the main resources needed for the project? What are the main constraints for implementing the project? What are the main risks in this project? Project Delivery System and Contract (6 marks) A figure or a flowchart to explain the roles of major parties would 5.5 What type of project delivery system was used to deliver the have been good. project? And why was this type of project delivery system used? What are the contractual and functional relationships among the major project stakeholders? What are the roles of major parties involved within the project delivery system? Describe the project development process and the involvement of the major parties in various stages of the process What types of contracts were used in the project? Why were they chosen? What type of tendering process was used? Why was it chosen? General Comments on report quality, formatting and Use of Some missing figure captions. Table captions should be to the top of 2 language (3 marks) the table Total (Out of 15) 13.5